Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.

Slides:



Advertisements
Similar presentations
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
4 Process Mapped and documented current conditions and trail use patterns Community outreach Seven initial public meetings were held at locations.
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Comparative Analysis Two Potential Sites for a New High School.
Shoreline Master Program Update. Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
BRUCE FREEMAN RAIL TRAIL ARTICLES 22, 23, & ANNUAL TOWN MEETING.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
City of Hillsdale & Hillsdale Township.  Location  Socioeconomic Summary  Population History & Projections  Age & Sex of the Population  Household.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY, PETALUMA, CA North Bay Watershed Association December 7, 2007.
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
NEW YORK CITY WETLANDS TRANSFER TASK FORCE Blue Heron Park, Staten Island Public Hearing June 7, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Department of Water Resources Urban Streams Restoration Program Working Together To: Restore Watersheds Reduce Property Damages Renovate Town Centers.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
Marin County Watershed Stewardship Plan
California Natural Resources Agency U.S. Army Corps of Engineers.
CITY COUNCIL WORKSHOP MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) DECEMBER 20, 2011.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
City Manager’s Office Approval of Public Monument Policy City Council August 31, 2015 Item 20.
Reclamation Bureau Interagency Forum Local Agency Planning Process City of Rancho Cordova December 6, 2007.
OFFICE OF PROGRAM POLICY ANALYSIS & GOVERNMENT ACCOUNTABILITY The Legislative Sunset Review Process Larry Novey Chief Legislative Analyst, OPPAGA The Florida.
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Chelan PUD Commission Update. Waterfront Planning Process.
Development Services Department Project Management Section Auburn Drive Tentative Map Appeal of the Planning Commission’s Decision Project No
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
The Community Preservation Act. Open Space Historic Preservation Affordable Housing Allows communities to establish a dedicated fund for: The Community.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
The Fish and Game Commission has designated the states portion of the South Bay Salt Ponds an Ecological Reserve. Planning for the management of Ecological.
Central Park MASTER PLAN UPDATE CITY COUNCIL / PARK & RECREATION COMMISSION MEETING JUNE 16, 2014.
Planning Commission Study Session: Preferred Plan July 23, 2015.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1.
Quick Facts – City of Auburn We are Working on It.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Downtown Stockton Marina & Joan Darrah Promenade July 29, 2008 Guaranteed Maximum Price for the Construction of the Downtown Marina and Joan Darrah Promenade.
Park Planning for the City of San Diego Robin Shifflet April 22, 2016 City of San Diego Planning Department.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Environmental Critical Areas Regulations
Concept Plan for Proposed Park Near Hopewell School
SEQRA as a Tool to Review Energy Projects
URBAN TRAIL PROJECT UPDATES
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department

More than two years were spent processing with the regulatory agencies listed below for Environmental Approvals associated with the Bon Air Bridge reconstruction. These regulatory agencies involved: Army Corps of Engineers Regional Water Quality Control Board US Dept of Fish & Wildlife CA Dept of Fish & Wildlife Bay Conservation & Development Commission No acceptable wetland restoration opportunities within the Corte Madera Creek watershed were identified What has directed the City to Commit restoring the Dog Park area to Wetland Habitat?

Area is identified as prime habitat area for Clapper Rail and Salt Water Marsh Mouse Meets the Mitigation criteria for the Bon Air Bridge and will also provide for required mitigation for the City Strom Drain Outfall Maintenance requirements Piper Park Master Plan identifies deficiencies in the existing Dog Park We have an Opportunity through the Bridge Grant to restore habitat and restore the Dog Park area to a Passive Use area, add interpretive signage and improve the Dog Park Why Move the Existing Dog Park?

Public Outreach and Input Workshops were held on August 8 & Sept 11 Website was developed Staff met, spoke and ed with numerous residents and users of the existing Dog Park Staff contacted and discussed the potential Dog Park relocation in Piper Park with other Piper Park users Presentations were made at public meetings, September 19 th Parks & Recreation Commission Meeting and at tonight’s Larkspur City Council Public Meeting

What considerations were made in choosing potential sites? Where does the City own property that could be used for a Dog Park? Size Conflicting Uses Parking & Accessibility Connectivity to trails/Public Walkways Environmental Constraints Where does the City own property that could be used for a Dog Park? Size Conflicting Uses Parking & Accessibility Connectivity to trails/Public Walkways Environmental Constraints What is the Public’s Input on the possible locations? Is there Shade & Water? Can the proposed site be reasonably maintained?

What sites were considered? The initial Workshop and outreach results encouraged Staff to discontinue efforts investigating Niven Park as an alternative and to further review Piper Park alternatives as well questioning “Is a Dog Park in Larkspur necessary?” The initial Workshop and outreach results encouraged Staff to discontinue efforts investigating Niven Park as an alternative and to further review Piper Park alternatives as well questioning “Is a Dog Park in Larkspur necessary?” Niven Park Piper Park North Piper Park South Niven Park Piper Park North Piper Park South

Genesis of the Canine Commons Dog Park 1970’s Awareness of the need for dog parks in communities Discussions for building a dog park in Larkspur 1990 Original dog park built at Piper Park 2006 Refurbishment of original dog park 2011 Piper Park Master Plan identifies continued interest for dog park and desire for improvements & expansion

Two Alternate Locations at Piper Park Existing Dog Park Proposed Site 1 Proposed Site 2

Proposed Site 1 North End of Piper Park Proposed Site 1 North End of Piper Park

Proposed Site 1 North End of Piper Park Proposed Site 1 North End of Piper Park Pros: Area is away from other uses Dog Users currently use this area to run their dogs Area can be configured to accommodate the Dog Park Cons: Area is frequented regularly by park visitors who enjoy the Marsh and serenity of the end of Piper Park Area is far from the parking area making it difficult for senior users Area is far from the restroom facility Location was not identified as the preferred alternative

Proposed Site 2 South End of Piper Park Proposed Site 2 South End of Piper Park

Pros: Area is near parking and easily accessible for seniors Area can be configured to accommodate the Dog Park Area is visible to Doherty Drive Area is rarely used by other park users Area is close to the restroom facility Location was preferred by multiple users of Piper Park Cons: Location is closer to multiple active areas Proposed Site 2 South End of Piper Park Proposed Site 2 South End of Piper Park

People are used to Piper Park as the Dog Park location The current Dog Park is hard to find and feels unsafe being hidden away from the main parking area Current Dog Park needs redesign Piper Park South Location is along Doherty Drive providing visibility Piper Park North location is very serene and many people enjoy the peacefulness of the area Piper Park South location does not have the serenity of the north location What considerations were made in choosing potential sites?

The restoration of the current Dog Park to Wetlands is beneficial to habitat and provides for a better passive space alternative to the Doherty frontage Many seniors use the existing Dog Park and the South location provides a better access for them, even better than the existing park location The Community supported relocation of the Dog Park verses elimination of the Dog Park Supporters of Passive Space in Piper Park expressed concern for passive space protection but also stated that the south location is not the best passive space in the park Parks & Recreation Commission recommended Piper Park South for the new Dog Park Location with the caveat that design criteria be reviewed by the Commission at a later date. Results from Community Outreach regarding Piper Park Alternatives

1) City Council directs Staff on proceeding with design and relocation of the Dog Park 2) Staff holds a Design Input Workshops for the Public and their Furry Friends to provide input on features for the new Dog Park 3) Staff completes design and permitting for the construction 4) Parks & Recreation Commission and City Council approve the design 5) Build it! Next Steps