WORLD BANK PROCUREMENT POLICIES AND PROCEDURES 1.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Session 8 Implementing PPPs
16-19 May 2011 Walter Poick Principal Procurement Specialist Asian Development Bank Combating Fraud & Corruption in ADB.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
ISO 9001 : 2000.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
MODULE 8 MONITORING INDIANA HPRP Training 1. Role of Independent Financial Monitors 2 IHCDA is retaining an independent accounting firm to monitor its.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Circular A-110 Everything You Didn’t Want to Know.
IS Audit Function Knowledge
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
PROCEDURES FOR SELECTING THE CONTRACTOR
Janaury The “World Bank Group”
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
THE WORLD BANK Procurement Briefing the Netherlands November 3, 2003 Shaun Moss, Lead Procurement Specialist, Europe and Central Asia Region.
PUBLIC PROCUREMENT IN COUNTIES: RESPONSIBILITIES & CONTROLS
ZHRC/HTI Financial Management Training
INTRODUCTION TO PUBLIC PROCUREMENT
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
1 ROLES, RESPONSIBILITIES, AND TIMELINES FOR CONTRACTING ADMINISTRATIVE GUIDELINE NUMBER 3 Harpers Ferry Center Office of Acquisition Management August.
U.S. Small Business Administration
Development Bank African The 1 Presentation By Egal N. Roble (Chief Officer, Procurement Reform) REGIONAL CONFERENCE ON EHNANCING INTEGRITY IN PUBLIC PROCUREMENT.
Overall Considerations
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Overview on Fiduciary Aspects, Procurement and Audit IFAD India Country Office.
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
IFC Participation in IFI Harmonization on Fraud & Corruption Alpita Shah IFC Legal Department October 2009.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
Public Procurement Reforms
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Anti Corruption Policy “Corruption hurts the poor disproportionately – by diverting funds intended for development, undermining a government’s ability.
11 /Module I.3/ Management of public procurement /Module I.3/ а. Procuring entity b. Evaluation committee & Rights and Duties c. Procurement Planning.
BEST PROCUREMENT PRACTICES AND REDRESSING THE MAJOR CONSTRAINT OF PROCUREMENT FOR EFFECTIVE RESEARCH WORK IMRAN CONTEH PROCUREMENT OFFICER, SLARI.
TRAINING PROGRAM PROCUREMENT GUIDELINES IMPORTANT ASPECTS 1.
The World Bank 1 World Bank Reforming to Meet New Challenges: Access to Information Effective July 1, 2010 The World Bank.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
FOURTH AFRICA CENTERS OF EXCELLENCE (ACE) PROJECT WORKSHOP FIDUCIARY COMPLIANCE – PROCUREMENT November 17-19, 2015 Cotonou Presented by : Wole Afuye &
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March.
Inter-American Development Bank Works, Goods and Consulting Services in projects financed by IDB April PROCUREMENT.
Get to know the procurement principles & Ins & Outs of Procurement Policies.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
The Private Sector and the Caribbean: Working Together for Development June 23, 2010 Procurement Policies and Procedures for Goods, Works and Consulting.
Presentation by J. Srinivasan Head, Disbursement, Asian Development Bank – India Resident Mission Procurement in ADB Funded Projects.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Supplying ITS Equipment to World Bank Projects
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Harpers Ferry Center Office of Acquisition Management August 2010
Transparency International Defence and Security Program
PROCUREMENT POLICIES AND GUIDELINES
Africa Centers of Excellence Project Financial Management
Procurement of Works -1 Ghana Shyam Gautam.
Presentation transcript:

WORLD BANK PROCUREMENT POLICIES AND PROCEDURES 1

 To fight poverty with lasting results.  To help people help themselves and their environment by  Providing Resources  Sharing Knowledge  Building Capacity  Forging Partnerships in the Public & Private Sectors 2 WB MISSION

 Loans Credits and Grants are provided to the governments of developing countries to finance investments and promote economic growth through:  Infrastructure projects  Economic reform packages  Technical assistance 3 LOANS, CREDITS AND GRANTS

