Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Wastewater Treatment Plant City Of Valentine FRANK X. SPENCER & ASSOCIATES Consulting Civil Engineers & Land Surveyors INTERNSHIP PROJECT PRESENTATION.
1 Site Capacity and Natural Resource Protection Relationships in Subdivision Design.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Florida Water Forum Everglades Restoration June 3, 2011.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Wastewater Storage Pond Design
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Wastewater Treatment & Collection System Improvements.
Muskegon Wastewater Treatment Facility
Simple Tabletop Exercise Objectives:  Evaluate cyber security protocols and procedures  Consider to what degree reliance on SCADA Systems is appropriate.
Simple Tabletop Exercise Objectives:  Evaluate chemical supply alternatives  Determine interdependencies between the utility and other infrastructures.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103.
Itinerary for Mowing & Grounds Maintenance Services for Loudoun Water Locations IFB Wednesday, May 1, :30 a.m.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
A C E C A MERICAN C OUNCIL OF E NGINEERING C OMPANIES of Virginia Gary Weishaar, P.E. R. Stuart Royer and Associates, Inc. Consulting Engineers Richmond,
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Chapter 2 - continued SITE SELECTION AND FEASIBILITY Persons involved in site selection could include? Design professional Real Estate Agent.
University Storage and Office Orange County Board of County Commissioners Amendment S-5-1 and LUPA January 27, 2015.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Surface Water Plants Hueco Wells Mesilla Wells. Drilling Fresh Water Wells; Both Bolsons.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
School Board Presentation: Site selection for new K-5 Elementary School Tanner/Foster Creek area.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
A proposed solution to basic conveyance and ecosystem restoration problems By Robert Pyke Ph.D., G.E. Robert Pyke, Consulting Engineer Lafayette, CA.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Subdivision Process. Subdivision – Sketch Plan Subdivision Preliminary Plan.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
1 The Future of Organics Management in Palo Alto City of Palo Alto Public Works Operations March 8, 2010.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
ZOX Request for a Minor Amendment to a recently approved special exception for a wood processing facility.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Ball Field Land Acquisition Due Diligence Report.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
Wastewater Treatment Plant Background Slide #1 5/27/2004 CITY OF GALT public works Wastewater Background May 2004.
WATER – WASTEWATER TREATMENT EXPERIENCE
WATER – WASTEWATER TREATMENT EXPERIENCE
Canyons Village Management Association Workforce Housing
Water Pollution Lecture by Dr. Ken Galli, Boston College EESC116301
Budget Study Session – May 22, 2012
Recycled Water Project – Sharon Heights GCC
Community & Economic Development
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
NORTH TRUNK SEWER REPLACEMENT PROJECT
1 2 EMERSON PARCEL (438 acres) GILBERT PARCEL (292 acres) 3 4
City of San Mateo WWTP Site Layout for newly constructed
Septage Management Options
Colchester Interceptor System Improvements Project
Presentation transcript:

Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site

Sawmill Road Site Comprised of three privately-owned parcels (Parcels A, B, & C) Located 1.5 miles south of Santa Rita WWTP Total Acreage: 13 acres Floodplain Considerations Usable Acreage: 9.73

Sawmill Road Site $19.5 M more than Santa Rita Option Removal two lift stations Proposed Odor Control = to Santa Rita S. Access via two new easements on private property Facilities Remaining at Santa Rita: Raw Water Pump 6.9 acres of usable space at Santa Rita

Alternative Sawmill Road Site Comprised of four privately-owned parcels (Parcels B, C, D & E ) Configuration does not include Parcel A, but does require an easement to accommodate conveyance Located 1.5 miles south of Santa Rita WWTP Total Acreage: acres Floodplain Considerations Usable Acreage: 9.89

Alternative Sawmill Road Site $18.9 M more than Santa Rita Option Removal one lift stations Proposed Odor Control = to Santa Rita Facilities Remaining at Santa Rita: Raw Water Pump, Headworks, Odor Control, Emergency Storage 4.6 acres of usable space at Santa Rita

Conveyance: Alignment SI

Conveyance: Alignment S2

Timeline 4 to 6 years.

Access to the Draft Report Alternative Site Investigation: WWTP