MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.

Slides:



Advertisements
Similar presentations
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Advertisements

S. C. Stormwater Management and Sediment Reduction Regulations Dwayne E. Creel, P.E. Manager, SCDHEC Stormwater, Agricultural and Dams and Reservoir Safety.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Dewatering & Coastal Issues H 2 0 & Erosion Control Workshop UCF Stormwater Management Academy March 15-16, 2007 Jim Smoot, PhD, PE Molly Wood, PE U.S.
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Land Use Program Septic System Overview Scott Weldon
1 Effluent Guidelines for Construction Greg Davis USEPA
What is NPDES? “National Pollutant Discharge Elimination System”
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Connecticut Department of Energy and Environmental Protection.
GROUNDWATER CONTROL.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Georgetown County Stormwater Utility Chris Laude – County Engineer Zollie Green – Senior Engineer Chris Allen – Inspector Shelly Jordan – Quality/Billing.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Low Impact Development Best Management Practices
Env 247 Overview of Stormwater Management March 1, 2011.
Managing the Environmental & Project Development Process StormwaterManagement.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Design of Infiltration Practices
About Engineering Control Corp (ECC) provides construction design, support services and engineering controls to mitigate.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Developing Green Stormwater Design Solutions For UIC Compliance Presented by: Adam Zucker PE, CWRE 819 SE Morrison Street ● Suite 310 ● Portland, Oregon.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Cedar Ridge Estates Green View Realty LLC Is Pleased to Present: Application for Comprehensive Permit 40B Residential Development.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Miami. Miami: Climate Miami’s client is similar to Houston in several ways. It has one of the highest levels of rainfall of any major U.S. city. It receives.
An Overview of our Community’s Stormwater Management Program
Board of County Commissioners PUBLIC HEARING November 9, 2010.
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Septic System Overview
Sandra Blick / Meeta Trivedi Hydrology & Hydraulic Unit – NJDOT BLAES
Preventing and Reducing Pollution From MS4 Activities
New Jersey Department of Environmental Protection
Municipal Separate Storm Sewer System (MS4) Permit
What is an on-lot sewage system?
Storm Water Storage and Treatment
EPA Public Meeting Dallas, Texas May 10, 2005
Stormwater Pollution Prevention Plans
What is a rain garden? This presentation is designed to introduce the importance of rain gardens and explain how rain gardens function. Notes are included.
What to Expect When You’re Inspected
Cedar Ridge Estates Application for Comprehensive Permit
MS4 = Municipal Separated Storm Sewer System
Presentation transcript:

MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER VIA INJECTION WELL AND DEWATERING”

STORMWATER AND DEWATERING OVERVIEW Part I STORMWATER DRAINAGE WELL PURPOSE CONDITIONS WHERE STORMWATER DRAINAGE WELL APPLIES PERMITTING PROCESS PHASE I REQUIREMENTS DESIGN CRITERIA PHASE II REQUIREMENTS

STORMWATER AND DEWATERING OVERVIEW PART II DEWATERING DEFINITION DEWATERING METHODS 1. OPEN EXCAVATION 2. WELL POINT SYSTEM THE USAGE OF STORM WATER WELL IN DEWATERING PROCESS IS PERMITTED OR EXEMPTED BY DEP

PART I STORMWATER DRAINAGE WELL

PURPOSE DRAINAGE WELL IS APPLICABLE ONLY EAST OF THE SALT INTRUDED LINE (1000 mg/L CHLORIDE LINE) DRAINAGE WELL IS USED PRIMARILY IN COASTAL AREAS WHERE SEEPAGE OR TRANSMISSIVITY IS OFTEN NON-EXISTENT OR THE REQUIRED AMOUNT OF EXFILTRATION TRENCH WILL NOT FIT INTO THE PROJECT AREA

SALT WATER INTRUSION LINE MAP

MIAMI-DADE COUNTY STORMWATER DRAINAGE WELL REVIEW REQUIREMENTS THE DRAINAGE WELL APPROVAL CONSIST OF (2) TWO PHASES

PHASE I REQUIREMENTS SUBMIT A STORMWATER DRAINAGE WELL REVIEW APPLICATION FORM & FEE $210.00

PHASE I REQUIREMENTS 3 SETS OF SIGN AND SEALED PAVING AND DRAINAGE PLANS 1 COPY OF SIGN AND SEALED DRAINAGE CALCULATION 1 COPY OF PROOF OF OWNERSHIP 1 COPY OF PLUMBING PLAN

DESIGN CRITERIA CLASS V INJECTION WELL (STORMWATER DRAINAGE WELL ) REQUIRING WATER QUALITY ANALYSES TO BE PERFORMED SHALL BE IN ACCORDANCE WITH MIAMI-DADE COUNTY CRITERIA

MIAMI-DADE COUNTY DESIGN CRITERIA DRAINAGE CALCULATIONS MUST DEMONSTRATE THE RETENTION OF 5 YEAR- 1 DAY STORM EVENT. PROVIDE WATER QUALITY PRE-TREATMENT PRIOR TO DISCHARGE INTO THE WELL. IN LIEU OF WATER QUALITY TREATMENT PROVIDE POLLUTION CONTROL BOX SIZED BASED ON 90 SECONDS DETENTION TIME

MIAMI-DADE COUNTY DESIGN CRITERIA All INTERIOR DRAINS OF PARKING GARAGE AND PLANTER DRAINS ARE SEPARATED FROM THE STORMWATER DRAINAGE WELL SYSTEM AND ARE ROUTED INTO A SPECIAL FRENCH DRAIN WITH 2 FEET SAND FILTER BELOW THE PIPE INVERT. A COPY OF THE PLUMBING PLAN MUST BE SUBMITTED FOR VERIFICATION BY DERM OF AN EFFECTIVE SEPARATION.

