Goal: Design and Construct a Mixed-Use Parking Facility, with a Minimum of 300 – 400 Public Parking Spaces, in Addition to Required Spaces for any Included.

Slides:



Advertisements
Similar presentations
Public-Private Development in Historic Savannah. SAVANNAH in the 1750s.
Advertisements

Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Waterfront Development Master Plan Kingston, Tennessee Bullock, Smith & Partners, Inc. Knoxville/Nashville, Tennessee Master Planners/Architects/Landscape.
SAVE OUR CITY: COMMUNITY DEVELOPMENT Commercial Revitalization.
Small Zone Lot Parking Exemption in all Mixed Use Commercial Zone Districts.
ACMA Conference February 8, 2007 Evaluating Investments in Infrastructure Panel Overview of Public Infrastructure Financing in the City of Phoenix.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
Tax Increment Financing Town Center Project Midwest City, OK.
Board of Trustees Meeting Comprehensive Plan and Zoning Amendments Process Monday, April 2, 2012.
East 125 th Street Development Taskforce Summary of RFP Reponses April 5, 2007.
Preservation Tax Incentives for Historic Buildings A Joint Program of the following agencies: Department of the Treasury Internal Revenue Service Department.
SDHC City Linkage Fee Stakeholders Meeting November 19,
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Town of Chapel Hill RFQ Pre-Proposal Conference Downtown Economic Development Initiative January 11, 2005.
Financial Considerations; Determining Developer’s ROI in Downtown Palmetto Bay 223 k 185 k 189 k 280k 168 k 218k 248k 196k 197k 216k 227k 236k 255k 235k.
ASU Downtown Phoenix Campus City Council February 6, 2007.
Implementing State Density Bonus Law in Berkeley November 13, 2014 City of Berkeley Planning & Development Department.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
Proposed Amendments for Palomar Airport Center dba Premier Jet Special Workshop/Meeting Palomar Airport Advisory Committee June 14, 2006.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Planning & Community Development Department Predevelopment Plan Review for Art Center College of Design Master Plan City Council June 8, 2015.
Key Boulevard Apartments A Transit-Oriented Redevelopment of Affordable Housing March 23, Key Boulevard Arlington, Virginia.
June 17, 2008 Fresno County Board of Supervisors First Public Hearing / First Reading of Ordinance Public Facilities Impact Fees and Capital Improvement.
Market Street Mall Redevelopment
University Heights One University Place TIF Plan City Council Meeting July 14, 2015.
2 Governor’s Principles for Fort Monroe Respect Fort Monroe’s history Maintain Public Access Achieve economic sustainability.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
May 24, 2008PalmRidge Park A Mixed-Use Real Estate Property for Sale in McAllen, TX.
H OUSING Housing options. H OUSING OPTIONS What should you consider when you evaluate available housing alternatives? Your lifestyle and finances What.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
“So You Want a Grocery Store...” Florida Redevelopment Association 2011 Annual Conference Don Paight Fort Myers CRA Executive Director.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Convention Center District Property Owners’ Association Long-Range Strategic Plan May 20, 2008.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Department of Sustainable Development and Construction Proposed Revision to the Historic Preservation Tax Exemptions and Economic Development Incentives.
CTC Planned Development and Development Agreement Modification January 26, 2016 Planning Commission Hearing Greg Turner, Land Use Manager.
J P LIVING At St Thomas. J P LIVING At St Thomas 7 th Street and Buchanan Street Phoenix, Ariozna Located adjacent to the Chase Ballpark in the Warehouse.
Bostwick Gardens Land Acquistion Project Presentation to the GB CPC Bostwick Gardens Land Acquistion Project Presentation to the GB CPC St. James Community.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Prepared by: Alex Fisch Planning Services Division.
ACQUISITION OF REAL PROPERTY LOCATED AT 2110, 2222 AND 2244 SOUTH AIRPORT WAY Stockton Redevelopment Agency October 7, 2008 City Council Agenda Item 6.13.
NORTH 40 SPECIFIC PLAN Advisory Committee Meeting #6 November 3, 2011.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Planning Commission Work Session February 19, 2015.
Basis of recommendation (cont.) 3.Insufficient green/open space (pgs. 3-4)  Green/open space within the site inadequate to serve estimated population.
1 Economic Development Program Agreement Sundance Square Central Plaza Robert Sturns Housing and Economic Development Department April 10, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
Community Development Department MADISON GREEN AND TUSCAN RESERVE MASTER PLANNED DEVELOPMENT AMENDMENT APPLICATION #2616.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
Major Amendment to Planned Development #65 Mercer Commons Phase IV at E. 14 th Street Neighborhoods Committee April 18, 2016.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Noyes Street 4-story mixed-use building 44 soft-loft style rental dwelling units 25% Studio, 27.5% One-BR, 27.5% Two BR, and 20% Three BR Units.
Community Dialogue about The NuCLEus Project
253 South Los Robles Avenue Predevelopment Plan Review
Large scale development groundwater balance
CFT Gateway Center ( E. Foothill Blvd
Capital Metro Downtown Station Improvements
City Council September 18, 2017
Skillman Corridor TIF District
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Valley & Third Streets Redevelopment
83 North Lake Avenue Predevelopment Plan Review
Early Learning Facilities
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
115-Unit Mixed-Use Project (711 E
Presentation transcript:

