© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 4 STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE.

Slides:



Advertisements
Similar presentations
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Advertisements

Construction Engineering 221 Cost Estimating and Bidding II.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Click to edit Master title style Liabilities that are to be paid out of current assets and are due within a short time, usually within one year,
10 Current Liabilities and Payroll Liabilities that are to be paid out of current assets and are due within a short time, usually within one year,
Appendix on Payroll Accounting
The Risks and Rewards of Contractor Bids and Proposals.
INCENTIVES & FRINGE BENEFITS. Variable Pay Or Pay For Performance Systems Here the pay is linked to individual, group or organisational performance. Employees.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Controlling Labor Costs
Current Liabilities and Payroll
Welcome to Financial Series #1 The Income Statement.
ESTIMATING By Laith Jacob.
Prof Awad S. Hanna Labor Cost and Sources of Labor Costs.
1 Construction Engineering 221 Construction Insurance.
EM15 – Contractors COST MANAGEMENT
Chapter 10 Pricing Equipment. Renting Equipment There can be advantages to renting rather than owning construction equipment; including: –The builder.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Chapter 14 – Budgeting, Accounting and Financial Management
Business Accounting Chapter 12. Importance of Payroll Records Required by law – keep accurate payroll records – report employee earnings – pay payroll.
Kuliah Ekonomi Teknik JTK FT UGM Total product cost  Total product cost: costs for operating the plant and selling the products.  Total product.
Chapter 23 Understanding Income and Taxes
SHOW ME The MONEY Just how much do you know about how people get paid?
SMALL BUSINESS RESOURCE GUIDE CHECKLIST FOR GOING INTO BUSINESS.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
SCORE ® Counselors to America’s Small Business Service Corps of Retired Executives Create a Winning Business Plan Session 5 Supporting Documents Other.
Employment and Budgeting
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
Payroll Accounting Making Accounting Relevant Businesses issue payroll checks to their employees to compensate them for work performed. Making Accounting.
OH 9-1 Controlling Labor and Other Costs 9 OH 9-1.
Technical Manager; Bechtel Oil, Gas & Chemicals.
S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
Chapter1Chapter1 ACCOUNTING FOR MANUFACTURING OPERATION.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Current Liabilities and Payroll Chapter 11.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 15: Our Economy and You Social Science. Income Managing your money takes several steps, the first of which involves what you make There are several.
Chapter 5 Compensation & Benefits
DR. Nabil Dmaidi Labor Cost and Sources of Labor Cost.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
Estimating CE-147 Week 2. Estimate Types Concept Detailed Definitive.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Objective 4.01 Understanding Financial Management. 1.
Budgeting and Cost Estimation Objective: – Introduce some simple concepts regarding developing project budgets and cost projections.
The Decision Maker. Managing a Profitable Company.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
4. Price Labor, Materials, and Equipment Ⓒ. L ABOR C OST Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal.
Personal Finance Employee Pay & Benefits Chapter Six Notes.
COST PLUS. Reasons for Cost-Plus Can’t agree on a price Specialty work Notice of Changed Conditions.
Is There a Proper Accounting for Indirect Costs?
Employee Pay and Benefits
Process Economics Factors that affect profitability
Pay, Benefits, and Incentives
Equipment Costs and Sources of EQUIPMENT COST
Costs and Economics of Construction
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Money Management Chapter Six Notes Employee Pay and Benefits
BUSINESS INCOME COVERAGE EXPENSE CHART
Estimating – Overhead, Profit, Margins, & Markups workshop
Estimating – PRICING Materials, Equipment, & Labor Workshop
Understanding Benefits
Presentation transcript:

© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 4 STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE

© Prof Awad S. Hanna2 1. Study project documents 2. Develop Work Breakdown Structure (WBS) and Cost Code 3. Determine quantity take off 4. Price materials, equipment, and labor 5. Define work done by others and obtain quotations (subcontractors) 6. Determine job overhead costs 7. Determine markup percentage 8. Determine bonding costs Ⓒ Steps in the Development of a Detailed Estimate

© Prof Awad S. Hanna3 1. Study Project Documents   Check for discrepancies between drawings and other contract documents.   Check for drawings that are not to scale (NTS) or reduced in size.   Develop a fact sheet that identifies:   Unusual dimensions   Payment methods   etc….. Ⓒ

© Prof Awad S. Hanna4 2. Develop Work Breakdown Structure (WBS) and Cost Code   Review Lecture 3 Ⓒ

© Prof Awad S. Hanna5 3. Tips for Determining Quantity Take Off   A good approach for estimating quantities is to follow the order of the actual field construction.   Use systematic procedure when taking off quantities (clockwise).   Quantities taken off should be identified by location on the drawings.   Use decimals instead of fractions.   Quantities taken off need not to be precise.   Add allowances for waste for certain quantities. Ⓒ

