Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
SPS Access Project PL, EMP Chamonix XV, EDMS: SPS Access Safety System Patrick Lienard, Elena Manola-Poggioli on behalf of the SPS Access.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
1 FVO meeting Dublin March 9/ Beyond compliance auditing! drs. Rob. S. de Heus EMIA RO; Head of the auditdepartment (CAE) Food and Consumer Product.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Access System – LASS/LACS L. Ponce On behalf of the OP team.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
2006 PS&SPS days Summary of key issues and Action Plan.
1 Quality Assurance Working Group Membership and functioning described in the document LHC-PM-QA "Quality Assurance Policy and Project Organization”.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Alternative technologies for interlocking: HIMA Planar4
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
CERN Construction Planning and Scheduling (LHC installation)
Status and Plans for InCA
Equipment simplified model SMR UR safety
Installation of an Instrument on a CERN machine
Evolution and future of the Access safety and control systems
LAAWG Status Report – 15th May 2007
East Area Renovation Project team #6 Launch safety agreement
1v0.
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Renovation of the 45-year old PS magnets
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
East Hall under construction
PSS0 Design & Concept of Operations
PSS verification and validation
Access Control for CERN Experimental Areas
Powering and Safety day Underground access during powering tests
Rack installation and local tests for the MEBT Chopper Rack
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Topics Introduction –SPS project organisation SPS Primary Access System –INB Constraints –Project & Implications for 2006 (and beyond...) –SPS from CCC PS Primary Access System –Control from CCC / CSA –Long-term plan & constraints PS & SPS Experimental Areas Access System –Ongoing project

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Introduction TS-CSE-AAS (all projects) –PS team : R. Bonzano, D. Chapuis –SPS team : M. Grill, R. Villard SPS Projects –SPS Primary system reengineering P. Lienard : Project Leader G. Robin, C. Arimatea – AB/OP collaborators –SPS INB documentation and safety studies E. Manola-Poggioli S. Grau PS Projects –PS  CCC F. Havart, L. Hammouti, O. Ratcliffe, J. Duran-Lopez - AB/OP –(S)PS Experimental Areas H. Nissen, F. Havart

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS Access Safety System - INB The SPS is now considered as part of an INB –“Installations Nucléaire de Base” Compliance problem –current SPS Access Safety System is PLC-based Not redundant Does not comply with the major criteria sought by the INB authorities : –Common cause of failure

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS Access Safety System Compensatory measures –Phase During Run Interlocking of 4 critical access doors in AUG !! Blocking / Condemning all other doors SPS Reengineering –Phase shutdown Development of a separate cabled loop to provide redundancy to PLC system (like LHC) Preparing for complete replacement of SPS Access Safety & Access Control Systems –Phase and beyond Deploy new access control in a phased manner

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days ATTENTION !! Ouverture de cette Porte provoque AUG

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days VETO Access VETO Beam

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS from CCC Consoles are being put in place as we speak –“Old” LEP consoles (ugly consoles – sorry…) –Will stay until new SPS access system is functional –1 day access interruption to reconnect cables and test Drawing by M. Grill

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days SPS from CCC SPS Access system has to be completely re- tested after 1 year of complete shutdown –2 weeks technical verification –3 days final testing before run Operation guidelines shall be given to AB/OP by project team –Patrol before run –Opening of machine

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Primary Access Safety System

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS from CCC PLC-based safety signals –Key interlocks –Via optical fibres Supervision Hardwired  Virtual –Hardwired console replaced by TIM Virtual console CCC or CSA (not both) –Possibility to delegate to CSA if needed during shutdown –No beam operation possible from CSA Drawing by R. Bonzano

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS from CCC Control from CSA since November 2005 Control from CCC planned from 4/Feb/2006 “Genevoise” in MCRTIM Virtual Console in CCC Drawing by R. Bonzano

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Primary Access in the Long term PS Access system is an ageing system –Has suffered many modifications and has many layers due to different technology for each modification –Must be replaced soon Not possible to maintain actual system much longer Should be replaced by LHC-type Access Main difficulty –PS has doors not “SAS” or turnstiles –Doors do not guarantee unique passage –Solution Either install “sas” or turnstiles Or accept CCC operator supervision (maybe not acceptable) In any case investment is high but necessary –Risk is high : no PS  no SPS  no LHC beams

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days PS Experimental Areas Project to revamp PS Experimental areas has continued –Delayed by the PS CCC project –Implementation objective : AD Experimental area access control for 2006 Run East Hall revamp during shutdown –Extension to SPS if according to need Safety PLC-based system –1 PLC per zone –1 master PLC concentrator per “Super Zone” –Interface by physical pin matrix for zone re-configuration –Documentation available for the moment EDMS URD : , SRD : , ADD : Accounts for requirements of PS and SPS –can be supervised remotely by the CCC via TIM

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Drawing by R. Nunes & Access team

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Conclusion CCC –No major problems in sight, but last phase due in the coming weeks SPS Primary –Tight schedule constraints and uncertainties as to SPS Access Control system renovation PS Primary –We have made the last major change (CCC) that will ever be made before renovation is due (S)PS Experimental areas –A project constantly delayed by other projects

Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Thank you for your attention Questions? (hopefully answers too…..)