The new MEG tracker Marco Grassi INFN - Pisa Overview Timescale Tasks Funding.

Slides:



Advertisements
Similar presentations
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Advertisements

Status of the ATLAS MM project
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
PHENIX Drift Chamber operation principles Modified by Victor Riabov Focus meeting 01/06/04 Original by Sergey Butsyk Focus meeting 01/14/03.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
MM detector construction One or several modules per sector considerations.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
O 2 Project Roadmap P. VANDE VYVRE 1. O2 Project: What’s Next ? 2 O2 Plenary | 11 March 2015 | P. Vande Vyvre TDR close to its final state and its submission.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
R. Assiro (a), L. Cappelli (f), M. Cascella (d), L. De Lorenzis (e), F. Grancagnolo (a), A. L’Erario (a,e), F. Ignatov (h), A. Maffezzoli (e), A. Miccoli.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Liquid Argon Detector Developments at Ciemat. Participation of Ciemat at the ArDM experiment in Canfranc. Luciano Romero Manuel Daniel María de Prado.
The new MEG tracker Marco Grassi MEG Italia. CSN1 25/09/20122 Present system  16 chambers composed as follow 4 x12  m of kapton (cathodes) 50  m BeCu.
Overview of the MEG * CDCH * one of the following ( MEG UP MEG2 MEG + ) Marco Grassi on behalf of the CDCH Group.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
Overview of the MEGII CDCH Marco Grassi INFN Pisa.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
CLAS12 Forward Tracking: Status and Challenges
An active target for MEG2, a status report
PANDA Muon Group Meeting, Protvino 7 June 2011 G
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
CMS November Upgrade Week
Region I: stringing 1/3 done on 1st chamber!
Tassielli G.F. INFN Lecce & Università del Salento
Baby MIND beam test status
MicroMegas Mechanical Meeting --- Cern April 2014
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
Preparation of the CLAS12 First Experiment Status and Time-Line
GEANT Simulations and Track Reconstruction
Upgrade of the GlueX Spectrometer for Physics with Strange Final States Nuclear Physics Yi Qiang Nov. 13, 2011.
MEG II実験 液体キセノン検出器の建設状況
Limited Streamer Tube Project Summary
Presentation transcript:

The new MEG tracker Marco Grassi INFN - Pisa Overview Timescale Tasks Funding

Selected technology We selected the following detector single volume gaseous detector cylindrical shape with longitudinal wires U–V stereo for hit positioning along the chamber axis low mass gas ( He : iC 4 H 10 – 85:15 most probable) thin wires and small cell size Tentative goals Single hit resolution ~130  m in r Momentum resolution ~130KeV Angular resolution ~5 mrad DC-TC matching eff. ~ 90 % Referee - 15 Mar 20132

Pictorial view of Positron Spectrometer Not shown: COBRA Tracker Mechanics Tracker electronics Referee - 15 Mar 20133

Key elements Benefit from past experience and know how similar chambers were already successfully operated for many years new assembly technique has been defined and proved Use or reuse of existing infrastructures Work in parallel PSI INFN Lecce INFN Roma INFN Pisa Referee - 15 Mar 20134

Personal comments The schedule is tight no room for long R&D Multi - institutions project responsibilities & Tasks subdivision frequent meetings Kick-off meeting in Lecce Weekly phone meeting Robust system avoid technical challenges if not absolutely necessary put extra safety margin Referee - 15 Mar 20135

Schedule and Milestones Prototypes  Short prototypes for hit resolution (Rome, Lecce)  Si telescope for high precision tracking (Pisa)  Simple prototype for ageing (Pisa)  Long prototype to validate wire selection and mounting (Pisa)  “complex” prototype for validation of construction procedure (Lecce)  Mechanical prototype to compare End-Plates structures (Lecce, Pisa) Referee - 15 Mar 20136

Next year commitments Referee - 15 Mar 20137

Full schedule Referee - 15 Mar Internal milestones  10/2013 end of prototyping phase and end-plate design completion  06/2014 ready for assembly  04/2015 shipment to PSI contingency  06-09/2015 start of test run

COST Referee - 15 Mar 20139

Task: prototypes Referee - 15 Mar Existing prototypes  Single hit resolution  Rome 8x8 chamber  Lecce “tritubo”  Lecce “large chamber” (Mu2e)  Ageing  Pisa prototype  Mounting procedure  Lecce “large chamber” (Mu2e)  FE electronics  Single and 6 channels differential Other prototypes  Charge division  Wire type and cell stability  Full length simple prototype  End-plate structure  Mechanical prototypes  FE electronics  Single ended with cabling  HV system  Electronics vs commercial vs PSI solutions  Final mounting procedure  Single ended with cabling Several prototypes dedicated to answer specific questions

geometry prototypes constraints Tasks Referee - 15 Mar material simulation reconstruction performances end plates support structure gas vol. integration target assembling procedures mounting tools wiring tools assembly survey electronics cabling completion installation Gas system commissioning HV system monitor chamber PSI Lecce Rome/Pisa/Lecce Pisa/PSI Lecce/BINP Rome Pisa/Lecce all Pi/Le/Rm Pisa/Lecce Psi/Rome Rome Pisa PSI/Rome Pisa

Use of specific tools Referee - 15 Mar

Use of specific tools Referee - 15 Mar

Timing summary Referee - 15 Mar TaskStartcompletion GeometriaOra06/2013 Assembly procedureOra06/2013 End plate design05/201310/2013 Support struct. design05/201312/2013 Material procurement10/201306/2014 Mounting tool10/201306/2014 Wiring tool10/201306/2014 Assembly06/201402/2015 Laboratory test02/201504/2015 Integration at PSI05/201506/2015 Contingency06/201509/2015

Richieste per Marzo Fase critica: dall’approvazione all’estate 2013 Dettagli delle soluzioni tecniche finali Uso di semplici prototipi specifici su alcuni aspetti Prototipo finale Richieste di assegnazioni finanziarie limitate per la fase critica. Dettagli secondo la lettera inviata Referee - 15 Mar

Parte finanziaria Referee - 15 Mar

Parte finanziaria Referee - 15 Mar

Dettagli Pisa Referee - 15 Mar Prototipi corti  Invecchiamento  Fili argentati0.5 kE  Materiali2.0 kE  Gas alto flusso1.5 kE  Tritubo per guadagno e monitor  Costruzione2.0 kE Prototipi lungo semplice  Stabilità cella  Divisione di carica  Struttura 2.0 kE  End plate2.0 kE  Volume gas2.0 kE  Consumo2.0 kE Prototipo endplate  Possibile alternativa endplate bsaeline  Materiale 1.0 kE  Lavorazione2.0 kE  PCB1.0 kE