MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT MICE-US Experimental Contributions Daniel M. Kaplan Aug. 13, 2014.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Printed by MICE is a Muon Ionization Cooling Experiment running at the Rutherford-Appleton Laboratory, Chilton UK. Cooled muon beams.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
1 Project Management Web Tools at the MICE Experiment Linda R. Coney – UC Riverside CHEP – May 2012.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
Report on the Analysis Group & Plans V. Blackmore MICE VC 163 Thursday, 12 th December /11.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
The MICE demonstration of ionization cooling J. Pasternak #, V. Blackmore, C. Hunt, J-B. Lagrange, K. Long, Imperial College, London, UK Alain Blondel,
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
A NALYSIS OVERVIEW & “T HE M ISSING P HYSICS ” V. Blackmore CM38 23rd February /14.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Bright muon sources Pavel Snopok Illinois Institute of Technology and Fermilab August 29, 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MAP 2014 Spring Meeting (FNAL, 27–31 May 2014) | D. M. Kaplan, IIT MICE Experiment Daniel M. Kaplan May 28, 2014.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Experimental Tests of Cooling: Expectations and Additional Needs
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
The Muon Ionization Cooling Experiment: Controls and Monitoring
Controls & Monitoring in MICE
The Detector System of the MICE Experiment
Presentation transcript:

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT MICE-US Experimental Contributions Daniel M. Kaplan Aug. 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Outline MICE Measurements Schedule Personnel & Activities Conclusions 2 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Demonstrating Ionization Cooling Recall cooling principle: good cooling requires –Low-Z absorber –Low β ⊥ at absorber Achievable via high magnetic field or field gradient Canonical angular momentum cancellation requires at least occasional field flips –Plan to measure emittance change vs input emittance, momentum, and β ⊥ in both flip & non-flip (“solenoid”) approaches ≈ 3 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Emittance Measurement Approach: Measure each muon precisely, both before and after cooling cell Off-line, form “virtual bunch” & compute emittances in and out August 13, plane SciFi Tracker as built (eff. diameter 1.5 mm) 1.5 mm/√12 Helical path of muon µm fibers ganged into each readout channel

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Measurements to be Made Emittance-momentum matrix: Plan: study these 9 emittance-momentum cases, in both flip and non-flip modes, with multiple absorber materials and focusing strengths (ß) –need ~10 5 muons for each case ⇒ ≈ 3 ISIS user periods cooling heating equilibrium emittance 5 August 13, 2014 BzBz ß pzpz ε⊥ε⊥ Cooling vs. input emittance (200 MeV/c): Flip mode, 6-200: Solenoid mode

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT August 13, User periodStart DateEnd dateDuration (days) 117/3/201524/4/ /6/201524/7/ /9/201516/10/ /11/201518/12/ (From Steve Boyd, U Warwick, MICE Operations Coordinator) Step IV Run Planning ISIS 2015 run plan (tentative): Various scenarios possible, depending on how the commissioning goes

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Run Plan : 2015 One scenario: August 13, ~Fully uses available time in 2015 (with some buffer)

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Run Plan : 2015 One scenario: August 13, ~Fully uses available time in 2015 (with some buffer) Alternate assuming polarity switch between user runs 1 st 2016 run also usable if necessary

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Longer-Term Schedule 9 August 13, 2014 MilestoneDates (Est.) 1 st demo of emittance reduction (Step IV)8/15 – 4/16 1 st demo of sustainable cooling (Step V)2/18 –

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Who Does What 10 International responsibilities: August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT US MICE Contributions US-built magnets: –Spectrometer Solenoids (SS) –Coupling Coil Solenoid (CC) US-built components & systems: –RF cavities, modules, ancillary hardware, & MTA prototype tests (DOE, NSF MRI) –All Tracker SciFi planes (DOE, NSF MRI) –SciFi Tracker readout system (DOE, NSF MRI) –EMR scintillator (DOE) –Ckov PID detectors (NSF MRI) –LH 2 absorber windows (DOE) –Solid absorbers (DOE) –Partial Return Yoke (PRY) (DOE) Cooling-channel optics design (R. Palmer et al.) (DOE) Software management –Controls & Monitoring –Offline 11 DOE } SSU (US) SSD (US) RFCC (US) DOE } Step IV PRY 1st MICE RF MTA LiH Disk Absorber August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Tracker DAQ Support (D. Adey) SS Tracker support frames Scintillating fibers 12 August 13, 2014 Tracker DAQ is a complex system 8k SciFi readout channels instrumented with cryogenic, VLPC photodetectors, needing temp. control to 9.0±0.05 K –Readout via DØ AFE-IIt modules, each controlled by 3 FPGAs Built originally as DØ spares, tested with IIT MICE help (NSF MRI) Need periodic testing, maintenance, and calibration –Its support is a US responsibility within MICE Status: Developed & tested Tracker installation into Spectrometer Solenoid