SPECIAL FRENCH DRAIN DIAGRAM

CALCULATION OF THE REQUIRED 90 SECONDS DETENTION CALCULATE RUNOFF BASED ON THE RATIONAL FORMULA Q= CIA REQUIRED = Q x 90 SECONDS VOLUME REQUIRED ≤ VOLUME OF BOX

DERM APPROVAL STAMP

PHASE II REQUIREMENTS THE PROPOSED SITE MUST HAVE COMPLETED PHASE I REQUIREMENTS AND COMPLIES WITH MIAMI DADE COUNTY CRITERIA. 3 COPIES OF FDEP CLASS V CONSTRUCTION AND OPERATION CLEARANCE PERMIT APPLICATION FORM. FEE $200 PER WELL

PART II DEWATERING SITE

DEWATERING DEWATERING SHALL MEAN TO DISCHARGE OFF- SITE OR ON-SITE WATER FROM AN EXCAVATION DURING CONSTRUCTION OR EXISTING STRUCTURE FOR MAINTENANCE AND REPAIR OF UNDERGROUND UTILITIES DEWATERING CAN BE MADE BY WELL POINT SYSTEM OR OPEN EXCAVATION PUMPING

DEWATERING METHODS OPEN EXCAVATION OPEN DEWATERING SYSTEMS ENABLE ONE TO LOWER THE GROUND WATER TABLE ADEQUATELY IN COHESIVE LOW PERMEABLE SOILS. WATER IS PUMPED OFF DIRECTLY FROM SUMPS ALONG THE TOES OF THE SLOPES OF THE EXCAVATION WORKS.

OPEN EXCAVATION DEWATERING SYSTEM

DEWATERING METHODS WELL-POINT SYSTEM WELL-POINT DEWATERING SYSTEMS ENABLE TO LOWER THE GROUND WATER TABLE ADEQUATELY FOR DEEP AND LARGE CONSTRUCTION SITES. THIS DEWATERING SYSTEM IS USED IN ALL TYPES OF GROUND WHICH ARE PERMEABLE.

WELL-POINT DEWATERING SYSTEM

DEWATERING POINT OF DISCHARGE OPEN EXCAVATION DEWATERING 1. HOLE TO HOLE DISCHARGE 2. DISCHARGE TO TEMPORARY OR PERMANENT DRAINAGE SYSTEM(exfiltration trench, outfall, or drainage well) WELL POINT SYSTEM 1. DISCHARGE TO TEMPORARY OR PERMANENT DRAINAGE SYSTEM 2. DISCHARGE OFF SITE

CALCULATION OF THE REQUIRED DEWATERING OPEN HOLE DEWATERING 1. CONE OF INFLUENCE FROM DEWATERING 2. SETTLING VELOCITY IN SEDIMENTATION TANK 3. DISCHARGE CAPACITY OF EXFILTRATION TRENCH OR DRAINAGE WELL WELL POINT SYSTEM 1. CONE OF INFLUENCE FROM DEWATERING 2. DISCHARGE CAPACITY OF DRAINAGE SYSTEM

CONE OF INFLUENCE

THE USAGE OF STORMWATER DRAINAGE WELL IN A DEWATERING PROCESS STORMWATER INJECTION WELL IS USED FOR TEMPORARY DEWATERING DISCHARGE DURING CONSTRUCTION IN CASES WHERE OFF-SITE DISCHARGE IS NOT ALLOWED OR SITE HAS SHALLOW CONTAMINATION PLUME

MIAMI-DADE COUNTY DEWATERING REQUIREMENTS TO DISPOSE INTO A STORMWATER INJECTION WELL THE PROPOSED SITE IS NOT CONTAMINATED IF THE SITE IS CONTAMINATEDOR WITHIN 500 FEET MUST OBTAIN POLLUTION REMEDIATION SECTION APPROVAL. FDEP APPROVAL IS REQUIRED CALCULATION MUST DEMONSTRATE THAT THE STORWATER INJECTION WELL IS CAPABLE TO HANDLE THE DEWATERING DISCHARGE CALCULATIONS TO REDUCE TURBIDITY DISCHARGE INTO THE WELL

WHY DO RER DERM AND FDEP REGULATE STORM WATER WELL? STORM WATER WELL IS A CONCERN BECAUSE IT MAY CONTAIN THE FOLLOWING: SEDIMENT NUTRIENTS METALS MICROORGANISMS FERTILIZERS PESTICIDES

CONCLUSION MIAMI DADE COUNTY RER DERM AND FDEP PERMITTING PROCESS TO DISPOSE OF STORM WATER VIA INJECTION WELLS IS TO ASSURE THE PROTECTION OF GROUNDWATER RESOURCE FROM CONTAMINATION