1 By, Er. Lalrinawma Executive Engineer, W-II, ENC Office, PWD, Mizoram.

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
Calibration and Application of HDM-4 for the WSDOT Highway System Jianhua Li Steve Muench Joe Mahoney Department of Civil and Environmental Engineering.
PAVEMENT DESIGN. Introduction Pavement design is the major component in the road construction. Nearly one-third or one-half of the total cost of construction,
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Lec 28, Ch.20, pp : Flexible pavement design, ESAL (Objectives)
Highway Maintenance & Rehabilitation
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Chapter 9. Highway Design for Rideability
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
Nondestructive Testing and Data Analysis Module 2-3.
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
LTPP Program Presented to the ACPA Professors Workshop Skokie, IL June 19, 2008 Long-Term Pavement Performance Program.
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
MTO OVERLAY DESIGN The following presentation contains references to Figures 6.02 and 6.03, Tables 6.01 and 6.05, “Overlay Design Model” and “Overlay Example.
THE WAY FORWARD or WHO SAID RESEARCH WAS EASY ?. Relationship between variables  x Y = (say) roughness after 5 years Poor Good Expectation for acceptable.
Maintenance & Rehabilitation Strategies Lecture 5.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
JC VAN DER WALT.  Who is SANRAL?  Functions  Network  Budget Allocation  Western Region Projects for 2011/12.
User perceptions of highway roughness Kevan Shafizadeh and Fred Mannering.
INFORMATION SYSTEM FOR RURAL ROAD NETWORK PLANNING – A CASE STUDY
بسم الله الرحمن الرحيم AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Evaluation, Design and Redesign Beit Wazan and.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
User perceptions of highway roughness
UPGRADATION PLANNING OF RURAL ROADS IN G.I.S. ENVIRONMENT UNDER PMGSY.
ROAD PROFILING-ROUGHNESS Presentation by Niranjan Santhirasegaram
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
HDM-4: Pavement Deterioration Modeling and Road User Effects
Road Management System and Data Collection in Karnataka PWD Public Works Department Government of Karnataka By Dr. H.R.Shantharajanna Chief Information.
Road Investment Decision Framework
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Road Information System IT & Planning Division, NHAI Presentation on National Highways Authority of India byby + +
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
Prepared by: 1.Jihad Ghanem 2.Fares Al kherashi 3.Hadeel Sadaqa Supervised by: Eng. Hussein Abu- Zant Dec 2015 Evaluation and Redesign of Haifa Street.
The University of Birmingham Role of HDM-4 in Road Management Professor Henry Kerali The University of Birmingham England, UK.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Data Interfacing HTC INFRASTRUCTURE MANAGEMENT LTD.
AN-Najah National University AN-Najah National University
Investigation of Road Project By S.N. Nanaware
Multi-Year Programming and Predictive Modelling
Road Maintenance & Management System (RMMS)
CE 3500 Transportation Engineering Introduction to Pavement Materials
Investigation of Road Project
HIGHWAY MAINTENANCE Failures in flexible pavement.
Pavement condition index calculation
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
Introduction and Applications
Flexible Pavement Design (JKR Method)
Flexible pavement design
PASER Ratings for TwinCATS Planning Area
Factors Affecting Pavement Design
Pavement Overlay Design
Road Design Standards for LGED
About us… Click.
Presentation transcript:

1 By, Er. Lalrinawma Executive Engineer, W-II, ENC Office, PWD, Mizoram

NERAMS Road Assets 2

To strengthen the state PWDs' road management capability through the introduction of modern road management practices To transform the state PWDs into road managers by the introduction of more effective and efficient road management processes and systems Assist the PWDs in implementing road asset management systems (RAMS) 3 Objectives of the Project

Overview of the Project Provide Concepts on RAMS (Review) Discuss Data Collection Methodology (Review) Discuss Data Collection Formats (Review) Use NERAMS to fill and input data To evaluate the maintenance requirements View and Report data using NERAMS Objectives 4

Efforts to Implement NERAMS Original software developed and implemented in pilot division during Upgradation, and improvement were undertaken during NERAMS software Version 1 was released in June 2014 Decision to implement NERAMS in few sub-divisions in Sikkim NERAMS Version 2 released in Sep

Key System Components Tools for the data input, validation, editing, view and report Road Network Asset Inventory Data & Pavement Composition Inspection Data (Pavement/Culvert/Bridge Condition, Structural Strength) Traffic Data a database to store data An Analytical tool Process Raw data (Traffic, Deflection, Condition etc.) Parameters of Pavement Maintenance Strategies Define Treatments, Costs of Maintenance Treatments Maintenance Estimation, Costing, Budgeting Finalise Maintenance Treatments 6

