Scale and Scope of Highway Safety Manual Implementation in the Project Development Process For the Federal Highway Administration (FHWA) By Science Applications.

Slides:



Advertisements
Similar presentations
Project Name Kelly Waters July Author: Date: Version:
Advertisements

CASDA Project Management A presentation to the CASDA Preliminary Design Review IM&T / CASS Dan Miller | CASDA Project Manager 11 March 2014.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
Transportation leadership you can trust. presented to FHWA’s Talking Freight Seminar presented by Michael Williamson Cambridge Systematics, Inc. April.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
IT Strategic Planning Project – Hamilton Campus FY2005.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
IS&T Project Management: Project Management 101 June, 2006.
An Introduction to Documentation Project Management Charles Fisher, Datatel, Inc. STC Washington DC Chapter Workshop November 18, 2004.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
1. RCC Action Plan Item: Financial Protection for Produce Sellers Webinar presentation December 2013 Agriculture and Agri-Food Canada (AAFC)
Conducting the IT Audit
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Introduction to Interactive Media 02. The Interactive Media Development Process.
FHWA Next Generation Simulation (NGSIM) Program 2007 TRB Planning Applications Conference Daytona, FL May 7, 2007 James Colyar, P.E. Highway Research Engineer.
Transportation leadership you can trust. presented to Transportation Planning Applications Committee (ADB50) presented by Sarah Sun Federal Highway Administration.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
Better Business Cases “Investing for change” Overview
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
Planning and Writing Your Documents Chapter 6. Start of the Project Start the project by knowing the software you will write about, but you should try.
FHWA Reorganization Update Program Performance Management Standing Committee on Performance Management Meeting Detroit, MI October 14, 2011 Peter Stephanos.
MULTIMEDIA DEVELOPMENT
WVDOT/MPO/FHWA Transportation Planning Conference WVDOT Traffic Data Collection, Processing and Analysis Handbook Presented to September 16, 2015 Presented.
Introduction to Interactive Media The Interactive Media Development Process.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
Unit 5 – eProject – Project Organisation Procedures Set up and use procedures for storing and protecting project information, tracking and monitoring progress.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
EMME Users’ Group Meeting NSW Modelling Guidelines - Highway Assignment 27 May 2011.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
3/17/2008AMATS: Anchorage Metropolitan Transportation Solutions AMATS Air Quality Advisory Committee Informational Update March18, 2008.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Update on the MA Task Force on Evaluation of Teachers and Administrators Presented to the Board of Elementary and Secondary Education Associate Commissioner.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
Conference or Meeting Name 1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith June 12, 2003.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Guidance for Implementation of Traffic Incident Management Performance Measurement TRB’s National Cooperative Highway Research Program (NCHRP) Project.
IAIA Conference on international experience & perspectives in SEA, Prague, September 2005 IAIA Conference on international experience & perspectives.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
A Software Engineering Model Based Curriculum Development Approach Leon Pan University of the Fraser Valley.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Sample Fit-Gap Kick-off
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Project Integration Management
EPICS Design Review Template Notes:
TPF-5(255) HSM Implementation Pooled-Fund Study
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Outcome TFCS-11// February Washington DC
EPICS Conceptual Review Template Notes:
Project Initiatives Identified by the CIA Project
Rail Program Management Services
Project Management Process Groups
Presentation transcript:

Scale and Scope of Highway Safety Manual Implementation in the Project Development Process For the Federal Highway Administration (FHWA) By Science Applications International Corporation (SAIC) Texas A&M Transportation Institute (TTI) Kimley-Horn & Associates (K-H)

Presentation Overview 1. Project Background and Objective 2. The Work Plan 3. Deliverables & Schedule 4. Review Process and Discussion Programming Planning/Scoping Preliminary and Final Design Construction 2

1. Project Background -- Team FHWA ◦ Ray Krammes SAIC ◦ Jennifer Atkinson, Task Manager ◦ Kelly Donoughe TTI ◦ Karen Dixon, Principal Investigator ◦ Mike Pratt K-H ◦ Mike Colety 3

Project Overall Objective Develop an implementation manual that will: Aid decision makers in applying HSM and other safety procedures to projects of all sizes and scopes and at all stages of the project development process, and Provide linkage between the project development process and the HSM 4

2. The Work Plan Task 1. Project Management Task 2. Develop Annotated Outline for the Informational Guide Task 3. Write Informational Guide Task 4. Develop Outreach Plan and Deliver Outreach Materials/Events 5