The Bank also provides technical assistance: expert advice to help governments make specific sectors of their economies more efficient and relevant to national development goals 4 Technical Assistance

 IDENTIFICATION  PREPARATION  APPRAISAL  NEGOTIATIONS  IMPLEMENTATION  EVALUATION 5 THE PROJECT CYCLE

JOINT BORROWER/BANK INVOLVEMENT  SOURCES  Bank Country/Sector Work  Country Offices  Prior Projects  Multilateral/Bilateral Agencies 6 IDENTIFICATION

 PROVIDES OUTLINE OF PROJECT  Beneficiaries  Alternatives  Issues  Processing Requirements 7 IDENTIFICATION (Contd.)

 Responsibility Of Borrower  Available Assistance  Borrower  Bank  Project Preparation Facility  Technical Assistance Loans 8 PREPARATION

 Engineering Loans  Previous Loans  Retroactive Financing  Multilateral/Bilateral Agencies 9 PREPARATION (Contd.)

 Studies (Technical, Environmental, Financial)  Tasks [Surveys, Mapping]  Final Designs, Bid Documents  Staffing And Training  Office Equipment, Vehicles 10 PREPARATION (Contd.)

 RESPONSIBILITY OF BANK  Multi-disciplinary Team [Field]  Project Appraisal Document [PAD]  ECONOMIC ANALYSIS  Benefit To Country  Poverty Reduction  TECHNICAL  Review Of Design, Cost Estimates  Implementation Schedule 11 APPRAISAL

 INSTITUTIONAL  Capability To Implement Project  Training, Staff Needs  FINANCIAL  Project Financial Viability  SOCIOLOGICAL  Beneficiaries 12 APPRAISAL (CONTD.)

 Preparation Of Legal Agreement  Covenants  Conditionalities  Progress Report  Presentation To Executive Directors  Signing  Effectiveness  Advance Contracting/Retroactive Financing 13 NEGOTIATIONS/BOARD PRESENTATION

 IMPLEMENTATION IS RESPONSIBILITY OF BORROWER  BANK RESPONSIBILITY  Monitor Progress  Advise  Ensure Loan Proceeds Used For Purposes Intended  Ensure Procurement Is Economic And Provides Fair Opportunities 14 IMPLEMENTATION/SUPERVISION

 SUPERVISION METHODOLOGY  Field Visits  Review And Approve  Consultant Selection  Bid Documents  Contract Awards  Changes In Scope/Costs 15 IMPLEMENTATION/SUPERVISION (Contd.)

 PROJECT COMPLETION REPORT PREPARED BY  Separately by Bank Operations Staff and Borrower Staff  Desk And Field Reviews  Re-estimates Cost/Benefits  Includes Borrower’s Comments  Analysis Of Success And Failures  Audit Report By Independent Department Of Bank  Special Reviews By The Bank  Analysis Used For Future Project Design 16 EVALUATION

 BANK ARTICLES  Lend For Specific Projects  Use Funds For Purposes Intended  Economy And Efficiency  COMPETITIVE INTERNATIONAL TRADE  IMPORTANCE OF PROCUREMENT  Critical To Project Implementation  Member Countries Expectation By Way Of Exports  Perception Of Fairness And Transparency 17 WORLD BANK PROCUREMENT POLICY

 Need For Economy And Efficiency  Give All Eligible Bidders Opportunity To Compete  Encourage Development Of Local Industries In Borrowing Country 18 CONSIDERATIONS THAT GUIDE PROCUREMENT POLICIES

 Encouraging the development of domestic contracting and manufacturing industries in the borrowing country  The importance of transparency in the procurement process 19 CONSIDERATIONS THAT GUIDE PROCUREMENT POLICIES (Contd.)

