R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
LKr readout: present and future R. Fantechi 30/8/2012.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
“L1 farm: some naïve consideration” Gianluca Lamanna (CERN) & Riccardo Fantechi (CERN/Pisa)
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
RunControl status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 14/10/2015.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
R. Fantechi. TDAQ commissioning Coordination activity started on January Several items to be attacked already in January Regular meetings: 15/1, 29/1,
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
Status of the NA62 network R. Fantechi 23/5/2012.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
“CHEF board” Gianluca Lamanna & Riccardo Fantechi (CERN) TDAQ meeting
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
A. Salamon - TDAQ WG Pisa 27/03/ Lkr/L0 Trigger V. Bonaiuto, N. De Simone, L. Federici, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Status of NA62 straw readout
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
Level-zero trigger status
LAV front-end and readout status
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Online Control Program: a summary of recent discussions
ProtoDUNE Installation Workshop - DAQ
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
Presentation transcript:

R. Fantechi 2/09/2014

Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week 7/7: full-speed writing test on PC farm at CERN: at least 4 TEL62 plus other systems (CREAM) and run control Week 21/7: L0TP test with primitives from LKr/L0, MUV3, LAV, RICH and CHOD Week 28/7: L0TP test with primitives from LKr/L0, 1 CREAM crate + 1 set of TEL62 + farm (Salamon, De Simone, Venditti, Fantechi) Week 28/7: XML configuration file test from run control to all subdetectors Week 4/8: have the maximum possible hardware installed, with at least one complete readout chain from each sub- detector Week 18/8: GPU test with simulated primitives from 2 RICH sources and local writing Week 15/9: full-speed readout test with 10 MHz primitives from all L0 subdetectors and 1 MHz readout Done Pcfarm installed, tests done with CREAMs and 1 TEL62 Test with 2 TEL62, integration with run control Then completed with CREAM readout, fake triggers Integration of L0TP, Tdspy, LKR calib, LKR init Not done, add few more TEL62, run with multiple destination PCs See Lamanna’s talk Start to setup various detectors, according to TEL62 arrival

Activities during the last months PC farm Network L0TP LKr readout LKr trigger Run control Cabling, crates, etc

PC farm PC Farm installed 30 dual 8-core machines Possibility to install one GPU each 10 Gb links to the router for data input 1 Gb links to the mergers 2 new merger machines In addition to the existing one Output connected to the CDR Actually 21 machines configured and running Complete installation soon, move old machines as dev ones Cooling installation under completion

PC farm – Software and CDR Continuous exercising of the PC farm SW Mainly to test the CREAM system Several bugs found and fixed More tests needed to understand high rate capabilities Also with many more TEL62 running at full L0 speed Need of specific debug tools CDR configuration Followed by Paolo Valente and Emanuele Leonardi 2012 scripts upgraded with the help of Felice Pantaleo Setup of a run/burst bookkeeping facility

Network Router All the fibers from ECN3 connected Only missing the three connection to GTK (in the same room) 1-2 ports left free Switches Al switches ready with the basic configuration Specific configurations done Mirror ports for LKr and the last switches installed, to be extended to all Multicast capabilities for the LKr Link with the CDR To be moved to 10 Gb (1 st week of September) Monitoring/performance studies Have a basic access to equipment counters/monitor tools to react quickly to failures or overhead Setup a channel with IT to study the performance of the network and optimize it for high rates

Trigger processor “Torino” flavor installed in July Based on Altera DE4 evaluation board + custom board for TTC, choke/error, LTU interface First version of the firmware tested successfully With primitives loaded from a file inside 2 TEL62s With primitives generated by the primitive generator of LAV firmware Periodic triggers implemented in August Run control integration completed Switch to/from TALK L0tp is only moving a cable i.e. For LKr calibrations

LKr readout CREAM installation almost completed 28 crates installed, all with VME bridge and TTC module 430 modules out of 432 are installed 27 crates fully cabled Choke/error boards installed, not yet fully tested Currently 22 crates readout, the rest partially used to test the TELDES boards Some problems at the beginning with high humidity in the barrack: water on the heat exchangers Deumidifier installed and running continuously Temperature, humidity and dew point continuously monitored, alarms sent to various people

LKr trigger TELDES tests Continuous tests of 4 TELDES boards connected to CREAMs to validate cables Some problems due to the installation of the test TEL62 in a spare crate with high ripple on 3.3 V (need check) To be validated fully in the final crates Cabling First installation round with 3 racks Problems understood Clean and nice Two and half more weeks needed

Run Control Integration tests done by Nicolas Mainly for the new interface with xml conf files LTU initialization OK LKr Calibration initializer and cycling ok Prototype of CREAM initializer ok This will be cloned by the STRAW L0TP interface OK New version of TDSPY tested Work going on the PC Farm interface To be completed in the next weeks

Infrastructure Crates All crates now at CERN Include a couple of additional spare power supplies TEL62/TDCB 8 TEL62 arrived 14/08, some distribution done 30 in Pisa first week of September Define the policy for distribution 50 TDCB arrived 14/08, more to come Cabling Ethernet cabling for RICH05 (saleve side) done Choke/error All CHEF boards available (LKr ones already installed) Need little mods

Software EOB data Need to add information coming from non-TEL62 based detectors i.e. DCS data for the KTAG, LKr calibration settings, Straw eob data, etc. Basic mechanism discussed, protoype implemented, to be reviewed Based on DIM publishing Add the data to the EOB event of the various detectors Decoding left to detector reconstructions Plan to add derived classes to SpecialTrigger class

Software EOB data Need to define a format My proposal, to be implemented soon (KTAG needs it) Each producer publishes a data block with two words header 1 st word: bit detector ID, bit block ID, bit 15:0 block length 2 nd word: EOB Unix time Detector ID will steer the Pcfarm to put the block in the right detector EOB Unix time will be used as a consistency check In addition, use one of the reserved words in the event header to store the offset of the EOB event

Preparation for the run - 1 Start from now to integrate each detector in the DAQ Check initialization through Run Control Configure properly for multiple destinations Run with a suitable high trigger rate Define the L0TP configuration Inputs Possibility of backup NIM-generated primitives Complete the configuration of the Pcfarm and validate its network configuration

Preparation for the run - 2 Regularly test the acquisition with CDR recording Setup in collaboration with IT tools to monitor the network for our needs Anyway with the output from this meeting, setup a more refined plan for the next weeks Next iteration: TDAQ commissioning meeting on Sep 10 th