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Controls & Monitoring (P. Hanlet) August 13, C&M for small, simple devices (e.g., HV supplies) conceptually straightforward (though nontrivial in practice) Complex devices (e.g., superconducting magnets, LH 2 absorbers) call for more-complex “state machine” control –Ensure their operating parameters stay within desired limits –Appropriately handle possible error conditions Note: safety issues handled by separate PLC interlock system –C&M system intended only to ensure MICE operates as intended –Should Control, Monitor, log values, and sensibly handle off-normal values We use EPICS to standardize control of heterogeneous hardware from many groups

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Controls & Monitoring Run Control –MICE has many devices and subsystems that need to be in correct states in order to start and stop useful runs –To make shift-taking more straightforward, and reduce chances of operator error, these sequences should be automated & integrated –Job of MICE RunControl is to accomplish this task Integrates control of: –DAQ, Target, NC beamline, SC magnets, Tracker, absorbers, and (to do): Diffuser, (Step V) RF August 13,

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT C&M Status Simple systems (≈ done): –Environmental monitoring (temps., humidity, radiation levels) –HV supplies new crate still in progress –Proton absorber –Diffuser State machines: –Done: Spectrometer Solenoids –In progress: Focus Coil, Decay Solenoid Absorber, conventional magnets, Target, Trackers (big job) –Future: CCM, RF RunControl: –Almost ready for Step IV Actively managed by MEMO –Activities on target for start of Step IV operations August 13,

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT UPSTREAMDOWNSTREAM “Offline” Software (D. Rajaram) MAUS (MICE Analysis User System) software used both for offline analysis and simulation and for online analysis –Provides a unified, self-consistent, traceable framework for “everything we do” with MICE data Current status: with standard code from MAUS repository, –Can reconstruct data from every detector –Can simulate TOF, KL, and Tracker EMR and Ckov codes: integration in progress –Global track reconstruction: in development “Marrying” reconstructed tracks up- & downstream with particle ID US responsibilities: –Oversee, organize, and manage the international effort –Integrate Ckov software Actively managed by MEMO –Activities on target for start of Step IV operations August 13,

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Who Does What (US, current) Fermilab: D. Adey, A. Bross, S. Feher, M. Leonova, M. Popovic –Tracker –Beamline, magnets, & RFCC BNL: R. Palmer, H. Witte –Lattice design –Partial Return Yoke LBNL: D. Li, T. Luo, M. Zisman –Magnets –RF UC Riverside: G. Hanson, C. Heidt –Tracker software & Monte Carlo –Controls & Monitoring software IIT: M. Drews, P. Hanlet, D. Kaplan, D. Rajaram, P. Snopok, Y. Torun, M. Winter –Experiment integration –Controls & Monitoring software –Offline software U Miss: L. Cremaldi, D. Sanders, D. Summers –Ckov detectors & analysis –RF –Absorber windows (both DOE - & NSF-supported) WhoMICE Admin. RoleC’tee A. BrossDep. Spokes.Exec. & Tech. Bds. P. HanletExpt. Integr. Scientist C&M Leader Tech. Bd. D. KaplanUS Rep.Exec. & Edit. Bds. D. RajaramOffline Software Head Color code: Faculty Research Faculty Scientist Postdoc Grad student Undergrad 17 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Budget Overview DOE/MAP currently supports Fermilab, BNL, LBNL groups & key personnel, including –Alan Bross, Fermilab: Deputy Spokesperson & Construction L1 Manager –Pierrick Hanlet, IIT: Expt Integration Scientist / Controls & Monitoring Head –Daniel Kaplan, MICE L2 Manager (partial release time) –Durga Rajaram, IIT: Offline Software Head Partial support for IIT/FNAL joint faculty –Pavel Snopok, Yagmur Torun Including corresponding travel and Common Fund contributions Plan: augment MICE Step IV operations & analysis with some effort from MICE construction and ionization cooling simulations efforts 18 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT MICE Completion Scenario Proposed MAP ramp-down: –Funds experiment operations through Step IV running and Step V component delivery Step IV running will demonstrate readiness for Step V of much of DAQ, C&M, and RunControl systems –All but RF (and its possible DAQ & Tracker impacts) US participation in Step V exploitation: –Will depend on GARD (and/or NSF) support –Note: MICE exploitation funding in place in UK, CH, Italy –Expected to continue through Step V exploitation EuCARD-2 “trans-national access” grants for work at RAL on MICE by EU collaborators –Strong statement of support from EuCARD SAC for MICE exploitation through Step V –We seek corresponding commitment in US 19 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Conclusions MICE aims to demonstrate the principles of sustainable ionization cooling …and thus lay the groundwork for neutrino factories (as well as muon colliders and low-energy cooled muon sources) …by ≈ 2018 Experimental support in the proposed plan… –Will enable us to successfully acquire Step IV data –Will provide support for key US experimental responsibilities Tracker & PID detector & DAQ support Step IV software and C&M readiness –Will provide for the transfer of Step IV results into the code framework required to simulate cold muon source capabilities Step IV operations form the foundation for the Step V cooling demonstration 20 August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT Comment from IB The present request for DOE support focuses on Step IV experimental readiness – limited funding to exploit the experiment is unfortunate given the scope of the US contributions Furthermore this proposal does not provide support beyond the commissioning of Step V Highly desirable to obtain GARD and NSF support for Step V as well –In discussions with the agencies, the possibility of submitting proposals for this purpose was raised –Both NSF (Gonzalez) and DOE (Siegrist & Procario) have indicated willingness to consider these when the time comes August 13,

