I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing.

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

DoD Integrated Product Support Roadmap Tool
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
1 EVM Policy July 2013 NAVY CEVM 2 Outline DoDI DFARS DFARS DFARS June 2012 AT&L Policy Letter.
DoD Software Issues and Gap Identification Kristen Baldwin Deputy Director, Software Engineering and System Assurance OUSD(AT&L) April 18, 2007.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
Successful Program Execution Center for Systems and Software Engineering (CSSE) Executive Workshop 15 March 2006 Center for Systems and Software Engineering.
Chapter 3 The Structure of the CMM
The Revised DoD 5000 Acquisition Policies. DoD 5000 Policy Revision DoD Directive Principles retained; innovation/flexibility emphasized DoD Instruction.
1 DOD Fleet Management Training and Certification 7/31/13.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
1 Contractors on the Battlefield Mr. Gary Motsek Assistant Deputy Secretary of Defense (Program Support) November 12, 2009.
IT Curriculum Process and Products September 6, 2014 David Pearson Director, Engineering and Technology Center.
9 Closing the Project Teaching Strategies
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
4.2 Develop Project Management Plan
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Workshop on Environmental Considerations in Military Operations/Global Basing Overseas Policy / Guidance Update DoDI : Management of Environmental.
Earned Value Management Systems (EVMS) Defense Support Team (DST) and Report to Congress Mr. Richard Ginman OUSD(A&T)/DPAP Presentation to National Defense.
JVB-STC'97- 1 #*#* Successful Adoption and Use of Object Oriented Technologies STC ‘97 April 30, 1997 Jim Van Buren.
Parts Standardization & Management Committee (PSMC) Meeting Oct 22, 2007 San Diego, CA Parts Management Reengineering Implementation Process Team (PMRIPT)
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Understanding Industry Defense Acquisition University 13 May 2010 Status Brief to NDIA Program Systems Committee.
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
MEMORANDUM TO: The Defense Industrial Base FROM: Brett B. Lambert, Director, Industrial Policy July 13, 2010 “The Department is committed to working with.
Radar Open Systems Architectures
NTSA Engineering Forum Revitalizing Systems Engineering 21 July 2004 Mark Adducchio Director of Engineering (acting) USAF Training Systems Product Group.
Joint Program Executive Office for Chemical and Biological Defense _APBI_JPEO 1 INTRODUCTIONS Preparing Proposals and Responses to Solicitations.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
UID Unique Identification DFARS
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration.
The Value Driven Approach
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
542d Automatic Test Sustainment Group Automatic Test System (ATS) Acquisition & Sustainment Processes Value Stream Analysis Automatic Test System (ATS)
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
1 DoD Environmental Management Policy. 2 EO 13148: Greening the Government Through Leadership in Environmental Management.
1 1 The FAA's ECSS Acquisition — An Innovative Approach to Procuring Enterprise-Wide Support Services Breakout Session # 782 Scott M. Bukovec Senior Contracting.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Lesson 3: Pre-Solicitation: Developing a Subcontracting Strategy
SQA project process standards IEEE software engineering standards
Sample Fit-Gap Kick-off
Evaluating Small Business Participation
PSC Guidelines and Recommendations
Strategic Management of Human Capital FY04 Implementing Projects
SQA project process standards IEEE software engineering standards
Small Business and Subcontracting.
Quality System.
AM Contracting Guide Proposal
TSMO Program Plan Development
AF Center for Systems Engineering TSPG Engineering Forum
Office of Secretary of Defense
MODULE 11: Creating a TSMO Program Plan
2019 Additive Manufacturing Workshop Day #2 Out Brief DoD Additive Manufacturing Acquisition Guide Co Leads: John Ballou, NAVSUP Debbie Lilu, NCMS.
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing the Revitalization of Systems Engineering

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:2 Institutionalizing SE Requires: Long term leadership support OSD Senior Career staff AFMC/EN Seamless policy and procedures Small gaps remain Skilled and committed workforce Established Center for Systems Engineering (CSE) Education/Training – ongoing Leadership - Direction - Resources

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:3 -ROBUST SE GUIDE - SEP GUIDE - IMP/IMS GUIDE - S/W GUIDE AFFARS Progress toward Institutionalizing SE AF POLICY MEMOS AF GUIDES DoD POLICY MEMOS AFI SEP GUIDE DoD SENIOR SE FORUM DoD GUIDEBOOK AFPDs/AFIs ? DoDDs / DoDIs Lessons Learned OSD SEP REVIEWS Green = Complete Yellow = Gap (JMPS – SEP in Review) Supporting Activities CSE Established LAI Initiatives Industry Associations Phadke Associates

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:4 What are the Gaps in Policy/Procedures? SE participation during Capability development – First “trades” are made here Capability should require attributes of robustness Translation of SE requirements: SOO/SOW > System Specification >Contract Baseline Incorporating critical elements of the contractor proposed SEP to the contract Address flow-down of SE requirements SE and the Test Planning process SE during the sustainment phase of the acquisition life-cycle Need to add or strengthen policy/guidance for:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:5 AFFARS  Air Force Federal Acquisition Regulation Supplement (AFFARS) Mandatory Procedures – Source Selection Guide: “It is Air Force policy that one of Mission Capability’s subfactors shall be Systems Engineering. Specific guidance on how to tailor the Section L and M guidance on Systems Engineering can be found at and available through (Guidance for the use of Robust Systems Engineering in Air Force Acquisition Programs)  New Language being developed for AFFARS to:  Translate critical SE requirements from the selected contractor’s proposal into the resulting contract  Incorporating critical elements of the contractor proposed SEP to the contract  Address flow-down of SE requirements to subcontractors

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:6 Robust SE Guide Sections in Guide cover: Proposal Guidance for Effective Systems Engineering Section M, Evaluation Factors for Award Section M General Comments Section M Specific Comments Section L General Comments Specific Comments – SE Management, Design, Integration and V&V Means to Incentivize Systems Engineering Award Fee Incentive Fees Performance Based Payments

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:7 SE Example - AOC SOO a. SCOPE. 2.0, b. “Perform robust systems engineering to ensure the resulting AOC baseline is (1) easily scalable and expandable (2) loosely coupled and (3) desensitized to variability.” 3.2 ” Continuously validate model(s) incorporating inputs, outputs, controls, mechanisms and noise.” 5.1 ” Perform Robust Systems Engineering ( to ensure flexibility, scalability, expandability and insensitivity to change. Lead integration efforts and support testing within combined government/contractor team to achieve the evolutionary strategy Support and accomplish the transition of new capability into the AOC baseline Support and accomplish testing required to ensure the effective integration of capabilities prior to fielding 5.2 Create a spiral development environment to satisfy evolving, prioritized AOC requirements Ensure the AOC is operationally efficient, scaleable, expandable, insensitive to variations and continually improving Manage processes to be flexible, adaptable and amenable to changes in situation, guidance, or resources SOO Requirements Flow Into Section L&M

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:8 Longer Term SE Research Knowledge gaps Fast Track SE Research Robust Engineering Guide (Updates) Lean SE Practices LAI Initiatives on Systems Engineering SE Learnings from Lean Now Projects Workshop on System Robustness Robust SE Best Practices Study Pilot Projects Best Practices & Research Reports Recommended Policy Changes LAI Support to Systems Engineering... Workforce Development & Education – Academia -- Government -- Industry