Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Large-Scale Integrating Project SEVENTH FRAMEWORK PROGRAMME THEME 1: HEALTH Optimization of Treatment and Management of Schizophrenia in Europe General.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
EPOCA – 11. June EPOCAConsortiumOrganisation.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
RITC Report to AdCom Chuck Melcher March 6, 2010.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association INSTITUT FÜR EXPERIMENTELLE KERNPHYSIK
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
News – 32 days to submission December 11th 2015 ITN.EJDC.Roda Universita` e INFN Pisa 1.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
WP3 - Evaluation and proposal selection
FTK: update on progress, problems, need
Summary of Deliverables & reached Milestones
News – 20 days to submission
EMI Project Processes and Tools
AM system Status & Racks/crates issues
Calliope-Louisa Sotiropoulou
WP8 – Improvement and equipment of irradiation beam lines
Secondments & tasks Management meetings – Calendar
Francesco Forti University and INFN, Pisa
News – 15 days to submission
Overview of the FEPAC Accreditation Process
SKADS Controller’s Meeting Timeline Annual Financial Report
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
TOP6 – WP4 Coordination and Management JPICH Coordination Office
IEEE IMT-Advanced Review Process
KICK OFF meeting - project presentation
NSS Instrument Project Tollgate Coordinator
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Presentation transcript:

Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment

OUTREACH - FTK workshops - Trainings SCHEDULE ALL DONE IN PISA first year YEAR 1 YEAR 2 Where we do it The second year? CERN Training! YEAR 3 This is going to happen now in AUTH Very nice organization – congratulation to AUTH! Training in the LAB with FPGA evaluation boards and VIVADO! Very nice workshop Participation with a talk also at the school on trigger! NEXT year at LPNHE! What do you Plan to offer?

Very nice session on FTK! Next Friday At AUTH

SLP1 task – the good occasion with Thales did not work It looks like Thales is now very little interested We are looking for different contacts Cadence -- IMEC

Recruitments GA approved for the AUTH recruitment Having a a short list of the follwoing three: Dr. Naoki Kimura, Dr. Daniela Paredes and Dr. Antonio Branca Arranging interview with them, with the selection comittee: - Calliope-Louisa Sotiropoulou (gender officer), Simone Donati (UNIPI), Kostas Kordas Who has to answer for the GA: Mauro Dell’ Orso –UNIPI, Chair Kostas Kordas – AUTH, Member Alessandro Iovene – CAEN, Member Betty Magnin – CERN, Member -- missing answer Giovanni Calderini – CNRS, Member Petros Soukoulias – PRIELE, Member Simone Donati – UNIPI, Member

Recruitments Who has to answer for the EB: Dell’Orso UNIPI, Project Coordinator, Kostas Kordas, AUTH, WP 7 Dimitrios Sampsonidis, AUTH, WP 8 Paola Garosi, CAEN, WP 2 Francesco Crescioli, CNRS, WP 6 Andreas Sakellariou, PRIELE, WP 1 Marco Piendibene UNIPI, WP 5 Coordinator, Member Chiara Roda UNIPI, WP 4 Betty Magnin CERN, WP 3

Mid Term Review Has to be done preferably on months September-November I propose September Report should be delivered one month before: end of July

Management – Meetings (1/2) 1.ANNEX 1: The GA will meet twice per year (M5 & M11 each year) to deal with administrative issues of the project. The EB will meet every 4 months (M3, M7, M11 each year) to assess the progress in research and training aspects. 2.CONSORTIUM AGREEMENT: General AssemblyAt least once a year Executive BoardAt least quarterly PROPOSAL June 2013: approve an “amendment” to CA by EB and GA. - Unless otherwise required by practice, EB will meet 4-monthly

NEXT EB, GA meetings proposal Today-tomorrow meeting is the first GA, EB of the year. Next EB can be in July The last GA, EB can be in September-October depending when we will have the Mid-term review

Summary 2013 The “progress report” has been submitted in time with a lot of work on my side. Little interaction from the collaboration Deliverables and reports sent in very preliminary form, needed my work to ne finalized. The web site is still “almost empty” Let’s see what will be the EU analysis of the project I hope to have more collaboration in the future, also because the next step (Mid term review) is much more complex.