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT MICE Papers 2 comprehensive MICE Step I papers, one recent: 1.D. Adams et al., “Characterisation of the muon beams for the Muon Ionisation Cooling Experiment,” Eur. Phys. J. C73 (2013) M. Bogomilov et al., “The MICE Muon Beam on ISIS and the beam-line instrumentation of the Muon Ionization Cooling Experiment,” JINST 7 (2012) P more in progress: 1.“Measurement of the pion contamination in the MICE beam” Plus recent technical or conference papers August 13, 2014

MAP DOE Review (BNL, 12–14 Aug. 2014) | D. M. Kaplan, IIT More (Recent) MICE Papers 1.The Status of the Construction of MICE Step IV –P. Snopok, E. Overton –Proc. IPAC 2014, Dresden, Germany, TUPME011 2.Progress Towards Completion of the MICE Demonstration of Muon Ionization Cooling –A. Dobbs, D.M. Kaplan, P. Snopok –Proc. IPAC 2014, Dresden, Germany, THPRI030 3.Tuner System Simulation and Tests for the 201-MHz MICE Cavity –L. Somaschini et al. –Proc. IPAC 2014, Dresden, Germany, THPRI070 4.The detector system of the Muon Ionization Cooling Experiment (MICE) experiment –M. Bonesini,, for the MICE Collaboration –PoS EPS-HEP2013 (2014) Progress towards completion of the MICE demonstration of ionisation cooling of muons –Y.I. Karadzhov, for the MICE Collaboration –PoS EPS-HEP2013 (2014) Progress Towards Completion of the MICE Demonstration of Muon Ionization Cooling –D.M. Kaplan, for the MICE Collaboration –NuFact2013, e-Print: arXiv: [physics.acc-ph] 7.A totally active scintillator calorimeter for the Muon Ionization Cooling Experiment (MICE). Design and construction –R. Asfandiyarov, for the MICE Collaboration –Nucl.Instrum.Meth. A732 (2013) MICE Spectrometer Solenoid Magnetic Field Measurements –M. Leonova –Proc. IPAC'13, Shanghai, China, 2013, TUPFI054 9.The RF System for the MICE Experiment –K. Ronald et al. –Proc. IPAC'13, Shanghai, China, 2013, WEPFI Muon Cooling, Muon Colliders, and the MICE Experiment –D.M. Kaplan, for the MICE Collaboration –Proc. COOL'13 Conference, Murren, Switzerland, MOAM2HA01 11.Tuner System Simulation and Tests for the 201-MHz MICE Cavity –L. Somaschini et al. –Proc. NA-PAC2013, Pasadena, CA, US, WEPMA03 12.Status of the Muon Ionization Cooling Experiment (MICE) –Y. Torun, M. Zisman –Proc. NA-PAC2013, Pasadena, CA USA, THPHO18 13.MICE Spectrometer Solenoid Magnetic Field Measurements –M. Leonova –Proc. NA-PAC2013, Pasadena, CA USA, THPHO15 14.State Machine Operation of the MICE Cooling Channel –P. Hanlet, for the MICE Collaboration –Proc. CHEP2013, Amsterdam, The Netherlands, J.Phys.Conf.Ser. 513 (2014) The MICE Run Control System –P. Hanlet, for the MICE Collaboration –Proc. CHEP2013, Amsterdam, The Netherlands, J.Phys.Conf.Ser. 513 (2014) The Reconstruction Software for the Muon Ionization Cooling Experiment Trackers –A. Dobbs, K. Long, E. Santos, D. Adey, P. Hanlet, C. Heidt –Proc. CHEP2013, Amsterdam, The Netherlands, J.Phys.Conf.Ser. 513 (2014) MICE data handling on the Grid –J. Martyniak, for the MICE Collaboration –Proc. CHEP2013, Amsterdam, The Netherlands, J.Phys.Conf.Ser. 513 (2014) August 13, 2014