Partners Meeting ZeroWIN Southampton, July 2010 Page 1 Construction Partners Presentation Work Package 6 CS4, CS5, CS6, CS7 & CS8 Remade South East, Bauserve,

Slides:



Advertisements
Similar presentations
Site Waste Management Plans and the Code
Advertisements

IBM Corporate Environmental Affairs and Product Safety
Sustainable Construction
Victoria’s Towards Zero Waste Strategy and Waste Management Reform SA Local Government Waste Forum 10 February 2006 Jenny Pickles Manager Strategy & Regional.
Greater Manchester Waste Disposal Authority Our Aim is Zero Waste Councillor Neil Swannick North West Representative, UK Delegation EU Committee of the.
Taking Action on Construction Waste South Ayrshire Council.
West of England Joint Waste Core Strategy Preferred Options Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office.
Finnish Forest industry commitments on environmental and responsibility issues.
Danish Resource Efficiency Strategy Conference Dr Mervyn Jones Head of Collaborative Programmes.
Sustainability Reporting Workshop: Carbon Management Plans and the Carbon Metric Click anywhere to move to the next slide Originally delivered in March.
Overview of Printing Industries Environmental Initiatives Presentation by Hagop Tchamkertenian Manager, Industry & Commercial Policy Printing Industries.
Nigel Marsh, Global Head of Environment, Rolls-Royce plc
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
Staff Induction-Environmental Awareness
GREEN BUILDING.
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
Reducing and recovering your waste: a winning strategy for SMEs and Industrial Areas Presentation of White Paper « Sustainable waste management best practice.
Part of the BRE Trust Protecting People, Property and the Planet BREEAM In-Use: the international sustainability standard for existing buildings – quick,
WHAT’s NEXT 15 TH OCTOBER DAVID CARTER PRESIDENT PACKAGING COUNCIL OF NEW ZEALAND ACCORD? AFTER THE PACKAGING.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Waste measurement & improving performance trainer organisation location date.
The role of waste management and energy from waste in a circular economy- SITA UK’s proposed Severnside development Sept 2009 Stuart Hayward-Higham.
Resource Efficiency Opportunities in the Building Sector
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Mike Murray Chair of EFPIA EH&S AHG MPA Conference Uppsala
Gary Foster Carbon Trust Project Leaders Mark Turner, Energy and Design Engineer Neil Smith Environment Manager Carbon Management & University of Southampton.
Life Cycle Analysis. What is a Life Cycle Analysis? A method in which the energy and raw material consumption, different types of emissions and other.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Sustainable Consumption and Production Working Group: Practical application Strategies and Tools.
Ecospace Project Presented by Laura Dresser December 2006.
Greenhouse Gas Protocol Product & Supply Chain Initiative US Climate Partnership Association 23 June 2010 David Rich World Resources Institute.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
Including Sustainability in the Brief Kate Mills Senior Sustainability Consultant, BRE
EU waste and resource policies Andreas Versmann European Commission – DG Environment Zero waste – February 2009.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Connecting Industry – Creating Opportunities ‘NISP Means Business’ GTBN Dartmouth Presentation 27 th April 2010 Pat Hudson Practitioner, NISP South West.
Supply Chain Management Sustainability Balanced Scorecard
Sustainability reporting John Maddocks - CIPFA. cipfa.org.uk Sustainability accounting and reporting can … … ‘enable the systematic identification and.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Air Quality Governance in the ENPI East Countries EMISSION INVENTORY September 2012 Chisinau, MOLDOVA.
Input requirements for WP7 Andreas Pertl Gudrun Obersteiner Silvia Scherhaufer Peter Beigl 3 rd General Meeting 5 rd - 8 th July 2010 Southampton.
SEE Energy Poverty Nexus Aleksandar Kovacevic. 2 Concept of Affordable Energy compromises: Total social costs of energy that could be covered by productivity.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
WEDNESDAY 27 NOVEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB.
REDUCING WASTE TO ZERO James Copperwait – Managing Director Focus Environmental and Focus Recycling
Austrian Society for Systems Engineering and Automation ZeroWINZeroWIN Towards Zero Waste in Industrial Networks Coordinator: SAT 31 partners from 11 countries.
A Waste Industry View of ZeroWIN Chris Murphy Deputy Chief Executive.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Chemistry Project Solid Waste 1. Municipal waste ( 城市廢物 ) 2. Construction & demolition waste (C&D) 3. Chemical waste 4. Special waste 5. Other solid.
INTRODUCTION TO THE ZEROWIN VISION ZeroWIN Vision Conference, Southampton, July Ian Williams & Tony Curran.
FISSAC Project Françoise Bonnet Secretary General, ACR+
European Topic Centre on Sustainable Consumption and Production (ETC/SCP) Lars Fogh Mortensen, Head of Group Sustainable Consumption and Production.
Introduction to Environmental Management Systems
‘Sustainability Matters – it’s the future of your business’
Environmental benefits RO-17 Green Industry Innovation Programme Romania 14 Oct. 2016, Bucharest Mihai-Lucian Toniuc  
Greater Manchester Waste Disposal Authority Our Aim is Zero Waste
Ian Williams & Tony Curran
Circular Economy Opportunities in The Construction Sector
Building Efficiency Accelerator
SCP in the 7th Environmental Action Programme
Sustainable buildings
Basic overview of an EMS
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Presentation transcript:

Partners Meeting ZeroWIN Southampton, July 2010 Page 1 Construction Partners Presentation Work Package 6 CS4, CS5, CS6, CS7 & CS8 Remade South East, Bauserve, CEIFA and Wilding Butler

Partners Meeting ZeroWIN Southampton, July 2010 Page 2 ZeroWIN Case Studies CS4 & CS7Remade SE & Wilding Butler CS6Bauserve CS5 & CS8CEIFA Working with other ZeroWIN partners to conduct research Questions arising from the initial work carried out Stakeholder input required to decide way forward

Partners Meeting ZeroWIN Southampton, July 2010 Page 3 Introduction Aim of the Case Studies Case studies 4, 5, 6 new buildings Creation of stakeholders’ networks (producers of materials and components, owners or promoters, architects, contractors, waste management and energy experts) that allow the research team to monitor a sustainable construction project from the planning phase through to completion. Case studies 7 and 8 demolition Research and development needed to assist businesses to correctly plan a demolition / construction project Large volumes of potentially recyclable and re-usable materials being disposed of to landfill Direct monitoring by the research team to provide information about waste types and volumes, logistics, available end markets and demolition protocols.

Partners Meeting ZeroWIN Southampton, July 2010 Page 4 Workshop discussion Progress achieved – case studies started Challenges arising through the project Baseline scenario – how best to collect data? Main environmental impacts (CO2, waste, water) What opportunities for industrial symbiosis? Use of information on site – practical implementation of theoretical studies from WP3

Partners Meeting ZeroWIN Southampton, July 2010 Page 5 Fit with the ZeroWIN Vision WP6 is the core of the ZeroWIN project: Targets 30% reduction of greenhouse gas emissions 70% overall re-use and recycling of waste 75% reduction of fresh water use Preparatory work will enable the nine industrial case studies that form WP6 Aims to test the new production model under real-life conditions Approaches can meet at least two of the targets above

Partners Meeting ZeroWIN Southampton, July 2010 Page 6 Vision ideas from Producer responsibility What is waste prevention Generate economies of scale through networks Competing demands for raw materials Changes in types of materials in manufacture affects end markets Corporate social responsibility – source of supply

Partners Meeting ZeroWIN Southampton, July 2010 Page 7 Vision ideas from Some material streams are transient e.g. CRTs Challenge old ways of thinking Where is the transformational shift? Are social networks of greater relevance in vision? Engage with more practitioners form other EU countries Enable business to get more involved – language?

Partners Meeting ZeroWIN Southampton, July 2010 Page 8 ZEROWIN SCOPE AND BOUNDARIES 5 EXTRACTION OF RAW MATERIALS DESIGN CONSUMER MATERIAL SUPPLIER RETAILER MANUFACTURER COMPONENT SUPPLIER UPSTREAM RAW MATERIALS RECYCLER REFURBISHER MATERIALS RECYCLING FACILITY DISPOSAL??? Zero Waste – No disposal! NOTES: The manufacturers product the final product but also they origin waste materials / sub products that shall be considered (blue dotted arrows) It was decided in the Bilbo meeting that there should not be a distinction between upstream and downstream cluster, seen as before and after the consumer. In the next slides there is a suggestion for the appliance of this scheme to the construction sector (construction and demolition case-studies).

