Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.

Slides:



Advertisements
Similar presentations
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Advertisements

13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Global design effort 1-2 May 06 LCFoA Meeting Global design effort Americas 1 G. Dugan ILC/GDE and Cornell University LINEAR COLLIDER FORUM OF AMERICA.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global design effort Americas 20 April 06 P5 meeting 1 G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 ILC-Americas Regional Program.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
EDR HLRF Work Packages Draft Summary
ILC Global Design Effort
Barry Barish GDE Caltech
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007

Beijing GDE Meeting Global Design Effort 2 ANL-Kwang-Je KimBNL-Brett Parker Fermilab-Bob Kephart, Shekar Mishra, Sergei Nagaitsev Cornell LEPP- Hasan Padamsee, Mark Palmer LBNL -Mike Zisman, Christine Celata Jefferson Lab -Swapan Chattopadahay, Warren Funk LLNL -Jeff Gronberg SLAC -Tor Raubenheimer, Nan Phinney, Tom Himel TRIUMF - Shane Koscielniak In the Americas region, the ILC program (the RDR effort, and supporting ILC R&D), is executed by the Americas Regional Team, under the co- ordination of the GDE Americas Regional Team (ART) Universities- George Gollin ART Director – Gerry Dugan & Mike Harrison Americas Accelerator Lead – Tor Raubenheimer

Beijing GDE Meeting Global Design Effort 3 ART Funding Most funding is from US DOE HEP office Additional funding from US NSF and other countries (Canada) are starting to participate DOE ILC accelerator budgets –FY2005: 22 M$ + ~10 M$ other funds –FY2006: 30 M$ + ~12 M$ other funds –FY2007: 60 M$ (we hope) + ~5 M$ other funds FY07, FY08, and FY09 includes detector R&D funding –FY2008: 75 M$ + SCRF infrastructure (~45 M$) –FY2009: 90 M$ + SCRF infrastructure (~45 M$)

Beijing GDE Meeting Global Design Effort 4 Americas Planning: FY06 & FY07 Plans for 2006 and 2007 were developed from proposals submitted by the labs –Proposals were submitted to Gerry Dugan Typically proposals amounted to ~2x available funding Gerry selected and narrowed scope to fit in budget Participating labs and Gerry wrote MOUs & task sheets –In 2006, international GDE was just starting and could provide little guidance –In 2007, GDE R&D Board and RDR Management Board reviewed proposals and provided suggestions for R&D and RDR programs DOE reviewed ART program in April, 2006 and will review again in April, 2007

Most labs are also putting additional funds into ILC R&D. For example, Fermilab is devoting an additional ~$12 M to developing SCRF infrastructure. ART FY06 Budget by Topic

Beijing GDE Meeting Global Design Effort 6 ART FY06 Budget by Lab Most labs are also putting additional funds into ILC R&D. For example, Fermilab is devoting an additional ~$12 M to developing SCRF infrastructure.

Beijing GDE Meeting Global Design Effort 7 Design and engineering efforts in support of the GDE Technical Design Report (EDR). Cavity and cryomodule work RF system development Sources, Damping rings, beam delivery Global systems Technical R&D in support of the US regional interest (proposal to be developed by Osaki panel, formed under the auspices of the LCSGA) ART Program Breath (2007)

Beijing GDE Meeting Global Design Effort 8 FY07 Lab Requests Large increases across the program to pursue the R&D but roughly 2x available funds (Presidents FY2007 budget). Meeting in May, 2006 to eliminate duplication and improve coordination between labs.

Beijing GDE Meeting Global Design Effort 9 ILC Global R&D Board reviewed FY07 proposals in light of the GDE ILC priorities The RDB generated an R&D table in spring 2006 that prioritized R&D topics The R&D Board tried to map this across onto the ART WBS and work packages –Mixed success on this first try – hard to make the mapping and hard to understand connections between proposals – good start Subsequently the results from the RDB task forces will help clarify the R&D goals for many of the systems Global Design Effort R&D

Beijing GDE Meeting Global Design Effort 10 FY07 Budget Proposal The details can be found at:

Beijing GDE Meeting Global Design Effort 11 Highlights of FY07 60 M$ Proposal Big increases for cavity/cryomodule and rf sources –Fabricate (in industry) 24 and process (at labs) 12 ILC high-gradient cavities –Continue R&D on EP processing and develop EP facility at ANL –Build 1 st US-built cryomodule and design Type-IV cryomodule –Build 2 new L-band rf stations with Marx and DTI modulators and CPI and Toshiba klystrons Increased effort on global systems: DR kickers, LLRF, controls, and availability related issues –Support for ATF2 program PS and instrumentation development Increase engineering efforts to start work on EDR