LaborMaterialEquipmentSubcontract Company Overhead Contingency Direct Costs Job Overhead Bonding Mark up Profit Prof Awad S. Hanna 6 Ⓒ

© 7 4. Price Labor, Materials, and Equipment   Once the quantity take off is completed, apply pricing to the quantities.   Best method for obtaining accurate pricing is to call suppliers.   Means manuals may be used but adjustments may need to be made.   May need to project costs forward to the time when they will be purchased or installed. Ⓒ

Labor Cost Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal Insurance Contribution Act 4.Unemployment Compensation Tax/Insurance 5.PL&PD- Public Liability and Property Damage Insurance 6.Fringe Benefits © Prof Awad S. Hanna8 Ⓒ

Labor Wages   Vary considerably with locations and types of crafts   Agreements such as Union / Open-Shop / Prevailing Wage   The above wage rates are known as Base Wage Rate   Compensation for 40 hr/week ( 8 hr/day for 5 days )   For work over 8 hr/day or weekends, the Base Rate is multiplied by   Average wage rate considers straight time and overtime = base rate * ( * overtime hours) (Actual Hours Worked per Week) © Prof Awad S. Hanna9 Ⓒ

Worker's Compensation Insurance   Insurance paid by employers   Covers employees in accidents or death caused by work   Premium rate is specified in $s per $100 of Base Wage   Discounts are given depending on company's records in enforcing Safety Programs ( Experience Modification Rate, EMR )   EMR can be > 1, With bad safety and accident records © Prof Awad S. Hanna10 Ⓒ

© Prof Awad S. Hanna11 Ⓒ

© Prof Awad S. Hanna12 Ⓒ

© Prof Awad S. Hanna13 Ⓒ

Federal Insurance Contribution Act -FICA (Social Security)   Federal Government requires employers to be taxed for providing retirement benefits for employees.   The rate = 6.2% of Total Earnings (Avg. Wage) up to $106,800/year of employee wage.   The employee contributes an equal amount through the employer. © Prof Awad S. Hanna14 Ⓒ

Unemployment Compensation Tax/Insurance   A tax collected by the State to provide unemployment insurance.   Paid by employers   Approximately 3% of Total Earnings (Avg. Wage) of the employees © Prof Awad S. Hanna15 Ⓒ

Public Liability and Property Damage Insurance (PL&PD)   An insurance protecting the contractor from liabilities involving damage to a third party or public property, caused by contractor's employee during construction.   Premium is specified in $$ per $100 of Base Wage. © Prof Awad S. Hanna16 Ⓒ

Fringe Benefits   Employers often pay benefits in the form of:   Paid Vacations   Pension Plans   Training Programs, etc.   Others   Rate Ranges From 0.75 to 2.1 $/hr © Prof Awad S. Hanna17 Ⓒ

© Prof Awad S. Hanna18 Union Labor Rates   Means Labor Rates for the construction industry   Provides annual hourly union wages for 46 building construction trades in major U.S. and Canadian cities.   The Richardson Report   Provides quarterly union wages for 16 crafts in 120 U.S. and Canadian cities.   The Construction Labor Research Council (CLRC)   Provides construction union labor cost for 17 crafts in 300 cities (average of 3000 projects). Ⓒ

© Prof Awad S. Hanna19 Sources for Non-Union Labor Costs   Means Open Shop Building Construction Labor Costs, R.S. Means   Employment and Earning, Bureau of Labor Statistics (website: Ⓒ

© Prof Awad S. Hanna20 Equipment Costs and Sources of Equipment Cost   Two types of equipment costs: Purchased or owned equipment Rented equipment Ⓒ

Purchased Equipment   A contractor does not pay for construction equipment, the equipment must pay for itself.   Estimate must include all costs of owning and operating equipment which includes: 1.Depreciation (function of purchase price, salvage price and time) 2.Investment (function of interest, insurance, taxes, and storage) 3.Maintenance and Repair (function of condition of use) 4.Fuel, Oil, and Lubrication (function of site efficiency and operating conditions) © Prof Awad S. Hanna21 Ⓒ

© Prof Awad S. Hanna22 Rented Equipment   Equipment is most commonly rented if only for one-time or short-term use, such as a crane.   Must evaluate pros and cons of renting versus purchasing.   Purchasing equipment may not be financially feasible for small companies with only a few jobs each year.

