LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS 1582238.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Injector De-cabling Project Project Team Meeting #
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
LIU–PLI report LIU Project Team meeting. LIU - Planning & Installation Coordination Meeting Space Reservation & Engineering Change Request - Guideline.
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
AFC 2017 (and 2018) AFC timeline:
BE-CO Activities for LIU-CPS and LIU-SPS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Injector De-cabling Project
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
Planning and Installation
EC Activities Status for the LIU
LIU–PLI report LIU SPS meeting.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
prepared by R.A.Barlow 30/056/2016
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LIU-SPS review for BI (no BWS)
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS

Summary 22/02/2016 EDMS Georgi Minchev Georgiev EN-EL-FC 1.FC project approach 2.LIU EVM FC 3.LIU works NOT declared in PLAN 4.SPS BI-BPM upgrade 5.FC demands

1. FC project approach 1/2 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC Cable campaign 1 work area Preparation phase: quantities, 3D integration, budget envelope, strategy establishment 1 Job Requests DIF/DIC User 1 Requests DIF/DIC User 2 Requests DIF/DIC User 3 1 work area Administrative part Installation of cables trays, racks, boxes, etc… (if necessary) PreparationPreparation InstallationInstallation DC cables Project request DC cables calculations Working by cabling campaign (EDMS )

22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC 1. FC project approach 2/2 Cable campaign 1 work area Preparation phase: quantities, 3D integration, budget envelope, strategy establishment 1 Job Requests DIF/DIC User 1 Requests DIF/DIC User 2 Requests DIF/DIC User 3 1 work area Administrative part Installation of cables trays, racks, boxes, etc… (if necessary) PreparationPreparation InstallationInstallation DC cables Project request DC cables calculations Project leader Budget envelope Memorandum and summary table established by EN-EL-FC (EDMS ) Transitory budget code signal cables TIDs Attributed budget code DC cables Why this method? -Easier to organise cabling campaigns; -In the interest of CERN, EN/EL installation contract gives huge discounts for big work quantities; -Easier budget monitoring.

2. LIU EVM FC 1/2 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC Workunits related to EN-EL-FC, already created - New budget code should be created for WBS LIU-SPS 23.9 WU IDBaselineStatusDescriptionWBSHolders Start DateFinish Date Baseline 6ACCabling and RacksLIU-PSB 1-Jan Dec budget CHF Baseline 6PLDC CablingLIU-PSB 1-Jan Dec DC Cabling (Installation) CHF 20 Supervision CHF Baseline 4ACSBDS CablingLIU-SPS 1-Jan Dec Goods CHF Baseline 4PLSBDS CablingLIU-SPS 1-Jan Dec Goods CHF Baseline 4PLSBDS CablingLIU-SPS 1-Jan Dec Goods CHF Baseline 4PLSBDS CablingLIU-SPS 1-Jan Dec Goods CHF Baseline 4PLSBDS CablingLIU-SPS 1-Jan Dec Goods CHF - The timeline and budget are correct.

2. LIU EVM FC 2/2 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC Workunits to be created WU ID Base lineStatusDescriptionWBSHolders Start DateFinish Date Signal 1-Jan Dec budget54253Budget envelope by FCCHF Signal 1-Jan Dec budget54255Requests to be provided by LIUCHF DC 1-Jan Dec DC Cabling (Installation) CHF 20 Supervision CHF Signal CablingLIU-SPS 200 MHz RFtbd 1-Jan Dec budgetTo be createdRequests to be provided by LIUCHF DC CablingLIU-SPS 200 MHz RFtbd 1-Jan Dec budgetTo be createdRequests to be provided by LIUCHF Signal CablingLIU-SPS TI2&TI8tbd 1-Jan Dec budgetTo be createdRequests to be provided by LIUCHF Signal CablingLIU-Linac4 1-Jan Dec budgetTo be createdRequests to be provided by LIUCHF DC CablingLIU-Linac4 1-Jan Dec budgetRequests to be provide by LIUCHF - Five new budget code should be created.

