Getting the Staff You Need to Get the Job Done 2001 APWA Congress
Capital Improvement Program Maintenance Management System Staffing Model
Maintenance Management System $1.9 billion
Maintenance Management System 1. Inventory Assets –curb-miles of streets, number of street trees, number of fire hydrants 2. Quantify Service Frequency –sweep streets 2x/month 3. Calculate Annual Work Plan by Task –200 curb-miles x 24 cycles = 4800 curb- miles/yr
4. Determine Daily Productivity –60 curb-miles/day 5. Calculate Annual Effort –4800 60 = 80 person-days 6. Summarize Tasks to Yield Total Annual Work Plan –10,000 person-days Maintenance Management System
Staffing Model Version 1 - Administration Work Plan 1. Inventory Administrative Work Load –Council meetings, commission meetings, reports, requests for information, requests for service 2. Quantify Service Frequency –History of previous requests, weather- related events, management budget preparation, personnel, administration, meetings, meetings, and more meetings.
3. Calculate Annual Work Plan 4. Determine Daily Productivity and Meetings 5. Calculate Annual Effort 6. Summarize Tasks to Yield Total Annual Work Plan 7. Develop Organization Chart
Staffing Model Engineering Work Plan 1. Inventory Engineering Work Load –Development: maps, plans, agreements, consultations –Master Planning: water, sanitary, sewer, refuse, roads –Right-of-Way: permits, franchises, fees –Capital Projects: development, administration, project management
2. Quantify Services and Revenues 3. Annual Work Plan 4. Determine Annual Cost 5. Calculate Annual Effort by Functional Group 6. Summarize Tasks into Annual Engineering Work Plan 7. Develop Organization Chart
Staffing Model Version 1 - Outcome Before Computerized Model Staff
Before Computerized Model Capital Projects $4K $1.2M Maintenance 1.2M 4K 20% increase Staffing Model Outcome
Staffing Model Analysis Lessons Learned 1. Rational process yields rational results. 2. Impressive presentation inspired confidence. 3. Feedback improves accuracy over time. Issue BIN 1. Are resources efficiently used? 2. Is the personnel mix appropriate?
Staffing Model Version 2 “ T heories are great, they sound great, but the minute you are asked to prove one in actual life, why the thing blows up.” --Will Rogers
Staffing Model Version 2 - Development Services The “Dice Table” theory of budgeting versus Fund Accounting
Customer Service Legal Physical Technical Timely Financial Competence Competition 135 Quality Timeliness Cost Satisfaction Cost of Service City A City B City C ________ Average
Development Services Revenue and Income Accounting Revenue Recognized when Received Balanced Budget Justification for Staff Resources
Income Recognized when earned Monitor Budget versus Actual Track by Task, Project, Year Staff % 1 _______ 2 _______ 3 _______ 4 _______ Total Cost Add Non-personnel Divide by Units = Cost / Task Tract 1000 Plan check ____ Inspection ____ Testing _______ Total _________ Revenue ______ By TaskBy ProjectBy Year
Development Services Expense Limited to Revenue + Carry-over Efficiently Performed Balanced to Total Income
Development Services Goal: Ensure that private development contributes to citizen safety and welfare Performance Measures Cost% cost recovery Accuracy% of plans with a (peer review) of consistency and completeness of review of good or excellent Timeliness% of service requests responded to within pre-established or committed turn-around times. Quality% of customers rating services (cost, cycle time) as good or excellent
Development Services Review Team City Engineer RCE Engineer Sr. Technician Technician
Enterprises (Utilities, Assessment Districts, Grants) “Anyone who doesn’t run government like a business has no business running government.” --Former Mayor, Visalia, CA Cost Recovery Competitive Rates Excellent Customer Service
Capital Projects “No bucks, No Buck Rogers.” --John Glenn, The Right Stuff
Capital Projects
Capital Projects Version 1 Total Staff Costs$1,250,000 Average Cost / Person 125,000 # Persons Needed 10 Easily explained Easily used
Capital Projects Version 1 Project Cost Basis 1. Straight % e.g.Project Management= 8% Design=15% Construction Management=10% Total33%
2. Straight % + Flat Rate /Project e.g.Project Development= $10,000 Preliminary Engineering= 6% Design= 15% Construction Management= 10% Total 31% + $10K Capital Projects Version 1 Project Cost Basis
3. Industry Standard % Construction Cost $10K$100K$1M$10M Capital Projects Version 1 Project Cost Basis
Capital Projects Version 1 4. Empirically Developed $500,000 - $1 million Get details from Eileen
Capital Projects Version 2 Total Project Management$300K for Transportation Composite Project Manager % DPW 2 City Engr 3 Sr. Engr.10 Assoc Engr.35 Engr I15 Techs15 Analyst10 Clerical10 100
Capital Projects Version 2 Multiply % x Total Work = Support by Position e.g. Engineer I 15% x 300K = $45 K If fully loaded, cost of an Associate Engineer is $90K; Transportation Section of CIP requires 0.5 Associate Engineer.
Transportation.5 Sanitary Sewer.3 Storm Drainage.2 Water System.1 Municipal Buildings.6 Parks & Rec FTE’s Repeat process for all CIP Sections for Project Management. Assoc. Engr.
Director.32 City Engineer.40 Senior Engineer 1.25 Associate Engineer 2.55 Engineer I.67 Tech.67 Analyst.48 Clerical.48 Repeat process for all positions.
Develop a Profile for a Composite Designer e.g. % City Engineer 4 Senior Engineer11 Associate Engineer15 Engr. I25 Techs35 Analyst 5 Clerical 5 Total 100
Summarize Design Staff Needs Calculate Design (FTE’s) for each CIP Section and summarize for all positions. e.g. Associate Engineers 1.7 FTE’s
Develop a Profile for a Composite Inspector % City Engineer 1 Senior Engineer 1 Associate Engineer 3 Engr I10 Inspector75 Analyst 3 Clerical 7 Total 100
Summarize Staff Needs by Function DPW City Engr Sr. Engr Assoc. Engr Engr. I Techs Inspector Analyst Clerical ProjectConstruction MgmtDesign MgmtTotal FTE’s
Summarize Staff All Functions DPW City Eng Sr. Engr. Assoc. Engr. Clerical Admin Utilities Development CIP Total
Adjust Needs to Resources City Engineer Need 1.40 Resource 1.00 Refinement Possibilities Substitute with subordinate Revise schedule Substitute with consultant Add/reduce staff Substitute with supervisor Fail to delivery / exceed budget