Poor maintenance: insufficient allocation of resources Low priority for maintenance Inadequate and delayed maintenance: leading to faster deterioration of road assets Inadequate and delayed adoption of modern technologies Need to put in place a Asset Management Approach Challenges 7

Process Flow - RAMS 8

NERAMS Ver 2.0 – Modules Administration Modules User Administration Data Aggregation Module Technical Modules Asset Management System Pavement Management System Routine Maintenance Management System 9

NERAMS – Administration Modules User Administration Define Users (New User / Details / Password change) Define Roles (HQ / Divisional Administrator, Data Entry, Users) Define Jurisdictions & Access Control (Divisions) Generate Access Codes (for Divisions) Data Aggregation Assimilating data from Division offices Disseminating data model / rules to Division offices Database backup & Restore 10

NERAMS – Technical Modules Asset Management System Define Data Model (Pavement Type, Width, Materials etc.) Define Road Network (Roads & Sections) Add Assets (Pavement Inventory, Composition, Culverts, Bridges) Add Survey Data (Pavement Condition, Pavement Structural Strength, Traffic Volume, Social Data) Features Data Input and Export in Excel Reporting in pdf format Historical Data Storage and Retrival 11

NERAMS – Technical Modules Pavement Management System Define Maintenance Strategy (Engineering Standards) Define Treatments & Costs (Periodic Renewal, Overlay, Strengthening, Widening) Decide Homogeneous Section (Grouping of adjacent sections) Data Transformation (Convert 0.5 km ratings to quantities) Analysis of Survey data and Assign Treatments Estimate costs Adjusting Treatment and Costs Prepare Maintenance Plan Data Export to Excel & Reporting in pdf (Works, Costs by Section / Division) 12

NERAMS – Technical Modules Routine Maintenance Management System Define Maintenance Strategy (Engineering Standards) Define Treatments & Costs (Patching, Crack Sealing, Pothole filling etc.) Data Transformation (Covert 0.5 km ratings to quantities) Assign Treatments Estimate costs Adjusting Treatment and Costs Prepare Routine Maintenance Plan Data Export to Excel & Reporting in pdf (Works, Costs by Section / Division) 13

Data Collection Network Referencing Location & Extent of Asset (Road List & Segments) Road Inventory and Pavement Composition At each 0.5 km interval Road Inventory (pavement type, width, shoulder type / width, Terrain, Submergence, Landslide Protection Wall, Drain, Right of Way) Pavement Composition (wearing course, base, sub-base, subgrade, age) Road Condition & Structural Strength At each 0.5 km interval Visual Assessment (Severity & Extent Ratings) Pavement Distress (Cracking, Pothole, Ravelling, Rutting, Failed Section) Roughness Deflection Data (Using BBD Instrument) Traffic Volume count data Daily Traffic in 16 vehicle categories in each section Culvert and Bridge Inventory and Overall Condition Habitation Data (Social Infrastructure along roads) 14

Network Referencing – Road Data 15

Network Referencing – Section Data 16

Road Inventory 17

Pavement Composition 18

Pavement Condition 19

0 #none: 2 Mod: 1 Minor: 3 Extensive: Cracking Ratings: Distress > 5 m 2 and <10% of segment length Distress < 5 m 2 Distress > 10% and <50% of segment length Distress > 50% of segment length

0 # none : 2 Mod: 1 Minor: 3 Extensive: Failed Section Ratings: Distress < 5 m 2 Distress > 5 m 2 and <10% of segment length Distress > 10% and <50% of segment length Distress > 50% of segment length

0 #none: 2 Mod: 1 Minor: 3 Extensive: Potholes Ratings: Occasional deep potholes and/or frequent shallow potholes Distress < 5 m 2 Frequent deep potholes affecting vehicle speed Potholes spread across carriageway (comfortable speed: <30 km/h)

0 #none: 2 Mod: 1 Minor: 3 Extensive: Ravelling Ratings: Distress >50% of segment length Distress > 5 m 2 and <10% of segment length Distress < 5 m 2 Distress >10% and <50% of segment length

Rutting 24 1 Minor Rut less than 15 mm in depth with or without longitudinal crack 2 Moderate Rut between 15 mm and 30 mm in depth with or without longitudinal crack 3 Extensive Rut of more than 30 mm in depth with or without single or multiple longitudinal cracks

General Condition of Drainage 25 The main cases of deficient drainage are listed below: 1. Low embankment in flat area 2. Drainage system blocked resulting in flooded sections 3. Cross drainage under designed resulting in flooded sections

Roughness (1) along straight alignments excluding interferences with other users (2) as defined in Table 4.1 (3) The PMS module considers this roughness class (5) as criteria for selecting the corresponding sections for the reconstruction programme

Pavement Deflection Measures rebound deflection under a standard wheel load. Guidelines followed in India - Guidelines for Strengthening of Flexible Road Pavements Using Benkelman Beam Deflection Technique IRC : Used for overlay thickness design. Benkelman beam equipment is used for deflection measurement. 27