Partners Meeting ZeroWIN Southampton, July 2010 Page 9 Case Study CS4 Remade SE & Wilding Butler Network comprised of: Step By Step, Mixed Development, Aldershot, UK The Construction Team are as follows – Client- Sentinel Housing Association End User – Step by Step (SBS) Main Contractor – Wilding Butler Building Services Engineer- PJR Services Architectural Services- Re Format Structural Engineer – CSC Ltd Clients Representative – Madlin & Maddison

Partners Meeting ZeroWIN Southampton, July 2010 Page 10 Monitoring of water, energy and waste Both energy and water use will be measured on site via meters from a local supplier. Wilding Butler partner with a recycling/waste disposal company who will provide data All suppliers and sub contractors will provide data for their works Wilding Butler will endeavour where possible to engage local suppliers within a given radius to minimise energy use. Wilding Butler will endeavour to negotiate a ‘take back’ scheme with local suppliers who, if surplus material is left after completion of each item will reuse/sell on to other contractors therefore reducing waste costs.

Partners Meeting ZeroWIN Southampton, July 2010 Page 11 Progress to date Site clearance completed Foundations completed Ground slab completed Concrete frame ongoing Data collected so far; Fuel used by temporary generator Electricity used for temporary site offices and welfare facilities Water used, metered at site boundary Waste generated from current site operations

Partners Meeting ZeroWIN Southampton, July 2010 Page 12 Case Study 7 Remade SE Demolition of Tontine Street, Folkestone, Kent, UK The Development Team are as follows – Client – Creative Foundations Architect – Jonathan Stuckey Architects Demolition Contractor – Yet to be appointed

Partners Meeting ZeroWIN Southampton, July 2010 Page 13

Partners Meeting ZeroWIN Southampton, July 2010 Page 14 Materials to be segregated on site Bricks Timber Metal General hardcore/concrete/bricks Roof tiles Plasterboard Glass Sanitaryware

Partners Meeting ZeroWIN Southampton, July 2010 Page 15 Baseline scenario Demolition of Victorian school, Hythe, Kent, UK Bricks, 50% reused on site, 50% crushed for road base Wood, 25% reused, 75% incinerated (power from waste) Hardcore, 100% recycled on site Roof tiles, 100% reused on site Plasterboard, 100% recycled Glass, 100% recycled Sanitaryware, 100% reused

Partners Meeting ZeroWIN Southampton, July 2010 Page 16

Partners Meeting ZeroWIN Southampton, July 2010 Page 17 Mixed waste sent to a local waste transfer station 75% recycling rate (UK average 55%) Only 9 tonnes of waste sent to landfill Almost 900 tonnes of waste reused or recycled 99% reuse/recycling rate

Partners Meeting ZeroWIN Southampton, July 2010 Page 18 Work package 6 | Case Study 6

Partners Meeting ZeroWIN Southampton, July 2010 Page 19 Project I Refurbishment of the Deutsche Bank headquarter in Frankfurt am Main Project II New Construction: still open Rhine-Main Metropolitan Region Work package 6 | Case Study 6 Projects  Second largest metropolitan region in Germany  Productive industry, banking, trade and logistics  Strong railway connection  Best requirements to expose and establish network structures within an industry and between different industry sectors

Partners Meeting ZeroWIN Southampton, July 2010 Page 20 Defining the manufacturing process Existing building [high-rise building] 1 2 Gutting-phase Seperating old materials from the building Construction-phase Installation of new materials / components into the gutted building Refurbished building [high-rise building]  Duration48 months  Gross floor area [m²] m²  height of physical structure 155 m “...Deutsche Bank’s Head Office, its prominent 155-metre twin towers in Frankfurt am Main, Germany, are undergoing Europe’s largest building renovation …” [Source: Deutsche Bank | Fact Sheet | page 1] Project I | manufacturing process Gutting-phase Seperating old materials from the building Construction-phase Installation of new materials / components into the gutted building

