Energy Coal, HSEC, September 2009 ICAM : Oil Circuit Breaker Explosion Incident date: Saturday 5 th September, 2009 Before After.

Slides:



Advertisements
Similar presentations
Incident took place at OPP substation at 9. 31
Advertisements

Electrical Safety.
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Inspection & Preventive maintenance of breakers
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Accident Investigation Root Cause Analysis
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
1 Arc Flash Hazard Mitigation Analyse, Maintain, Mitigate. E3 Calgary – September 16, 2014 Dean Wiersema.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Significant Potential Incident Arc Flash Timmins, Ontario, Canada March 3, 2011.
1 – Electrical Hazard Recognition EFCOG Electrical Safety Subgroup May 2015 Electrical Safety Month 2015.
SF6 load-break switch-disconnector
INJURY PREVENTION ARC FLASH REGIONAL SAFETY MEETING.
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
Qualified Persons Working On Or Near Energized Equipment
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Gregory S. Leslie, CSP – PP NAM Field Service OHS Director, March 27, 2012 SCG&E Arc Flash Event © ABB February 7, 2012 Slide 1.
UMKC Senior SUBSTATION DESIGN TEAM
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Power Distribution Harmonics Case Study of 285-3F Chiller Plant Michael W. Harmon Principle Engineer Savannah River Nuclear Solutions, LLC Savannah River.
Hazard Identification
Circuit breakers The main purpose of a circuit breaker is to: Switch load currents Make onto a fault Break normal and fault currents Carry fault current.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Hot Work Procedure and Permit
Westminster Kingsway College Professional Chef Diploma Unit 703 S.Greubel.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Brian Goepfert District Staff Assistant Metal/Non-metal Rocky Mountain District Denver, CO
© Methods of Control Module 4. © Recognize Control Evaluate.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
Welcome to Electric Dept. Rajkot Division. How MCB works.
NFPA 70E Electrical Safety in the Workplace. Objectives What NFPA 70E covers Understand Arc Flash, Incident Energy, & Flash Protection Boundary Standards,
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
Utility Engineers, PC.  Generation  Transmission  Distribution.
Fire Risk In Power Facilities. Introduction Fires in Power Plants or Distribution Facilities have occurred World Wide Many have resulted in Plant Shutdowns.
Submitted to: Submitted by:
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Submitted to: Submitted by:
Air Blast Circuit Breaker
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
Electrical Safety, Subpart K
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
Condition Monitoring of Circuit Breakers and Switchgear
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
2011+ NEC Article Arc Energy Reduction. Where the highest continuous current trip setting for which the actual overcurrent device installed.
March 27, 2012 Arc Flash Event © ABB February 7, 2012 Slide 1.
DESCRIPTION AND GUIDE TO OPERATIONS
the CERN Electrical network protection system
Circuit Breakers & Reclosers
High Voltage Power Circuit Breakers
ELECTRICAL POWER-II Electrical engineering sixth semester
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
PSS0 Design & Concept of Operations
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Electrical components and systems
0 Air Blast Circuit Breaker under the guidance of:- Presented By:- Mr. B.R.Reddy Anuj Kumar Pandey EN-3 rd year Roll No Unrestricted.
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Substation Equipment's
Presentation transcript:

Energy Coal, HSEC, September 2009 ICAM : Oil Circuit Breaker Explosion Incident date: Saturday 5 th September, 2009 Before After

Energy Coal, HSEC, September 2009 Incident Description DateTimeMine 5 th Sept h20MMS (Douglas Plant) Employee / Contractor / 3rd Party Controlled / Monitored / Uncontrolled EmployeeControlled Zero Barrier?Repeat Incident? Yes No Description of Incident The authorised electrician undertook remote switching of an 11kV Oil Circuit Breaker (OCB) at the Douglas Plant main substation. The OCB exploded, probably due to mechanical failure, and the resultant blast wave blew off the doors of the substation, and seriously damaged the building. The electrician broke his upper right arm when the door behind which he was standing was forced violently open. An intense fire followed, destroying all equipment within the substation.

Energy Coal, HSEC, September 2009 Diagram of substation layout Main incomer from Eskom Outgoing cables to plant, etc. Outgoing cable to river pump mini-substation. It was this line that had a fault that caused the initial trip. OCB Rope lanyard to OCB X X Position of authorised Electrician when switching Position of second electrician Front doors blown off, and went through a chain- link fence, finally landed 20m away.

Energy Coal, HSEC, September 2009 Incident Overview (photos) Position of electrician when switching. Note the flash-suit worn during operation. This door was latched, top and bottom, and exploded outwards

Energy Coal, HSEC, September 2009 Incident Overview (photos) Bank of OCB’s. The unit second from right exploded. The rest were damaged by the blast and ensuing fire. Relays housed in this unit Breakers in this unit, submerge d in oil. Note blast damage to steel casing.

Energy Coal, HSEC, September 2009 Incident Overview (photos) Above: Position of front doors. They were blown towards the camera position, and though a chain-link fence, the remains of which can be seen in the foreground. Left: Doors behind which electrician sheltered during switching. Note the cracks in the brickwork. Supports were installed after the event.

Energy Coal, HSEC, September 2009 Underlying Root Cause & Key Contributing Factors Underlying Root Cause: The contacts in the switchgear did not engage or disengage correctly in time to prevent prolonged arcing and subsequent oil vaporisation, which led to a violent explosion within the substation. Key Contributing Factors: 1.Age of the switching equipment (OCB switchgear) 2.Cable fault and the electromechanical relay not flagging the cause of the trip prior to the incident occurring 3.Risk assessment not considering the explosion potential Key Learnings: 1.Following procedures to the letter can save lives - operational discipline 2.OCB switchgear has explosion potential and must be managed accordingly 3.The fundamental success of safety depends on thorough risk assessments

Energy Coal, HSEC, September 2009 Permanent Corrective Actions to be Taken ActionHOCBy whoBy when Replace all OCB's with modern technology (SF6 or vacuum) Substitute J Page / Operations 31 August 2011 Ensure electrical remote switching is fitted to all medium voltage switchgear to allow for switching from outside the building (at a safe distance) in which the switchgear is housed Separate J Page / Operations16 October 2009 Where OCB's are currently used, all baseline risk assessments must be reviewed to include mitigation strategies for explosions. The hierarchy of controls must be applied. Revise procedures accordingly Administrate S Lipp 30 September 2009 Comprehensive testing must be done on all medium voltage switchgear. This includes oil testing, speed tests and testing of all mechanisms. Administrate S Lipp 31 December 2009 Align Douglas Plant emergency procedure with that of Middelburg Mining Services Administrate L van Tonder 30 September 2009 Full flash suits must be worn when local racking and spring charging takes place on medium voltage switchgear PPE S Lipp 30 September 2009