National Hydrology Project Framework for Monitoring and Evaluation (M&E)

Slides:



Advertisements
Similar presentations
Strengthening statistical capacity in support of progress towards the Internationally Agreed Development Goals in countries of South Asia United Nations.
Advertisements

1 Strengthening statistical capacity-building in support of progress towards the Internationally Agreed Development Goals in the SADC region Fabia Yazaki.
Introduction to Monitoring and Evaluation
Towards a model M&E system for AIDS programs Kampala April
Global Congress Global Leadership Vision for Project Management.
Overview of Mission Statement & Organization. Development Communication Division External Affairs Vice Presidency DevComm Vision To put communication.
M&E Issues: RAFIP and REP Kaushik Barua Accra, 12 Dec
INDUSTRIAL & SYSTEMS ENGINEERING
Comprehensive M&E Systems
An Introduction to Marketing Research
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Monitoring & Evaluation in World Bank Agriculture and Rural Development Operations SASAR Monitoring & Evaluation Workshop New Delhi; June 20, 2006.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
Emergency Management Information System - EMIS
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Annual Work Plan 2014 Tapio Leppänen Chief Technical Adviser.
Evaluation Assists with allocating resources what is working how things can work better.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Developing Indicators
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
World Bank and Statistical Capacity Building PARIS21 Task Team Meeting Washington, DC September 10, 2001.
Assessing the Capacity of Statistical Systems Development Data Group.
UNDAF M&E Systems Purpose Can explain the importance of functioning M&E system for the UNDAF Can support formulation and implementation of UNDAF M&E plans.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Framework and Toolkit for UN Coherence, Effectiveness and Relevance at Country Level: Step 7 – Monitor & Evaluate.
Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Managing for Development Results Results-Oriented Monitoring.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Central Water and Power Research Station Pune
Monitoring & Evaluation
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
A short introduction to the Strengthened Approach to supporting PFM reforms.
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
Kathy Corbiere Service Delivery and Performance Commission
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Session 2: Developing a Comprehensive M&E Work Plan.
Data, Surveys and Performance Monitoring by Mr Ben Freyer Deputy Director, Regional Support Services, DWSSC 22 November 2012 Ministry of Agriculture, Water.
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Evaluation What is evaluation?
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Country Report for Malawi to the UNDP CIRDA Country Program Managers Workshop 15 th to 17 th March, 2015 Livingstone, Zambia Strengthening National Climate.
WATER RESOURCES DEPARTMENT
National Hydrology Project Dr
Logic Models How to Integrate Data Collection into your Everyday Work.
National Hydrology Project
Project monitoring and evaluation
Ministry of Water Resources, River Development and Ganga Rejuvenation
National Hydrology Project
National Hydrology Project
TechStambha PMP Certification Training
13th Governing Council of SIAP 4-5th December,2017 Chiba, Japan
Regional Stream flow monitoring and forecasting
Multi-Sectoral Nutrition Action Planning Training Module
West Africa Regional Work Plan Example
CREWS West Africa Regional Work Plan
Civil Protection Financial Instrument – Prevention Projects
Helene Skikos DG Education and Culture
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Technical and Advisory Meeting
Presentation transcript:

National Hydrology Project Framework for Monitoring and Evaluation (M&E)

Why M&E?  Help managers at all levels track results, implementation progress and agency performance and so make improvements and corrections  Show achievements and emerging issues to managers, decision makers and supervisors  Demonstrate the value of the project to politicians and the general public

A four track results-based M&E system for NHP A results-based monitoring and evaluation system to:  Track implementation progress against the PIP and the agreed annual work programmes and budgets  Track results against the agreed project results framework  Track the performance of each IA and each state, based on progress towards the agreed results and on implementation progress  Carry out three major assessments of project performance, results and emerging impacts

Implementing M&E M&E staffing  An M&E Cell in the National PMU  M&E Focal Points in each central and state PMU  Support will be provided by the TMC team Preparing the M&E set-up  An M&E strategy and plan  An M&E work plan for the first three years of implementation.  Based on available data direct from MIS wherever possible  Web-based and available via mobile devices  Regular summaries each six months, annual M&E reports  Used by IAs, decision makers, supervisors, other stakeholders  M&E will also be a basis for learning Operating and using the M&E system