Goal: Design and Construct a Mixed-Use Parking Facility, with a Minimum of 300 – 400 Public Parking Spaces, in Addition to Required Spaces for any Included Approved Retail, Commercial and Residential Development. Objectives - Project Will Strive to Meet the Following:  High Quality Design  Cost Effective  Architectural Consistent with Downtown  User Friendly  Crime Prevention Through Environmental Design (CPTED)  Provide Local Construction Hiring Through Suncoast Workforce Board  Environmentally Responsible  Provide Fiscally Sound Mixed-Use Alternatives Goal and Objectives

 Public Involvement Process  GEO/Technical Site Research  Creation of Preliminary Engineering Designs  Conceptual Site Plans  Development of Evaluations Proposed Work Products will be Sufficient to Identify Proposed Structural Layout, Architectural Design, Number of Parking Spaces, Housing Options and Retail/Commercial Size and Location. Guaranteed Maximum Price (GMP), will be Determined.

 Provide Final Engineering Documents  Permitting  Site Work  Construction  Landscape  Streetscape

Feb 19, 2013 Mar 19, 2013 Apr 09, 2013 CRA/City Commission Approval Phase 1 Agreements Public Listening Meeting #1 Stakeholder Meetings June 3, 2013 City Commission Report/Input Public Meeting #2 June 20, CRAAB June 20, 2013 Present Concepts CRAAB Input Present Final Concept Plan and Private Sector Offerings CRAAB input Aug 22, 2013 Aug 29, 2013 Present Final Concept Plan and Private Sector Offerings

Base Plan and Option A/B Ground Level Plan “Over-Under”

Base Plan and Option A/B Ground Level Plan “Over-Under” CAR COUNT w/o OCCUPIED SPACE 9’-0” STANDARD SPACE 12’-0” ACCESSIBLE SPACE CAR VAN LEVEL STANDARD ACCESSIBLE ACCESSIBLE TOTAL CAR COUNT w/OCCUPIED SPACE 9’-0” STANDARD SPACE 12’-0” ACCESSIBLE SPACE Ground Second Third Fourth Fifth Top2200 Total Ground002 2 Second Third Fourth Fifth Top9300 Total CAR VAN LEVEL STANDARD ACCESSIBLE ACCESSIBLE TOTAL

“Pad Site”

Commercial Offering  Retail Space  Pad Site (Lemon)  Air Rights (“Over-Under”)  Combination Marketing Efforts  Site Signs  Presentation to Sarasota County Realtors  Establish Deadline July 31, Offers Received (5 Viable)  3 Utilized “Pad Site”  1 From Abutting Parcel Owner for Joint Venture  1 Utilizing the “Over-Under”

