Project & Subcontract Management Issues By: Jean Marie Thiel, President /CEO Belonger Corporation Inc.

Slides:



Advertisements
Similar presentations
Training: A Common Sense Strategy December 2002 Patti Hanson Vice President and Director of Purchasing Operations Management JCPenney Company, Inc. Plano,
Advertisements

Pat Marmo & John Robinson. In 2004, Hanford saw a great deal of budget apprehension and uncertainty Increase use of staff augmentation contracting Need.
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Buying Better Outcomes Workshop 4 Equalities and Contract Management If you do not take it seriously, why should the supplier?
The Lifecycle of Grants: Labor Standards November 9, 2012.
Accounting System Requirements The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Further.
1 CDBG Labor Standards Requirements For Local Officials.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
Today’s Topics: Overview 1.What is an NTC 2.Why do we use them 3.What type of information is required 4.What type of information should be included 5.Labor.
Insert software product logo (or name) on slide master 2005 Trnsport User Group Meeting November 6, 2005 Roger Bierbaum CRLMS Civil Rights and Labor Management.
Performing a Fiduciary Review of Trust Administration FIRMA April 2009 Independent Fiduciary Services ® Independent Fiduciary Services, Inc.  th.
Time System What is this all about? The purpose of this project is to automate how Evergreen collects, records and manages employees’ dates and times worked.
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
Washington University Medical Center Campus Renewal Project MANDATORY BILLING MEETING JUNE 12, 2015 Presented by:
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
U.S. Department of Labor Employment Standards Administration (Non)Compliance Monitoring What to look for and how to find it … (Davis-Bacon payrolls)
Project Management Lecture 5+6 MS Saba Sahar.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Certification of Market Values STEB PROGRAM Briefing Points 2011 Pennsylvania Department of the Auditor General Thomas E. Marks, CPA Deputy Auditor General.
U.S. Department of Labor Wage and Hour Division Health Resources and Services Administration (HRSA) DAVIS-BACON WEBINAR TRAINING Covering Wage Determinations,
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Former Fort Ord Prevailing Wage Application and Enforcement Michael Houlemard Fort Ord Reuse Authority.
Passion and performance on every page. Sustained Solutions from Webcrafters, Inc., an Original MPower ChaMpion October, 2012 Jac Garner, CEO, Webcrafters.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Presented by Joan Kossow Data Compliance Manager The Changing Face of Claims Processing &
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 RMS Training Sponsored by the RMS Center July 2006.
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
Compliance and Ethics Training Overview
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
Section Five: Security Inspections and Reviews Note: All classified markings contained within this presentation are for training purposes only.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
WAP Quality Management Plan NASCSP 2013 Annual Training Conference Phoenix, Arizona September 11, 2013 Barb Klug-Sieja – Bureau Director Hoyt O’Brien –
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Presented By: Puyallup Tribe’s TERO. Indian Preference The determination that preference will be granted to someone for being registered in a Federally.
IT Requirements Management Balancing Needs and Expectations.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Representations & Certifications What did I sign?.
Agency Construction Management :CM NOT AT-RISK
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Lisa Fresquez Civil Rights Program Manager WYDOT.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
126 ENFORCEMENT Employee Interviews Payroll & Document Review.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Subcontractors and Suppliers Procedures for Receipt of Payment.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Management of Operational Risk. Regulatory Capital Perspective Credit Risk – Basel I (1987) Market Risk – (Amendment 1998) Credit Risk – Basel II (2005)
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
ENJOY Good Day! Compliance Benefits This is your 30-Second
Davis-Bacon Investigation Procedures
ILLINOIS PREVAILING WAGE ACT: WHAT EVERY CONTRACTOR SHOULD KNOW
Sponsored by the RMS Center
State Aid Construction
Housing Rehab Contracting
ENJOY Good Day! Compliance Benefits This is your 30-Second
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
State Aid Construction
Presentation transcript:

Project & Subcontract Management Issues By: Jean Marie Thiel, President /CEO Belonger Corporation Inc

Good Document & Communication Having a software system or process able to manage the documents and various controls Having a working knowledge of the types of documents most often used RFI, Change order, submittal registers, CBs, schedules, rework logs, test reports, qc reports, daily logs, SOV, certified payrolls, utility interruptions, base security requests, releases, waste manifests to name a few Cross Train support staff

Labor Considerations Understanding certified payroll reporting – Compliance matters, use of apprentices, proper trade classification, method of reporting, cash in lieu of benefits, correcting errors Understanding compliance and differences of Federal Wage Rate Determination and Service Act Wages Debarred Contractors

Schedule Concerns Adequate durations for performance considerations sequence of work required, client constraints, incorporating required QC inspections, tests, curing durations, equipment lead times, and phasing impacts. Incorporating client required reviews and durations. Recognizing project close out documentation is considered part of the required performance time.

Product/Equipment Selection Verifying ahead of time Buy American Act - ensuring compliance % of costs and assembly in determining if product qualifies Verifying if a material or product is a not commercially available product Recycled materials requirement Substitutions “like or equal” pre-approval Lead time availability impact on schedule

Subcontractor Perspective Project documents incorporated by reference Flow down clauses Safety training standards pertain to subcontractors. Waivers, retention, payment considerations Change order requirements & limitations Actions of another ~ 2 way street

Reflections Don’t fall victim to assumptions Clauses by reference do not indicate level of importance or impact Incorrect information or direction doesn’t alleviate legal responsibility Standardization & Consistency aids in client satisfaction Agency & Contract specific differences Problem Resolution Orientated