NHP A.Water Resources Data Systems B. Water Resources Information Systems C. Water Resources Operation and Planning Systems D. Institutional Capacity Enhancement A1. Water Resources Data Acquisition Network A2. State and National Water Data Centers B1. Web-based Water Resources Information Systems B2. Water Resources Information Products C1. River Basin Modeling C2. Streamflow Forecasting and Reservoir Operation Systems. C3. Irrigation Design and Operation C4. Purpose- Driven Studies D1. Water Resources Knowledge Centers D3. Project Management D2. Professional Development

M&E at three levels At the level of the project as a whole, we measure how far we have achieved the overall PROJECT DEVELOPMENT OBJECTIVE At the level of each of the four components, we measure the OUTCOMES (the change or benefit as a result of the project) At the level of each of the eleven sub-components, we measure the OUTPUTS (the products, services or facilities produced by the project) All indicators should be SMART = Specific, measurable, attributable, relevant, time-bound For each outcome and each output, we may monitor several parameters but choose just one Lead Indicator For each indicator, we need to set a baseline and a target

Project Development Objective Objective: Improve the extent, reliability and accessibility of water resources information and strengthen the capacity of water resources management institutions in India. Element of the PDOSMART Indicator  Improve the extent of water resources information Number of operational Hydromet stations  Improve the reliability of water resources information % of data that are digitized  Improve the accessibility of water resources information % of Hydromet stations integrated with on-line state and central databases  Strengthen the capacity of water resources management institutions in India Number of water resource management institutions conducting water resource assessments as standard practice SMART = Specific, measurable, attributable, relevant, time-bound

COMPONENT A. Water Resources Data Systems Outcome: Extent and reliability of water resources data improved Outcome indicator: Percentage of data that are digitized

Output: Hydromet data acquisition networks established or upgraded Lead output indicator: Number of Hydromet data acquisition systems operating as designed Other output indicators [broken down into: (a) real time (b) other automated; (c) mobile; and (d) other manual]:  Number of weather recording stations [broken down between: (i) rain gauges; (ii) automatic weather stations]  Number of water level monitoring facilities (rivers, dams/barrages, canals)  Number of groundwater level monitoring facilities operating  Number of barrages equipped with SCADA  Number of water quality monitoring facilities operating A1. Water Resources Data Acquisition Network

Output: Facilities established or upgraded for automated data collection, collation and processing at state and national levels Lead output indicator: Number of water data centres established and operating as designed Other output indicators:  Number of state or national data centres constructed or upgraded  Number of items of information technology equipment installed and operational [broken down between: computers; servers; and VC facilities]  Number of years of historical data per station digitized (measured in ‘station years’ and in gigabytes)  Central hydrologic instrumentation facility operational  Number of water quality laboratories operational [broken down between: (a) Level 1; (b) Level 2; and (c) Level 2+ AND between ‘upgraded’ and ‘new’. A2. Establishment of State and National Water Data Centres

COMPONENT B. Water Resources Information Systems Outcome: Strengthened communication and exchange of information amongst states, central government and other stakeholders Outcome indicator: Number of states with water resources information systems (WRIS) integrated with India-WRIS

Output: Web-based information systems developed or strengthened at central, regional, river basin and state levels Lead output indicator: India-WRIS and regional, river basin and state level WRIS operating as designed Other output indicators:  Number of centres using standardized hydrological data acquisition and processing software and integrated with national: o e-SWIS o e-GEMS o e-WQIS  Number of centres having agreed protocols and MoUs for data sharing and that are implementing them  Number of centres accessing local and distributed (cloud) data storage operational B1. Web-based Water Resource Information Systems

Output: Knowledge products and inter-active products and services developed and available through portals and other media Lead output indicator: Number of online national water applications available and used Other output indicators (broken down between central, regional, river basin and state levels):  Number of information products on-line (including: high-resolution topographic surveys, earth observation products, ensemble forecast products, web-based analytical tools)  Number of registered users  Number of times viewed  Number of times downloaded  Volume of data downloaded (in gigabytes) B2. Water Resources Information Products

C. Water Resources Operation and Planning Systems Outcome: Water information and tools are used to improve water resources allocation and management Outcome indicator: Number of states with water resources assessments and streamflow forecasting systems operational