© Prof Awad S. Hanna23 Sources of Equipment Costs   Cost Reference Guide for Construction Equipment, Dataquest Inc.   Provide hourly ownership and operating costs   Rental Rates Blue Book (more info at   Local rental agency data Ⓒ

© Prof Awad S. Hanna24 5. Define the Work Done by Others   Specialized work   Geographic location   Reduction of risks Ⓒ

© Prof Awad S. Hanna25 Indirect Job Labor Project manager and/or Superintendent Project engineer Draftsman Timekeeper Office manager and/or secretary Safety engineer and/or first aid attendant Watchmen Indirect Job Equipment Project manager’s vehicle Pickup truck Site maintenance Site Facilities Construction Sign Job site fence Construction access/entrance Portable toilets Office trailers: contractor’s, engineer’s, first aid, change room and lockers Telephone service Temporary electric utilities Shop or maintenance facility Fuel for general job vehicles Materials Handling and Storage Material storage area & bins Warehouse facility Subcontracted Indirect Cost Disposal services Soil or rock borings Laboratory tests –Soil samples –Rock samples –Concrete samples Surveying service CPM scheduling services Job photographs Models Artist renderings Bonds and Insurance Performance bond Builders rick Insurance Contractor’s liability insurance Permits Building Site improvement Road or entrance Additions for Remote Sites Communications Living quarters for workmen Kitchen and food service Entertainment Transportation Temporary power Water supply Waste disposal 6. Determine Job Overhead Cost Ⓒ

© Prof Awad S. Hanna26 7. Determination of Markup   Markup is an allowance for: a. Home Office overhead b. Contingency (mistakes, differing conditions, design errors, etc.) c. Profit (1% - 10%)   Markup range from 5% to 20% of the total project costs   Overhead is normally 10%   Profit is normally 5% Ⓒ

© Prof Awad S. Hanna27 a. Home Office Overhead Salaries Executive staff marketing staff Accounting staff Estimating staff Legal staff Support staff: clerical, data processing, etc. Facilities Office purchase or rental Furniture purchase or rental Data processing equipment Utilities Telephone, fax, etc. Heating & air conditioning Illumination Water Taxes Company Income Property Insurance Company policies not chargeable to projects Benefits Pension & retirement program Profit sharing & bonus plans Health insurance plan Transportation Company aircraft Company automobiles Company trucks Commercial travel Marketing Advertising Estimating Other promotional costs Maintenance Maintenance & overhaul, not just chargeable Ⓒ

© Prof Awad S. Hanna28 b. Contingency   To cover unexpected risk, error and omission, and contract risk Ⓒ

© Prof Awad S. Hanna29 c. Profit   Profit varies from 1% to 10% or more   Factors affecting profit   Need for work   Contract type   Total bid value   Risk   Competition   Economic Conditions Ⓒ

© Prof Awad S. Hanna30 8. Determination of Contract Bond Cost   The contract document usually requires as a minimum a “performance bond” and a “payment bond.”   Bond cost ranges from 0.5 % to 1% of the total contract price. Ⓒ

© Prof Awad S. Hanna31   Assumptions 1. Sales Tax = 6% of Direct Material Costs 2. Job Overhead Labor Costs = 25% of Direct Labor Costs 3. Job Overhead Management Costs = 10% of Direct Labor Costs 4. Markup = 20% of Total Project Costs Office O.H.= 10% Contingency= 2% Profit= 8% 5. Bond = 0.5% of 1% of Total Project Costs Ⓒ Example of Determining Total Contract Price

© Prof Awad S. Hanna32   Estimated Directed Job Costs 1. Direct Labor Costs25, Direct Material Costs 15, Direct Equipment Costs 13,000 (Owning & Operating Costs) 4. Subcontract Costs 20, DIRECT COST SUBTOTAL$73,670 Ⓒ Example of Determining Total Contract Price (Cont.)

© Prof Awad S. Hanna33   Job Overhead Costs 6. Sales Tax [6% of (2)]$ Job O.H. Labor [25% of (1)] $6, Job O.H. Management [10% of (1)]$2, Total Job Overhead Costs $9, Total Estimated Job Costs [(5) + (9)] $83, Markup [20% of (10)]$16, Cost Subtotal$100, Bond [0.005 x (12)]$ TOTAL CONTRACT COST [(12) + (13)]$100,767 Example of Determining Total Contract Price (Cont.)

© Prof Awad S. Hanna34 Bid Factor = DIRECT COST SUBTOTAL TOTAL CONTRACT COST 73, ,767 ==1.368(=37%) Ⓒ  Reflects the amount of OH&P, bonding, etc. that makes a up a contractor’s bid price  Usually expressed as a percent Example of Determining Total Contract Price (Cont.)

LaborMaterialEquipmentSubcontract Company Overhead Contingency Direct Costs Job Overhead Bonding Mark up Profit Prof Awad S. Hanna 35 Ⓒ Total Components of Cost within a Bid