Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Testbeam Planning 2008 JRA1 Meeting, Geneva May 21 st 2008 Ingrid-Maria Gregor DESY.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
Monolithic Active Pixel Sensors (MAPS) News from the MIMOSA serie Pierre Lutz (Saclay)
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
1 EUDET Report on Management & Summary toTransnational Access Felix Sefkow Extended Steering Committee Meeting August 31, 2010 Outline:  Management Summary.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
Phoneconf u-2010 June 5 th, 2009 Harold Linke / HITEC Luxembourg.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
A Year in the Life Of a State Data Coordinator December, 2013.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Planes, Telescope, System
DESY contributions to MAPS DESY testbeam
Mini-drawers, FE-ASIC , Integrator
NA61 news and plans News from other labs/experiments
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
3. Februar 2006 Tobias Haas DESY
Planning for the Demonstrator
Communications Share Point Collaborative WS:
Mimoroma2 MAPS chip: all NMOS on pixel sparsification architecture
Discussion group meeting
Potential Milestones A timeline to finish in one year
TSF Upgrade Project Overview Resources Plans and Timetable
Transmission Workgroup July 2012
Presentation transcript:

Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY

Ingrid-Maria Gregor, JRA1: Planning 2009 Planning 2009

Ingrid-Maria Gregor, JRA1: Planning 2009 Planning 2009

Ingrid-Maria Gregor, JRA1: Planning 2009 Detailed Planning (to be discussed)  Mimosa26  testing: first characterisation until end of April  Available for EUDET: one chip right away, three April 6 th  JRA1 Milestone: „chip available“ end of March can be fulfilled  EUDRB/DAQ  Start tests with chip asap  Test with 3 sensors in April (Ferrara) -> Geneva group will go there  Towards Full Telescope  Move Demonstrator to CERN around June  Get it ready for data taking  Put 3 Mimosa26 in MaserBoxTelescope and put into DUT slot  Run 3 Mimosa26 and eventully together with 3 MimoTel/Mimosa18  Have Demonstrator ready for users mid July  Upgrade to full Mimosa26 system after user business (at DESY??)

Ingrid-Maria Gregor, JRA1: Planning 2009 SPS Schedule

Ingrid-Maria Gregor, JRA1: Planning 2009 SPS Schedule

Ingrid-Maria Gregor, JRA1: Planning 2009 EUDET JRA1 Testbeam 2009 DESY  15. – 30 May: CMS Diamond (????) CERN H6B  July 17 th - EUDET (2 weeks)  July 31 st - DEPFET (1 week)  August 6 th – ISIS (1 week)  August 13 th – PILC (6 days)  August 20 th – SILC (11 days)  Parasitic running: Ivan Peric (EUDET term)  DEPFET also parallel with EUDET  ISIS parallel with PILC (???)  MimoRoma ?? To de defined DESY  September: commissioning of final telescope !!! (really at DESY??)  October: ATLAS Planar Pixel (???) Further discussion with: ATLAS straw tubes (so far through Julia) ATLAS straw tubes (so far through Julia) ATLAS planar pixel (Jens Wüstenfeld) ATLAS planar pixel (Jens Wüstenfeld) 3D sensors (HG Moser) 3D sensors (HG Moser) …. …. Further discussion with: ATLAS straw tubes (so far through Julia) ATLAS straw tubes (so far through Julia) ATLAS planar pixel (Jens Wüstenfeld) ATLAS planar pixel (Jens Wüstenfeld) 3D sensors (HG Moser) 3D sensors (HG Moser) …. …. } ~ 7 weeks

Ingrid-Maria Gregor, JRA1: Planning 2009 Two Telescopes ?  Planned: „upgrade“ demonstrator to final telescope  Replace MimoTel by Mimosa26  Change EUDRBs to digital readout  More and more requests for the telescope (always for use at CERN-SPS)  Full Copy of Telescope costs ~100kEUR (without men power)  Possible solution: we propose a telescope to CERN:  CERN pays the material and we do some of the work  CERN stuff joins JRA1 to help us keeping it running until 2010 while learning how to keep their copy running  Something like this … Item Full Copy [kEUR] Chips (Mimosa26) 20 Sensor Boards 5 Readout Boards 20 Mechanics (simple) 10 VME CPU 3 VME crate 64bit 5 XY table 15 Cooling5 Power Supplies 5 TOTAL88 Proposal would be needed very soon to gain support for this years test beam campaign!!

Ingrid-Maria Gregor, JRA1: Planning 2009 Publication Of Analog Telescope Results  Testbeam data should be published as soon as possible  NIM-A seems to be the right journal (as discussed May 2008)  What to do  Decide on outline of paper (done much earlier)  Draft paper (main editing: IMG -> draft very preliminary)  Paper meeting tomorrow to decide who works on what (11:15-13:00?)  Input to next version: April 15 th 2009  Prepare draft 1 and circulate (JRA1) -> April 17 th 2009  Paper ready to be submitted to EUDET SC -> April 30 th 2009  Submit as report to EUDET ~May 15 th 2009  Submit to NIM-A shortly after Please help to finalise this paper!!

Ingrid-Maria Gregor, JRA1: Planning 2009 Conferences 2009  TIPP2009 March 11– , Tsukuba, Japan  Antonio Bulgheroni, The EUDET Telescope …  Christine Huguo, Mimosa26  Ingrid-Maria Gregor, EUDET Overview Talk  IEEE NPSS Real Time Conference 2009, May 10-15, 2009, Beijing, China  Daniel Haas, The DAQ for the EUDET Telescope  11th Pisa Meeting on Advanced Detectors, May , 2009, La Biodola, Isola d'Elba (Italy)  11th European Symposium on Semiconductor Detectors, June 7th - 11th, 2009 at Wildbad Kreuth, Germany  ….  Please send a mail to Natalia Potylitsina-Kube if you give a EUDET related talk at any conference !! This makes life much easier when we write the annual report.