 Describe All Procurement Methods And Their Procedures For All Types Of Projects  For A Specific Project, The Methods And Procedures Of The Guidelines Which Apply Are Those Considered Appropriate For The Project And Were Agreed Upon By Borrower And Bank And Specified In The Financing Agreement 20 GUIDELINES

 Need For Quality Of Required Item  Need For Economy And Efficiency  Need To Give All Eligible Bidders Opportunity To Compete  Encourage Development Of Local Industries In Borrowing Country  Importance Of Transparency 21 GOODS AND WORKS

 Need For High Quality Service  Need For Economy And Efficiency  Need To Give Qualified Consultants From All Eligible Countries Opportunity To Compete  Encourage Development Of National Consultants In Developing Member Countries  Importance Of Transparency 22 CONSULTANCY

Applies To All Contracts Financed Wholly Or In Part By IDA Through Grants/Credits 23 APPLICABILITY

 Definitions  “ corrupt practice ” is the offering, giving, receiving or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party; 24 FRAUD AND CORRUPTION

 Definitions  “Fraudulent practice” is any act or omission, including a misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an obligation 25 FRAUD AND CORRUPTION (Contd.)

 Definitions  “Collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party 26 FRAUD AND CORRUPTION (CONTD.)

 Definitions  “Coercive practice" is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party 27 FRAUD AND CORRUPTION (Contd.)

 Definitions (Contd.)  “Obstructive practice” is  (a) deliberately destroying, falsifying, altering or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, 28 FRAUD AND CORRUPTION (Contd.)

 Definitions (Contd.) coercive or collusive practice; and/or threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation, or 29 FRAUD AND CORRUPTION (Contd.)

 Definitions (Contd.)  “Obstructive practice” is:  (b) acts intended to materially impede the exercise of the Bank’s inspection and audit rights 30 FRAUD AND CORRUPTION (Contd.)

CORRUPT AND FRAUDULENT PRACTICES ARE UNACCEPTABLE  SANCTIONS BY BANK: 1. Will Reject Proposal For Award 2Cancel The Portion Of The Loan 31 FRAUD AND CORRUPTION (Contd.)

3 Declare Firm Ineligible For A Limited Period Or Indefinitely 4Bank Reserves The Right To Audit Firm’s Accounts And Records Of The Contract  Special Clause Requiring Bidders To Observe National Laws (Including No- bribery) May Be Permitted With Approval Of The Bank 32 FRAUD AND CORRUPTION (Contd.)

 Sanctions (Contd.) Legal proceedings (ACC Act, Amended 2008) Disciplinary measures against staff 33 FRAUD AND CORRUPTION (Contd.)

The World Bank Guidelines for Procurement defines Misprocurement as: “…goods and works which have not been procured in accordance with the agreed procedures in the Loan Agreement …” 34 MISPROCUREMENT

WHEN  Any Step/Procedure Followed Is Inconsistent With Agreed Procedures Under The Loan/Credit And Guidelines  Bank’s No-objection Was Obtained Before Award But On Basis Of Incomplete, Inaccurate, Or Misleading Information 35 MISPROCUREMENT (Contd.)

RESULT:  Contract Not Financed  Amount Cancelled From Grant/Credit  For Repeated Offences Even Suspension Of Grant/Credit  Legal proceedings  Disciplinary action against staff 36 MISPROCUREMENT (Contd.)

 SUPERVISES THE PROCESS  ASSISTS BORROWER IN PREPARATION OF PROJECTS  REVIEWS:  Procurement Plan  Advertisement Notice  Bidding Documents [Goods/Works] And Rfp [Consultants]  Bid And Proposal Evaluation Reports – Proposed Contract Awards 37 THE BANK’S ROLE

 Draft Contracts  Contract Amendments  Performance On Contracts  Other Procurement Matters To Ensure Compliance With Credit Agreement -Contracts After Award In Post Reviews 38 THE BANK’S ROLE (Contd.)

 Verifies Withdrawal Applications Prior To Disbursements  Monitors Procurement Through Forms 384  Addresses Complaints From Firms On Procurement Matters 39 THE BANK’S ROLE (Contd.)

 Contracting Parties Are - Borrower/Implementing Agency - Contractors/Suppliers/Consultants and Implementing Agency  Bank Is Not A Party To The Contract  Declares Misprocurement 40 THE BANK’S ROLE (Contd.)

 Two Types  Open  The preferred method  Done by public advertising  Gives equal opportunity to all eligible and qualified bidders 41 METHODS OF PROCUREMENT

 Restricted  Direct invitation to a selected shortlist (Individuals or firms )  Must be approved in order to be used  Should be discouraged as much as possible 42 METHODS OF PROCUREMENT (Contd.)