Partners Meeting ZeroWIN Southampton, July 2010 Page 21 Case Study 5 – CEIFA Goals Build stakeholders networks involved in a construction project and identify with them their perception of suitable best practices Identify in the construction site the processes suitable for intervention (great impacts and possibility to improvements), in order to promote industrial symbiosis  environmental gains consistent with the call targets For that it is necessary to establish a baseline scenario Identify economic opportunities and barriers to cooperative working within zero-win strategies

Partners Meeting ZeroWIN Southampton, July 2010 Page 22 Case Study 5 – CEIFA Environmental Impacts and Baseline Scenario Building indicators for waste production, energy and water consumption (contacts with construction companies), in order to establish a proper baseline scenario according to the methodology defined (case specific baseline scenario)

Partners Meeting ZeroWIN Southampton, July 2010 Page 23 Case Study 8 – CEIFA Goals Provide information on how the role of the planning phase for the reduction of environmental impacts of demolition Study the relative opportunities and barriers for reduction, reuse and recycling of secondary materials Highlight best practices and identify areas where improvements can be made Identify, in the selected site, the processes suitable for intervention (great impacts and possibility for improvements), in order to promote industrial symbiosis  environmental gains consistent with the call targets. For that it is necessary to establish a baseline scenario

Partners Meeting ZeroWIN Southampton, July 2010 Page 24 Case Study 8 – CEIFA Progress Achieved Analysed Sites: – Demolitions of two high schools (Portuguese Program for rehabilitation of high schools): Escola Secundária da Maia and Escola Secundária de Paços de Ferreira (both near to Oporto) Industrial Partner: – General contractor – EDIFER (project stakeholder) Current stage of the CS: – collection of demolition data for the baseline scenario, together with the involved actors – identification of key processes and the networks involved – identification of documentation failures A third demolition site will be added in the next months

Partners Meeting ZeroWIN Southampton, July 2010 Page 25 Workshop Question 1 How relevant /useful is it to collect the following data? Energy (electricity) used within the site for: plant/machinery, lighting, site accommodation, small tools Fuel use for: plant/machinery Water use for: wheel-washing, site accommodation, wet trades, i.e. concrete CO2 Emissions from: transport movements to and from site, plant/machinery

Partners Meeting ZeroWIN Southampton, July 2010 Page 26 Workshop Question 2 How would participating contractors undertake the minimisation of waste prior to commencement of site? Examples Selection of materials that produce less waste Selection of materials where waste arising is recyclable Careful management of materials to ensure that waste is minimised

Partners Meeting ZeroWIN Southampton, July 2010 Page 27 Workshop Question 3 What standard metric should be used to measure the data required? Examples Per person employed on site? Per square metre of build area? Per Thousand Euro cost? Per tonne of material?

Partners Meeting ZeroWIN Southampton, July 2010 Page 28 Workshop Question 4 What materials currently in use might be replaced by alternative products that have a high recycled content or produce less waste on site? Examples Wood replaced with recycled plastic products Brick replaced with proprietary cladding Roof tiles/slate replaced with green roofing

Partners Meeting ZeroWIN Southampton, July 2010 Page 29 Workshop Question 5 What elements of sustainable procurement are considered when planning a site? Examples Materials and products with low embodied energy Materials and products containing high recycled content Materials and products that are recyclable at end of life

Partners Meeting ZeroWIN Southampton, July 2010 Page 30 Workshop Question 6 Which aspects of energy and water consumption are stakeholders concerned about on site? Examples Reducing the amount of electricity used on site Reducing the amount of water used on site Considering alternative construction methods to avoid wet trades

Partners Meeting ZeroWIN Southampton, July 2010 Page 31 Workshop Question 7 Where do stakeholders see the biggest savings in energy and water consumption on site? Examples Pre-manufactured products/pods Greater subcontractor involvement, i.e. to delegate entire areas of the construction Metering and controls on water and energy use

Partners Meeting ZeroWIN Southampton, July 2010 Page 32 Question 8 What information shall we use to compare our measured results – baseline scenario? Country by country? Sector by sector? Standard construction site?

Partners Meeting ZeroWIN Southampton, July 2010 Page 33 Questions Questions for the ZeroWIN Research team? Feedback session