Beijing GDE Meeting Global Design Effort 12 ART FY08-09 Planning Program planning and management of the ILC program in the Americas region for the FY08-09 period will rely on a group of WBS level 2 managers Under the guidance of the ILC-Americas Regional Director and the GDE Accelerator Design Leader for the Americas, the WBS managers will formulate and guide a collaborative design and R&D program This program will utilize the resources in the national laboratories and universities to carry out the GDE-directed R&D and design activities associated with the preparation of the ILC Engineering Design Report Two planning meetings in fall 2006

Beijing GDE Meeting Global Design Effort 13 The scope covers what is needed to complete the Engineering Design Report (EDR), i.e., produce an engineering design for the ILC, and complete the R&D needed to demonstrate feasibility of the key baseline technologies and to finalize baseline design choices The plan also include ‘regional interest’ activities. These are preparatory site-specific activities (Americas site civil engineering, site-specific accelerator design, industrialization activities) The plan must be well-coordinated with the GDE priorities and with activities in the other regions Once developed, our plans in these areas may need to adapt to GDE planning as this becomes more mature Guidelines for FY08-09 planning

Beijing GDE Meeting Global Design Effort 14 FY08-09 WBS FY08-09 based on FY06-07 ART WBS –Main portions are 2.x, 3.x, and 5.x Level 1 WBSLevel 2 WBS WBS arranged by Areas and major technical systems

Beijing GDE Meeting Global Design Effort 15 FY08-09 Planning: WBS L-2 Leads Global systems: J. Carwardine (ANL)*, R. Larsen (SLAC) Electron sources: A. Brachmann (SLAC)*, M. Poelker (Jlab) Positron sources: J. Sheppard (SLAC)*, J. Gronberg (LLNL) Damping rings:M. Zisman (LBNL)*, M. Palmer (Cornell) Ring to Main Linac and Main Linacs: Optics, beam dynamics: P. Tenenbaum (SLAC)*, N. Solyak (FNAL) ML RF systems: C. Adolphsen (SLAC)*, S. Nagaitsev (FNAL) ML Cavities and Cryomodules:S. Mishra (FNAL)*, H. Padamsee (Cornell - SRF collaboration leader), J. Mammoser (JLab), M. Kelly (ANL) Beam delivery system:A. Seryi (SLAC)*, B. Parker (BNL) Conventional facilities:V. Kuchler (FNAL)*, F. Asiri (SLAC) Regional Interest:R. Kephart (FNAL)*, E. Paterson (SLAC) * = lead coordinator

Beijing GDE Meeting Global Design Effort 16 FY08-09 Budget Guidance Totals based on guidance from DOE –Two models: ILC only or ILC + SCRF funding –FY08: 75M$ + 45M$ (SCRF Infrastructure) –FY09: 90M$ + 45M$ (SCRF Infrastructure) Provided 1 st guidance for Level-2 managers based on expectations of program needs –Iterate and rebalance and 1 st proposals Requested plans for both Target 1 & 2 prioritized to facilitate the rebalancing between programs

Beijing GDE Meeting Global Design Effort 17 FY08-09 Budget Guidance

Beijing GDE Meeting Global Design Effort 18 Highlights of FY08-09 Program Support for S0/S1/S2 world-wide program –Scope of program (Industrial and S2 support) depends on SCRF funding Development program for rf power sources –Sources provided for ILCTA/S2 test Global systems program with controls, LLRF and support for test facilities Broad damping ring program including e- cloud and kicker development Strong BDS effort coordinated with UK CFS program for EDR and to develop sites

Beijing GDE Meeting Global Design Effort 19 Next Steps for FY08-09 FY08-09 budget mainly focused on R&D – some support for EDR but likely insufficient Planning was based on completion of 60 M$ program in FY07 but continuing resolution and lower budget will cause elements to be deferred to FY08-09 Big variation depending on availability of additional SCRF funding –President’s FY08 budget to be released this week – we’ll see! Some international consideration but need to develop a real integrated international plan

Beijing GDE Meeting Global Design Effort 20 Summary ART has been organizing a strong ILC effort Planning process has evolved from prioritizing lab proposals towards more of a project structure Detailed plans have been developed for FY08-09 –These can be used when developing an international plan for the EDR –WBS arranged by Area and major Technical but need additional effort from TS/GS –Need to include sufficient engineering for the design effort and need to update the plans for the actual effort in FY07