CategoriesFinergy - localYorkGithler & Assoc - local Number of Residential units36-42 rentals32-42 condos34 condos Price Point of Units$1.67 PSF 800-1,600 SF Rentals $400,000-$750,000 average $475,000$350,000-$650,000 Number of Developer floors10 (pad site) Office SFnone 8000 SF Retail SF 13,125 (garage) + 8,240 (pad) SF = 21,365 SF13, SF = 21,365 SF21,125 SF Jobs (FTE)43 Retail 32 Office, 40 Retail Project Value (supplied by proposer)$15,500,000Not provide$20-21 million Parking spaces Indicated 59 Private Required*, 371 Public, (430) 6 Levels Total 32 Private*, 398 Public (430) 6 Levels Total Purchase price - retail $ 1,000,000 $ 1,600,000$1,100,000 - $1,350,000 Option purchase price - pad liner $ 1,318,400 $ 1,200,000Included above Funding time line Cash - residential close soon as possible - retail 30 days following completion of garage Cash - residential close immediately - retail 30 days following completion of garage Requires bank financing and will need to have "cooperation of City to achieve this" Construction SequenceSimultaneous Start construction within 18 month of signing P&S Other items *Included Streetscape on North side of State St. *Incomplete information *No demonstrated experience Reverted clause - City purchase back same price minus $25,000 after 18 months job per 500 SF retail (International Council of Shopping Centers) and 1 job per 250 SF office (ICSC) 7 - *provided and paid for by developer Comparative Analysis - User Proposals for the State Street Parking Garage - Option C (Pad Site)

Comparative Analysis - User Proposals for the State Street Parking Garage - Base Plan Option A/B Categories Crown Holdings- owners of PNC building City of SarasotaJebco Ventures, Inc. - local Number of Residential units 64 Rentals 36 condonone30 condos / 100 room Hampton Inn Price Point of Units Not Providednone$200,000 - $250,000 Number of Developer floors Not provided - two liner buildings14 floors Office SF Not specificnone Retail SF 25, ,000 SF17,977 SF17,977 +/- SF Jobs (FTE) Retail34 Retail30FT & 15PT Hotel, 34 Retail Project Value (supplied by proposer) Not provided4,000,000$27,500,000 +/- Parking spaces Indicated Required to replace their ground level parking plus the needs of whatever occupied construction development407 Public, 4 Levels 78 Private*, 400 Public (478) 5 Levels Total Purchase price - retail Exchange for use of their air space subject to offer $1,887,585 +/- $105 PSF Option purchase price - pad liner Incl above N/A Funding time line N/A Cash Close 30 days after completion of garage Construction Sequence SimultaneousN/ASimultaneous Other items *Would like a liner building at each end of the development *Incomplete information They will pay all cost associated with the additional structure requirements plus the cost of their four floors job per 500 SF retail (International Council of Shopping Centers) and 1 job per 250 SF office (ICSC) 7 - *provided and paid for by developer

 Acquire Ground Floor Retail Space for $105 Sq. Ft.  10% Deposit Within 14 Days (Retail)  Construct Four Floors Above Garage  Jebco Responsible for all Construction Costs  Jebco Provide Condominium Documents  Provide Surety to Guarantee Additional Engineering Expenses  Jebco Project Manager Becomes Part of Project Team  Submit Non-Refundable Deposit of $50,o00 Within 21 Days  Acceptance of Expanded Retail Definition  Redevelopment Agreement

 Generation of Pedestrian Activity to Neighborhood  Price of Units ($200 - $250K) opens up New Market to Downtown  Provision of approximately 72 FTE Job Opportunities  Creation of New Assessed Value (approx.. $27,500,000)  Generate Additional Tourist Taxes  Better Garage Design  Covered Units on top of Garage mitigates Off-Site Light Concerns  Separation of Public vs. Private Spaces Clear  Entrance of Garage for Pedestrians on Lemon Ave Advantages  Construction Requires Limited Financing and can be concurrent with Garage  Excess Density allows the Opportunity to Sell Rights to Abutting Parcel  Private Sector Project Manager added to the Team