However the scientific work has advanced significantly We could declare that the milestones were reached We had a lot of contributions to conferences (see next slide) The AMBSLP2 was produced and seems ok The cooling tests seems promising We already have the CAEN PS The integration with the AUX card is ok on our side (much work has to be done on AUX side)

S. Citraro et al. “The Associative Memory system for the FTK processor at ATLAS”, 11th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors11th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors, Florence, Italy, Jul C.-L. Sotiropoulou at al., “A Multi-Core FPGA-based 2D-Clustering Algorithm for High- Throughput Data Intensive Applications”, 14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications, Como, Italy, Sep G. Volpi et al. “Design of a hardware track finder (Fast TracKer) for the ATLAS trigger”, Journal of Instrumentation (Impact Factor: 1.66). 01/2014; 9(01):C DOI: / /9/01/C01045; Topical Workshop on Electronics for Particle Physics, Perugia, Italy, Sep C.-L. Sotiropoulou at al., “A Multi-Core FPGA-based Clustering Algorithm for Real-Time Image Processing”, 2013 IEEE NSS and MIC, Seoul, Korea, Kor, 26 Oct - 2 Nov A. Lanza et al, “The Associative Memory Boards for the FTK Processor at ATLAS”, 2013 IEEE NSS and MIC, Seoul, Korea, Kor, 26 Oct - 2 Nov D. Magalotti et al., “THE ASSOCIATIVE MEMORY SYSTEM FOR THE FTK PROCESSOR AT ATLAS”, 14th ICATPP Conference on Astroparticle, Particle, Space Physics and Detectors for Physics Applications, Como, Italy, Sep 2013,

2014 Program - Milestones M.2.2. Slp2 ok at Caen CAEN M20 SLP2 runs flawlessly at CAEN M.2.3. Infrastructure ok at CAEN CAEN M20 Infrastructure validated M.2.4 Compare_technologies CAEN M20 Compare and choose technology M.3.1. Demonstrator ok at Atlas CERN M24 Demonstrator runs flawlessly in Atlas

2014 Program - Deliverables D.4.3. Test Vectors for the SLP2 based FTK R RE M16 Guido/Daniel D.2.3. CAEN power supply ready for integration R RE M18 Marco/Alex D.2.4. FTK cooling and mechanical tests completed R RE M20 Paola/Ago D.2.5 SLP2 fully integrated Pub PU M20 paper Pierluigi/Albe D.3.1. FTK demonstrator commissioned Pub PU M22 paper NSS D.6.2. Standard characterization R RE M24 Giovanni

OUTREACH MILESTONES & Deliverables M.7.1.-M.7.3.Open Days results verificationAUTH M8, M20,M32 Sept. M.7.4. –M.7.6.WorkS. days results verification AUTH M6, M18,M30 JULY M.7.7. –M.7.9.Summer schools results AUTH M7, M19,M31 August D.7.1. IAPP project open days R PU M7, M19, M31, M43 August D.7.2. Workshop days (at AUTH next week)R PU M5, M17,M29, M41 June D.7.3. Summer school weeks (boot camp?more?)R PU M6, M18,M30, M42 July D.7.4 D.8.3 World wide web site for dissemination R PU M6, M18, M30, M48 July Status of Web site D.8.1. FTK Workshops Now)R RE M1, M13, M30, M46 February D.8.2. Trainings (next is CERN)R RE M1, M5, M9, M19, August M29, M47

CONCLUSIONS Interesting work developments Our recruitment – secondment plan is going ahead with changes but all approved by PO We wait comments from the first progress report submission