 Goods, Works and Non- consultancies International Competitive Bidding (ICB) National Competitive Bidding (NCB)  Various methods (See Below) Default is QCBS 43 NAMES OF ‘OPEN’ METHODS

 Restricted Bidding (National and International)  Requests for Quotations  Request for Proposals (for consultancy services)  Sole Source Selection  Direct Contracting 44 NAMES OF ‘RESTRICTED’ METHODS

 D etermined by:  Financial thresholds, or  Circumstances  Are defined in the Guidelines  Emergency requirements  Limitations on supply sources  Genuine contract intentions  Failure of a previous procurement method  Complexity and nature of assignment 45 CHOICE OF PROCUREMENT METHOD

 NCB  ICB;  For Consultancy services: QCBS, LCS, FBS, CQS, and QBS, IC would be used 46 PROCUREMENT METHODS

The principle of value for money engulfs every good procurement practice in today’s world. It deals with:  Quality & Reliability  Lifetime value  Efficiency (Time Management)  Transparency  Price 47 VALUE FOR MONEY

The financial value of any procurement actions determines the method to be used. There are different thresholds in various countries. Prior Review: This procurement control is established for high value procurement actions. A clearance (No Objection) is required at each major step. Post Review: Control for middle and low-value procurement where the review takes place after the procurement action 48 THRESHOLDS

 Purpose of a Procurement Plan  To fulfil the need for goods, works and services in a timely manner.  Statutory  Used as a monitoring tool  To procure at a reasonable cost 49 THE PROCUREMENT PLAN

 Content of a Procurement Plan  Contract description (contract package)  Estimated cost (unit and total)  Procurement method for the contract  Activities and dates (Lead Times)  The plan should have planned and actual columns to facilitate monitoring and must be revised periodically 50 THE PROCUREMENT PLAN (Contd.)

 Steps to Follow:  Needs assessment to determine the goods, works and services required for the period of time under consideration;  Determination of Lead Time  Key Tasks and Activities 1.Development of Specifications and Preparation of Drawings 2.Preparation of the Bidding Documents 51 THE PROCUREMENT PLAN (Contd.)

 Steps to Follow: 3. Advertisement/Receipt of bids 4. Bid Opening/Evaluation 5. Preparation and Signing of Contract 6. Mobilisation/Advance Payment/Notification Period 7. Reviews within the process 8. Time supplier/contractor requires to supply/construct 52 THE PROCUREMENT PLAN (Contd.)

 Specification communicate to prospective bidders the exact scope and technical requirements for products to be supplied or materials to de used for civil works. They should include details of all the required attributes, variables and parameters of a product or materials and appropriate information on the intended use and performance required, The ultimate objective is to ensure that end – user needs are fully met and that value for money is achieved. 53 TECHNICAL SPECIFICATIONS

 Generally specifications may define:  The function or duty to be performed by the product;  The performance required of an item  The technical and physical characteristics of a piece of equipment in terms of physical dimensions, power input and output, capacity, materials to be used in manufacture etc. 54 TECHNICAL SPECIFICATIONS (Contd.)

55  Sufficiently generic enough to elicit responsive bids  Enable participation by any qualified bidder, without technical prejudice  Display technical criteria for evaluation of bids  must be drafted to permit the widest possible competition  provide a clear statement of the required standards of workmanship, materials, and performance of the goods and services to be procured

TECHNICAL SPECIFICATIONS (Contd.) 56  For GOODS, it includes:  Physical/chemical properties  Performance requirements  Reference to design drawings  Locally applicable standards and regulations

TECHNICAL SPECIFICATIONS (Contd.) 57  For Works, it make reference to:  Working Drawings  Bill of quantities  Industry standards  Locally applicable codes

 It is the submission of the required information, documentation and commitment as prescribed in the solicitation document (Bidding Document, RFQ, RFP, etc.)  It would involve compliance with national, international and partner guidelines, regulations and laws. 58 RESPONSIVENESS

THANK YOU 59 COURTESY