Task 1: Task Management Deliverables: Kick-off meeting,, kick-off meeting summary, monthly progress reports and conference calls. Task 1: Task Management Deliverables: Kick-off meeting,, kick-off meeting summary, monthly progress reports and conference calls. Task 2: Develop Annotated Outline for the Informational Guide Deliverables: Draft Annotated Outline, Stakeholder Review, Final Annotated Outline. Task 2: Develop Annotated Outline for the Informational Guide Deliverables: Draft Annotated Outline, Stakeholder Review, Final Annotated Outline. Task 4: Develop Outreach Plan and Deliver Outreach Materials/Events Deliverables: Draft and Final Outreach Plan, Draft and Final Flyer, Draft and Final /Newsletter Announcement, Draft and Final Presentation Materials, Webinar Delivery, Two In-person Events Task 4: Develop Outreach Plan and Deliver Outreach Materials/Events Deliverables: Draft and Final Outreach Plan, Draft and Final Flyer, Draft and Final /Newsletter Announcement, Draft and Final Presentation Materials, Webinar Delivery, Two In-person Events Subtask 2a: Develop Draft Annotated Outline Subtask 2a: Develop Draft Annotated Outline Subtask 2b: Facilitate Annotated Outline Feedback Subtask 2b: Facilitate Annotated Outline Feedback Subtask 2c: Finalize Annotated Outline Subtask 2c: Finalize Annotated Outline Task 3: Write Informational Guide Deliverables: Draft Informational Guide, Stakeholder Review, Final Draft Informational Guide, Final Version Informational Guide Task 3: Write Informational Guide Deliverables: Draft Informational Guide, Stakeholder Review, Final Draft Informational Guide, Final Version Informational Guide Subtask 3b: Facilitate Informational Guide Feedback Subtask 3b: Facilitate Informational Guide Feedback Subtask 3a: Develop Draft Informational Guide Subtask 3a: Develop Draft Informational Guide Subtask 3c: Finalize Informational Guide Subtask 3c: Finalize Informational Guide Subtask 4a: Develop Outreach Plan Subtask 4a: Develop Outreach Plan Subtask 4b: Develop Outreach Products for Publication Subtask 4b: Develop Outreach Products for Publication 2. The Work Plan 6

Task 2. Develop Annotated Outline for the Informational Guide Subtask 2a: Develop Informational Guide Draft Annotated Outline ◦ Background ◦ Overview ◦ HSM Approach Compared to Traditional Safety Evaluation ◦ Incorporating Safety into Project Planning ◦ Incorporating Safety into Alternative Identification and Evaluation ◦ Incorporating Safety into Preliminary Design ◦ Incorporating Safety into Final Design ◦ Transportation Safety Process ◦ Additional Resources 7

Task 2. Develop Annotated Outline for the Informational Guide Subtask 2b: Annotated Outline Feedback ◦ Engage a Stakeholder Review Panel ◦ Hold webinar to discuss comments (for two rounds of comments) Subtask 2c: ◦ Finalize Annotated Outline based on panel’s comments 8

Preliminary Outline Structure for Informational Guide 1. Background 2. Overview 3. HSM and Traditional Safety Evaluations 4. Incorporating Safety into Project Planning 5. Incorporating Safety into Alternative Identification and Evaluation 9

Preliminary Outline Structure for Informational Guide (cont.) 6. Incorporating Safety into Preliminary Design 7. Incorporating Safety into Final Design 8. Transportation Safety Processes 9. Additional Resources and Tools 10

Task 3. Write Informational Guide Subtask 3a: Draft Informational Guide ◦ Key: Link project development activities to HSM guidance (see next slide) ◦ Key: Make the document flexible, considering all users ◦ Use decision trees, flowcharts, written text 11 Develop “continuous” case studies, where feasible, to illustrate application of HSM through each project development phase.

Task 3. Write Informational Guide Project Development Step Activity Example HSM Guidance Project Planning (after included in TIP) Identify project issues and alternative solutions Chapters 4 through 7 Alternatives Identification and Evaluation Assess alternatives based on safety Chapters (Safety Prediction) and Chapters (CMFs) Incorporate safety findings into overall alternative analysis Chapters 6-7 Determine preferred alternative Chapters 9 and Preliminary Design Develop preliminary design plans for preferred alternative Chapters 2 and 6-7 Evaluate how project-related safety performance is impacted Chapters (Safety Prediction) and (CMFs) Refine preliminary design decisions and document Chapters 9 and Final Design Develop final design plans based on preliminary design refinement Chapters 2 and 6-7 Perform design exception analysis as appropriate Chapters (Safety Prediction) and (CMFs) Evaluate how project-related safety is affected and balanced with other design elements (operations, environment, land use impacts, cost, etc.) Chapters 7 and 8 Finalize design and constructChapters 9 and

Task 3. Write Informational Guide Subtask 3b: Informational Guide Feedback ◦ Engage a Stakeholder Review Panel from Task 2 ◦ Hold webinar to discuss comments (for two rounds of comments) Subtask 3c: Final Informational Guide ◦ Finalize Guide based on panel’s comments 13

3. Key Deliverables & Schedule Key DeliverablesDue Date Pooled-Fund Web-Enabled Conference CallOctober 14, 2014 Draft Annotated OutlineNovember 21, 2014 Stakeholder Review of Annotated OutlineDecember 5, 2014 Draft Comment Response MatrixDecember 19, 2014 Final Annotated OutlineJanuary 3, 2015 Final Comment Response MatrixJanuary 3, 2015 Draft Informational GuideMay 3, 2015 Stakeholder Review of Draft GuideJune 3, 2015 Draft Comment Response MatrixJuly 3, 2015 Final Draft Informational GuideJuly 3, 2015 Final Informational Guide suitable for publication September 3,

4. Review Process and Discussion Identify Stakeholder Review Panel Members Ideas as to Engaging Project Development Personnel for Review Process in Addition to Safety Experts Tiered Review Discussion ◦ Smaller Stakeholder Group to Review Entire Document ◦ Larger Group to Provide Feedback to Structure and Select Content Schedule (Feedback) Flexibility Associated with External Meetings (TRB, Pooled-Fund, etc.) Other Discussion Items? 15

16 Jennifer E. Atkinson, P.E. Leidos (formerly SAIC) Karen K. Dixon, Ph.D., P.E. Texas A&M Transportation Institute Mike Colety, P.E. Kimley-Horn Key Team Members Contact Information