R2E Workshop Preparations RadWG Meeting March 25 th.

Slides:



Advertisements
Similar presentations
16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Advertisements

RAMIRI2 Prague 2012 Project management and the RI Life Cycle.
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
Measures Definition Workshop
Client Logo LEAN ENTERPRISE Implementation Workshop.
Risk management in Software Engineering T erm Paper By By Praveenkumar Sammita Praveenkumar Sammita CSC532 CSC532.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Installation and Maintenance of Health IT Systems
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TS, Length of YETS EYETS LIU & CONS Project
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Develop Project Charter
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
1 1. Some recent views ( ) 2 Linac tunnel
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY PART 2: How.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
LEA Conference, October 18, CIWMB Proposed Compliance Strategy Lorraine Van Kekerix Division Chief Compliance Evaluation & Enforcement Division.
Developing a Project Proposal - SPROUT - ACTRAV-Turin.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
. Thematic Working Group 4 Possible Elements – Chapter VI: Constraints, gaps and related financial, technical and capacity needs CGE Workshop to exchange.
Prof. Roy Levow Session 2.  Define the Project  Develop a Detailed Plan  Launch the Plan  Monitor / Control Project Progress  Close Out the Project.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
R2E Availability October 15 th 2014 RE Equipment G. Spiezia.
CONS and HL-LHC day Analysis of needs from TE-EPC
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
4.4 Monitor and Control Project Work
Dependability Requirements of the LBDS and their Design Implications
Chapter 6: Database Project Management
Tanzania JAS: Proposed work program for Joint Analysis /Programming
Software Configuration Management
Project Integration Management
Testing Plan Workshop Santa Cruz County BH
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Guidance notes for Project Manager
Collimator Control (SEUs & R2E Outlook)
Experience with an IT Asset Management System
Operations sustainability
RADIATION induced failures in LHC 28th June 2011
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Managing Project Work, Scope, Schedules, and Cost
R2E Follow-Ups and Project
R. Losito – LHC Performance Workshop Chamonix Jan 2010
Radiation Working Group RADWG
Presentation transcript:

R2E Workshop Preparations RadWG Meeting March 25 th

Aim Of the Workshop Update on early monitoring and calculations Summarize known/unknown equipment sensitivities Estimate risk of radiation induced failures for electronics over the period(s) of LHC operation Review all mitigation options Planning & Cost Estimates Derive a proposal/plan to be presented to the management

“Workshop Planning” Date: June 8 th – 10 th Agenda currently in preparation List of open points (“work-packages”) summarized at: – RadWG Iterations: upcoming meetings dedicated to: – equipment tests, test requirements (present & future), relocation constraints, other equipment mitigation options (e.g., split of units) or new developments – it’s your responsibility to be present and contributing

Where Are We? Analysis of critical areas (calculations,…) Early mitigation options (immediate improvements) and medium-term preparations Equipment inventories & constraints Early monitoring and LHC operation Analysis of mitigation options First proposal of options PC Review R2E Workshop Long-Term proposal Start … Next steps

Input From Equipment Owners Equipment inventories are the basis for the integration (relocation) studies – Are the lists complete/correct? -> The provided details are collected in reports to be distributed for approval -> Coordinated by G. Spiezia (e.g., Point-5 next talk) For all critical areas, installed equipment has been ordered by priority taking into account: – Category (safety related of other) – Failure consequences (e.g., length of downtime) – Radiation sensitivity (where known) – Summary available at: -> Please verify that it’s complete and correct -> The summary will again be distributed for approval

Equipment Owners – Radiation Tests Former tests (TCC2, …) – in case results can be used for equipment installed in critical areas (not yet tested at CNGS) – the results have to be reviewed, discussed and summarized Past CNGS tests: – Lessons learned: reporting has to be improved (in many cases only presentations exist, as well as Daniel’s summary paper) – RP constraints followed partly at last minute Upcoming tests: – RP related preparations more sound – Focus on equipment in critical areas (COTS mainly) – Preparation crucial due to possible high sensitivity (continuous monitoring required) – Providing an estimate about the failure probability was requested at Chamonix -> before long-term mitigation options can be started

Input From Equipment Owners Optional mitigation possibilities: – ‘Easy’ improvements (e.g., switching off access doors during LHC operation) Procedure prepared? – Split (reconfiguration) of equipment so that most sensitive part can be brought in save areas Minimize relocation costs, allow for early actions! Any proposals? – New developments (e.g., ELMB++ with PH/ESE, FIP,…) Your requirements? – Test facilities & areas: estimate of test requirements