July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Operating Reserves and Extended Locational Marginal Pricing 1.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
Market Trials Update NATF March 2,
Wind Management at MISO
RTDF Overview of Data Analysis & Status of “Consesus Items”
Presentation transcript:

July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market Operations

2 Outline of Discussion ERCOT Usage of Non-Spinning Reserves ERCOT Usage of RUC Pricing Effects when Non-Spin deployed Proposal on how to minimize impacts to prices July 15, 2011

3 Outline of Discussion ERCOT Usage of Non-Spinning Reserves ERCOT Usage of RUC Pricing Effects when Non-Spin deployed Proposal on how to minimize impacts to prices July 15, 2011

4 ERCOT Usage of Non-Spin July 15, 2011 Approximately 55 Non-Spin deployments between go-live Dec 1, 2010 – June 30, 2011 Most deployments lasted between 1 and 3 hours. The February 2 deployment lasted 53 hours, but all other deployments were less than 12 hours.

5 ERCOT Usage of Non-Spin (continued) July 15, 2011 On average, ERCOT operator utilizing smaller Non-Spin MW deployments over time

6 ERCOT Usage of Non-Spin (continued) July 15, 2011 The LSL amount injected by offline non-spin start-up varies

7 Outline of Discussion ERCOT Usage of Non-Spinning Reserves ERCOT Usage of RUC Pricing Effects when Non-Spin deployed Proposal on how to minimize impacts to prices July 15, 2011

8 Analysis of RUC Commitments (May/June 2011) RUCs May/June analyzed to determine levels committed ERCOT Operator reason for RUC commit: –For Capacity/Ramping Issues, Congestion/Voltage, or the reason was unlisted (If both Congestion and Capacity was listed, the reason used was Capacity/Ramping) July 15, 2011 RUC Executed in May and June (Commitments for Hours Ending Only) HRUCDRUCCombination of DRUCs and HRUCs Avg. Hourly Sum of Additional HSL/LSL from Resource Commitments 501/155164/ MW HSL / 213 MW LSL (Total) Avg. Hourly Sum of Additional HSL/LSL from Resource Commitments (Listed Reason was Capacity/Ramping Issues) 173/5017/5 190 MW HSL / 55 MW LSL (Capacity/Ramp) Less than 0.5% of peak load Avg. Hourly Sum of Additional HSL/LSL from Resource Commitments (Listed Reason was Congestion/ Voltage) 319/103147/ MW HSL / 156 MW LSL (Congestion/Voltage) Avg. Hourly Sum of Additional HSL/LSL from Resource Commitments (No Reason was Listed) 9/20/0 9 MW HSL / 2MW LSL (Not specified)

9 Analysis of RUC Commitments (May/June 2011) There were total 2,436 RUC unit hours with Energy Offer Curves in May and June. –About 2/3 of RUC committed resources with Energy Offer Curves remained at LSL as price takers 1,604 unit hours at LSL, with 832 unit hours moved above LSL Average MW above LSL = 14 MW for RUC interval Implies that RUC energy offer curves are not economic to SCED July 15, 2011

10 ERCOT Usage of Non-Spinning Reserves ERCOT Usage of RUC Pricing Effects when Non-Spin deployed Proposal on how to minimize impacts to prices Outline of Discussion July 15, 2011

11 Non-Spin Deployment impacts on prices July 15, 2011 The red line below reflects the average HUBAVG LMP across all Non-Spin deployments showing a $50 average system price reduced by $10-15 after non-spin deployed/stabilized. - Data below for Dec 1- May 28 Non-Spin Deployments (47instances) Graph shows the HUBAVG LMP from 30 minutes prior to Non-Spin deployment to one hour after Non-Spin deployment for all Non-Spin deployments except the February 2 deployment, which was excluded due to the extended period of $3001 LMP following deployment.

12 ERCOT Usage of Non-Spinning Reserves ERCOT Usage of RUC Pricing Effects when Non-Spin deployed Proposal on how to minimize impacts to prices Outline of Discussion July 15, 2011

13 Proposal on how to minimize price impacts ERCOT has considered how to minimize or remove pricing impacts to prices from deployment of reliability services ERCOT’s recommendation will : –Compensate for the effect that the block of injected LSL energy from non-spin resources has on prices, and –Create reliability energy offer curves that are near the end of the aggregate market offer curves. July 15, 2011

14 Proposal on how to minimize price impacts ERCOT’s proposed solution at a high level is: 1- Create reliability energy offer curves as follows: At the end-of Adjustment period, ERCOT calculates the price at 90% of the total capacity for the COP Online Quick Start Offer Curves in the upcoming Operating Hour (90% or agreed to %). This will be the offer floor for the Non-Spin segment of the EOC. Offer Curves are modified by SCED –For Offline Non-Spin by applying the offer floor from LSL to HSL –For Online Non-Spin by applying offer floor to the segment of the curve from (HSL – sum of all AS responsibility) to HSL In this manner, ERCOT will give a dispatch economic order preference to market resources –Non-spin energy is inserted in the offer stack above competitive offers July 15, 2011

15 Proposal on how to minimize price impacts ERCOT’s proposed solution at a high level is: 2- Prevent the block of energy at LSL injected by reliability resource from decreasing the prices Introduce a price adder with an extra step in SCED to offset/wash-out the potential price reversal –Will compute prices without LSL impact of offline non-spin –Will compute normal dispatch solution with prices and base points –Difference in the two computations becomes the dynamic adder to all prices »LMP = system lambda –SF*(shadow price) + dynamic adder July 15, 2011

16 Summary and other considerations… In summary: –Mitigates the effect of LSL energy block deployment on prices –Allows the market to determine the prices dynamically no administrative pricing –The mechanics of solving congestion do not change –Maintains existing operational deployment procedure, thus no degradation of reliability ERCOT has not evaluated: –Technical feasibility and/or performance impacts to SCED –Protocol development required –Project cost and timeline for potential delivery not considered July 15, 2011