Benkelman Beam Slender beam 366cm long pivoted at a distance of 244cm from the tip Measurement is taken by suitably placing the probe between the rear dual wheels of a loaded truck. Deflection readings taken every 500m on SHs and MDRs. 28

29

Deflection Measurement Take measurement at 0.6m from the edge of the pavement for single lane and 0.9m for intermediate and double lane Three readings needed: a. under the wheel (d 0 ) - Initial b. when truck moves 2.7m(d 2.7 ) - Intermediate c. when truck moves 9.0m(d 9.0 ) – Final Take pavement and ambient temperature every hour. Lever ratio in measurement is 2, Therefore, multiply the read deflection by 2 to get the real value. If (d 2.7 – d 9.0 ) < mm, Deflection D = 2 x (d 0 - d 9.0 ) If (d 2.7 – d 9.0 ) > 0.025mm, Deflection D = 2 [(d 0 – d 9.0 ) (d 2.7 – d 9.0 ) ] 30

Deflection Measurement Apply temperature correction to normalise readings for standard pavement of 35 o C. No correction required if the total thickness of asphalt layer(s) is less than 50 mm. Apply moisture correction based on subgrade soil when test done in dry weather. Characteristic deflection of a section: = average + 2 x std. deviation CHECK LIST Rear axle-load – 8170 kg + 1% (8088 – 8252 kg) Tyre pressure – 5.6 kg / cm 2 + 5% (5.4 – 5.8 kg / cm 2 ) Dial gauge moving freely 31

Pavement Structural Strength 32

Moisture correction factor charts

Deflection Data Processing 34 Test Location Chainage (Km) + (m) D(2700)- D(9000) D(0)- D(9000) Reb. Def. (mm) Pavt. Temp. (degree Celcius) Temp. Corr. Def. Subgrade Moisture Corr. Factor Moisture+ Temp. Corrected Deflection (mm) Avg. (mm) Char. Def. Soil Type PI (%)MC (%) SM-SC SM-SC SM-SC SM-SC SM-SC SM-SC SM-SC SM-SC

Overlay Thickness Design Characteristic deflection (mm) – from BBD survey Million standard axles – from axle-load survey

Traffic Volume Count Survey Counting of Vehicles Vehicle types Direction 15 min. intervals Estimate the road utilization in terms of volume capacity ratio (VCR) IRC:64–1990 – Guidelines for Capacity of Roads in Rural Areas Over-capacity roads suffer from congestion, low speed, delays, traffic hazards Loss of time, high operational cost of vehicles Volume count helps to determine the capacity utilization and forecast 36

Procedure Each direction separately Counted separately for each vehicle category (16) For 15 minutes interval 37

Identifying Locations 38  Step 1: Indentify the end points along the section of any such developed areas, which could include local traffic. Also identify junctions and intersections that could have high volumes of local traffic.  Step 2: Identify tentative locations for survey count post/census stations which can avoid such local traffic. The location shall be well away from all urbanized development, major villages, and major junctions/intersection on the road section.  Step 3: Check that the necessary logistics for conducting traffic volume survey such as permanent shelter for 3 days, light, table/chairs etc., can be provided at the identified location.  Step 4: Finalize the location and name the traffic survey count post/census station.  Step 5: Locate and mark all the traffic survey stations on an index at district level.

Vehicle Types 39

Vehicle Types 40

Traffic Volume Data Collection 41

Traffic Volume Data Entry Format 42

Traffic Volume Analysis Vehicles converted to Equivalent Passenger Car Unit (PCU) 43 Motor Cycle / Scooter0.5 Auto Rickshaw1 Passenger Car / Jeep / Pickup Van1 Mini Bus2 Standard Bus3 Tempo / Light Commercial Vehicle (LCV)1.5 2-Axle Truck3 3-Axle Truck3 Multi-Axle Truck4.5 Tractor with Trailer4.5 Tractor without Trailer1.5 Cycle0.5 Cycle Rickshaw2 Animal Drawn8 Other6

Traffic Volume Analysis..Contd Level of Service (Categorised in to six : A-F) – Operating conditions of road IRC 64 – 1990 recommends LOS – B for rural highways 44 Level of Service B Stable Flow Drivers still have freedom of maneuver and choose their desired speed

Traffic Volume Analysis…Contd At LOS – B the volume is around half of the max. capacity or design service volume (DSV) The DSV to be considered at the end of design life Traffic are projected to the end of design life (trend line / growth rate / econometric method) – IRC 108 : 1996 Daily traffic volume is considered for design Lane Configuration Terrain Surface Type Presence of shoulders Mix of Traffic 45

Bridge Inventory 46

Culvert Inventory 47

Habitation Details 48

Thank You