Economic Impact Over the First 10 Years Direct Indirect & Induced Total Total number of permanent direct and indirect jobs to be created Salaries to be paid to direct and indirect workers $10,327,777$4,074,308 $14,402,085 Economic output generated by the project's activity $39,268,197 $19,359,221 $58,627,418 Number of direct and indirect workers who will move to the County 415 Number of new residents in the County 9211 Number of new residential properties to be built in the County 000 Number of new students expected to attend local school district 314 Taxable sales and purchases expected in the County $27,189,540$770,044 $27,959,584 Workers who move to the County by Year 10 $0 The market value the firm's property on local tax rolls in Year 1 $3,595,400$0$3,595,400 Model Used IDS Sarasota County Office of Financial Management Retail Component

Economic Impact Over the First 10 Years Direct Indirect & Induced Total Total number of permanent direct and indirect jobs to be created Salaries to be paid to direct and indirect workers $1,463,908$1,150,158$2,614,066 Economic output generated by the project's activity $8,807,219$2,472,433$9,222,433 Number of direct and indirect workers who will move to the County 000 Number of new residents in the County N/A Number of new residential properties to be built in the County 280 Number of new students expected to attend local school district N/A Taxable sales and purchases expected in the County N/A Workers who move to the County by Year 10 N/A The market value the firm's property on local tax rolls in Year 1 $6,750,000 Model Used IMPLAN Sarasota County Office of Financial Management Residential Component

Economic Impact Over the First 10 Years Direct Indirect & Induced Total Total number of permanent direct and indirect jobs to be created Salaries to be paid to direct and indirect workers $14,829,010$7,562,795 $22,391,805 Economic output generated by the project's activity $63,194,380 $29,695,039 $92,889,419 Number of direct and indirect workers who will move to the County 415 Number of new residents in the County 9211 Number of new residential properties to be built in the County 000 Number of new students expected to attend local school district 314 Taxable sales and purchases expected in the County $110,333,536$1,429,368 $111,762,905 Workers who move to the County by Year 10 $0 The market value the firm's property on local tax rolls in Year 1 $13,500,000$0 $13,500,000 Model Used IDS Sarasota County Office of Financial Management Hotel Component

Economic Impact Over the First 10 Years Direct Indirect & Induced Total Total number of permanent direct and indirect jobs to be created Salaries to be paid to direct and indirect workers $26,620,695$12,787,261$39,407,956 Economic output generated by the project's activity $111,269,795$51,526,693 $160,739,269 Number of direct and indirect workers who will move to the County 8210 Number of new residents in the County Number of new residential properties to be built in the County 280 Number of new students expected to attend local school district 628 Taxable sales and purchases expected in the County $137,523,076$2,199,412 $139,722,489 Workers who move to the County by Year The market value the firm's property on local tax rolls in Year 1 $23,845,4000 Model Used IDS, IMPLAN Sarasota County Office of Financial Management Grand Total: Aggregated Impacts – Retail, Hotel, Residential

 Possible Major Encroachment into Right of Way—Elevator Tower  Table VI-1004, Building Recess—A 12 foot recess required above the second, third or fourth story.  Section VII-206(8 [10-municode])(c) Location of Parking—Requires parking garages on Primary Streets to be located in the third layer (minimum 20 feet) and provide for a liner building on entire façade.  Section VII-206(8 [10-municode]) (d) Parking Access—If parking is accessed from a Primary Street, there shall only be one point of access. Walker Parking Consultants Base Plan and Option A/B Ground Level Plan

Aug 29, 2013 Jan 13, 2014 Feb 17, 2014 Present Final Concept Plan CRA/City Commission Phase I Plans to CRAAB Review & Recommendation Provide Final Phase I Plans and GMP Contract CRA/City Commission for Approval

 Completion of Detailed Engineering and Design Plans May 2014  Complete Permitting/Begin Construction June/July 2014  Substantial Completion of Construction July 15, 2015