Output: Water resources assessments developed Lead output indicator: Number of river basin models (with dynamic water resource assessments) developed Other output indicators:  Centralized modelling framework integrated into India-NWRIS  Number of knowledge products based on water accounting C1. River Basin Modelling

Output: Models and DSS for streamflow forecasting are developed and in use Lead output indicator: Number of streamflow forecasting stations with improved lead time Other output indicators:  Number of sub-basins with flood risk mapping Note: For the economic analysis, M&E will also track changes in reservoir operations and their impact on: (1) averting floods; and (2) reservoir levels and changes in availability of water for downstream use C2. Streamflow Forecasting and Reservoir Operations Systems

Output: Irrigation performance monitoring and planning are strengthened Lead output indicator: Number and area of irrigation schemes performance benchmarked Other output indicators:  Number of agencies using the tools developed for planning and design  Number of WUAs and members supported in community-based water monitoring C3. Irrigation Design and Operation

Output: Critical water resources knowledge gaps are filled Lead output indicator: Number of studies and analytical tools published and disseminated Other output indicators:  Number of events to disseminate and discuss the studies and analytical tools  Number of reservoir sedimentation data assessments published  etc. C4. Purpose-Driven Studies

D. Institutional Capacity Enhancement Outcome: Technical capacity for water resources planning and management is built Outcome indicator: Number of water resource management institutions with at least 50% of staff in relevant divisions trained in water resources management tools

Output: Water resources knowledge centres are developed and operational Lead output indicator: Number of existing centres developed and new centres operational Other output indicators:  National water resources knowledge centre operational  Number of sub-national centres operational at basin/regional level or state level D1. Water Resources Knowledge Centres

Output: Training is delivered and networking and knowledge exchange are facilitated Lead output indicator: Number of persons trained, broken into short term ( 6 months) Other output indicators:  Number of Implementing Agency training needs assessments  Number of Implementing agency training programs completed  Number of water management courses (national, sub-national level)  Number of customized longer term formal training programs  Number of broad-based post-graduate courses in WRM  Number of courses with international institutions (sandwich courses, short courses)  Number of virtual/web-based training courses D2. Professional Development

Output: Project activities are managed and facilitated efficiently Lead output indicator: Number of Implementing Agencies (IAs) achieving benchmark performance levels Other output indicators:  Technical assistance team (TMC) is in place and delivering according to ToR (YES/NO)  Number of states satisfied with services of TMC  Project procurement is on schedule (% lag, by IA)  Disbursement rates are on target (% lag, by IA)  Number of IAs submitting Utilization Certificates on time (% lag, by IA)  Unqualified audit reports (number and %)  Annual reports and M&E reports complete and timely (number and %) D3. Project Management

Next steps on monitoring Refine the definition of outcomes and outputs and the indicators Match the indicators with what is available from the MIS Collect the info on baseline and targets ….with priority to agreeing the PDO and lead indicators for outcome and output levels ….and to setting baseline and targets at that level Write ToR for TMC support to M&E

Setting baseline and targets Lead IndicatorBaselineTarget Number of operational Hydromet stations % of data that are digitized % of Hydromet stations integrated with on-line state and central databases Number of water resource management institutions conducting water resource assessments as standard practice Number of states with water resources information systems (WRIS) integrated with India- WRIS Number of states with water resources assessments and streamflow forecasting systems operational Number of water resource management institutions with at least 50% of staff in relevant divisions trained in river basin modelling or flood forecasting

Can we also evaluate impacts? BenefitData required for impact analysis Reduced flooding damages Past data on flow levels/releases and the corresponding flood losses Data on flow levels and releases for each reservoir Data on actual losses from floods Increased hydropower generation Estimates of the additional water that is available as a result of change in reservoir operations and the additional hydroelectricity generated as a result of this additional water Data on price at which this electricity is supplied. Increased drinking or industrial water supplies Estimates of the additional water that is available as a result of change in reservoir operations The allocation of this additional water for domestic or industrial uses Shadow price of water for domestic or industrial purposes Increased supplies for irrigation Estimates of the additional water that is available as a result of change in reservoir operations The allocation of this additional water for agricultural uses Shadow price of water for agricultural purposes to be used

NHP M&E Thank you very much