Classroom Technology Fall 2009 Update Presentation to the UTFAB Tuesday, October 27, 2009 By - Douglas Satterfield Classroom Support Services-ACNS, ext October 27,
UTFAB Fall Update Classroom Technology 2009/ 2010 BuildingRoomCapacity 1Glover201*65 2Education105B*24 * Summer 2009 Facilities remodel GA - Rooms Completed Summer 2009 Complete Summer of 2009 October 27,
UTFAB Fall Update Classroom Technology 2009/ 2010 BuildingRoom 1Industrial101 2Sciences102 3************116 4Industrial122 5Sciences201 UTFAB/Applied Human Science 50/50 Funding – New Rooms Complete Summer of 2009 October 27,
4 12 Rooms – 7 Rooms to Maintain 5-year Refresh Cycle and Upgrade to Wide Screen HD capable resolutions BuildingRoomCapacity 1 AylesworthC Glover ChemistryA ChemistryA Engineering Plant SciencesC Classroom Technology 2009/ 2010 Large Capacity rooms needing Technology Refreshes Complete Summer of 2009
October 27, Current Smart Classroom Overview 148 General Assignment Classrooms 119 (80%) are technology equipped “Smart Classrooms” 29 GA Classrooms remain w/o Smart Technology 7 New Rooms FY (non Smart) at the end of FY (85 %) Classroom Technology 2009/ 2010
October 27, New Large Lectern Classrooms BuildingRoomCapacity 1ClarkC360*40 2ClarkC361*45 3ClarkC362*37 4EngineeringB237 5EngineeringB327 6Education1342 7NESBB Animal Science114Non GA 50/50 funding Classroom Technology 2009/ 2010 Large Smart Classrooms with Wide Screen Projectors and Document Cameras
Refresh Technology Highlights New wide-screen projectors – 5 years warranty New screens New upscaling DVD players (HDMI) BluRay players in Auditorium Rooms Updated control systems – 6 rooms New, brighter lower maintenance projectors Inorganic LCD panels / DLP Light Engines Long-life filters Best Image available at the best value October 27, All Equipment is thoroughly tested before it is chosen for a classroom
October 27, Refresh Rooms Continued BuildingRoomCapacity 1 Anatomy ZoologyE112*25 2 EngineeringE106*28 3 EngineeringE204*54 4 EngineeringE205*54 5 Wagar231*265 6 Wagar232*300 Classroom Technology 2009/ 2010 Continued: Projector upgrades and new Control Systems added *These rooms will have Controls System upgrades with no additional hardware cost – Equipment will come from existing stock.
October 27, Equpment Totals$0.00$148, Materials, cables, hardware and supplies$6,057.12$ CSS Installation $65/hr)$42,835.00$0.00 CSS Crestron Control System Programming $65/hr)$10,075.00$0.00 Electrical outlets for lectern and projector charged by Facilities $315.00)$4,805.50$ Removal of old Electric Screen and reinstallation of new by Facilities$2,000.00$0.00 Total Expenses$65,772.62$149, Approved$220, Unallocated$17, UTFAB Fall 2009 – Updated Totals
October 27, Integrate more Lectern PC’s to Smart Rooms – Approximately $1, per room – Clark Awing Remodel – A103 – A102 – A201 – A202 – A203Clark Awing Remodel Additional LCD Flat Panels Monitors for Education 13 (Long Room) $3,000.00Education 13 Clark Remodel PC – A103 – A102 – A201 – A202 – A2031,000.00$5, Flat Panels Monitors for Education 13$1,500.00$3, Totals$8, Proposed Use of FY2010 Unallocated (Remaining) Funds
Continue with Classroom Upgrades and Technology Refreshes To complete the remaining G.A. Classrooms by FY 2013 – (22 remaining beyond FY 2010) Integrate more Lectern PC’s to Smart Rooms Continue with I-Clicker Technology (49 rooms) Add Small Document Camera to Small Lecterns October 27, Three Year Plan:
12 Thank You! For your continued support From Everyone in Classroom Support Services October 27, 2009
13 Questions and Discussions Questions regarding FY 10 Plan? Other exciting new areas of the CSU Campus Clark Awing Renovation The New AIB Building Rockwell expansion Renovated TILT Building