22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC 3. LIU work NOT declared in PLAN 1/3 LIU activities announced before PLAN start-up LIU activities announced in PLAN LIU activities already done in LS1 or YETS15-16 New LIU activities Difference detected by FC

3. LIU work NOT declared in PLAN 2/3 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC GoalUpgradeAction Equipment or System impacted LocationGroupContact Linacs-LEIR Linac4 connection to PSB upgrade the interlock system interlock system LT, LTB, BI lines + racks (room ??) TE- MPE R. Mompo PSB PSB 2 GeV Upgrade Beam Intercepting Devices Change the Beam StoppersBI.STPFA BI line (PS Switch Yard) EN-STI Damien Grenier PSB 2 GeV Upgrade Beam Intercepting Devices Change the Beam StoppersBI.STPSW BI line (PS Switch Yard) EN-STI Damien Grenier PSB 2 GeV Upgrade Beam Intercepting Devices Change the Beam StoppersBTP.STPBTP lineEN-STI Damien Grenier PS IS IT STILL IN LIU SCOPE? Difference detected by FC

3. LIU work NOT declared in PLAN 3/3 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC SPS Increase SPS performance Beam Instrumentation upgrade Upgrade BGINew BGILSS5BE-BILars Jensen Increase SPS performance Beam Instrumentation upgrade Upgrade synchrotron-light monitors BSRT, matching and BLDM Move BSRT location to be defined by BE-OP BE-BILars Jensen Increase SPS performance Beam Instrumentation upgrade Ionisation BLMsNew BLMs location to be defined by BE-OP BE-BILars Jensen Increase SPS performance 200 MHz low level improvement Consolidation of drivers, cavity controllers, HV power supplies, CV and power couplers. Low-level improvement (replace obsolete system with new digital control) Farraday Cage works (to be detailed) BA3BE-RF Wolfgang Hofle Philippe Baudrenghien Increase SPS performance 200 MHz low level improvement Consolidation of drivers, cavity controllers, HV power supplies, CV and power couplers. Low-level improvement (replace obsolete system with new digital control) to be detailedLSS3BE-RF Wolfgang Hofle Philippe Baudrenghien Increase SPS performance Better damping of instabilities New intra-bunch damping system in vertical plane to damp instabilities from TMCI or ECI. New wide band transverse damper to be detailedBE-RFWolfgang Hofle Increase SPS performance LIU ions SPS injection upgrade to allow injection of ions with 100 ns rise time Addition of new kicker 100 ns rise timeMKPBA1 (surface)TE-ABTJan Uythoven Increase SPS performance LIU ions SPS injection upgrade to allow injection of ions with 100 ns rise time Addition of new thin in-vacuum septum New MSI-V septum LSS1TE-ABTJan Uythoven Increase SPS performance LIU ions SPS injection upgrade to allow injection of ions with 100 ns rise time Addition of new dump New Ion injection dump LSS1TE-ABTJan Uythoven Increase SPS performance LIU ions SPS injection upgrade to allow injection of ions with 100 ns rise time Addition of new BI equipmentto be detailedLSS1TE-ABTJan Uythoven IS IT STILL IN LIU SCOPE? Difference detected by FC

4. SPS BI-BPM upgrade 22/02/2016 EDMS Georgi Minchev Georgiev EN-EL-FC Installation of optical fibres in SPS – project MOPOS Done Remains

5. FC demands 22/02/2016EDMS Georgi Minchev Georgiev EN-EL-FC Attention - only 3 fibres requests for the moment! -LIU shall ensure correct insertion of all activities in PLAN tool – works & projects with sub works -LIU shall ensure creation of the transitory budget codes and their feeding via TID -LIU shall provide before end of March 2016 the expected work volume (No of cables, average length) needed for FTEs estimation Long Shutdown Commissioning Operation Technical Stop YETS 2015 EYETS 2016 * YETS 2017 LS2 *Be ready by end of 2016 in the event of possible full linac4 connection Today we are here -LIU shall provide before end of September 2016 pre-requests for budget envelopes estimation -All definitive requests (DIF, DIC, DIR, DEC) shall be submitted before 21/12/2017