Marquis Hill Area Construction Update Meeting December 2, 2015.

Slides:



Advertisements
Similar presentations
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Presentation to Maxwell Place Homeowners Association 1.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
The Park at Battle Bend Springs Special Assessment Meeting St. Edward’s University Trustee Hall, Room 203 February 14 th, 2009; 11:00am.
Utility Extension Project
The New York City Housing Authority Leased Housing Department
Construction Loans. Step #1 - Apply for financing Step #2 - Interim loan secured Step #3 - Construction commences Step #4 - Construction complete Step.
Tymber Skan BCC Update Orange County Government January 27, 2015.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Click on MENU for the options Click MyInfo to access Student Secure Area Course Schedule Etc.
© Oklahoma State Department of Education. All rights reserved.1 Housing Alternatives Standard Renting vs. Buying.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Options to Address Stormwater, Road and Septic Issues.
Marquis Hills Area Construction Update Meeting May 5, 2016.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Multnomah County Deferred Compensation Plan How to Access Your Deferred Compensation When You Leave the County Amanda Devilbiss Investment Advisor Representative.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Student Accounts Cashier’s Office
Workforce Recruitment Program Orientation Presented by: University Career Services & Office of Disability Services.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
The Town of Fort Myers Beach Stormwater Utility: Frequently Asked Questions Prepared by Tetra Tech September 2015.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
Financial Aid Puzzle.
Heritage Park Area Construction Update July 28, 2015
Kent Harrell-Engineering Martha Zeigler-Customer Service
Marquis Hills Area Information Meeting September 13, 2016
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
Marquis Hills Area Information Meeting December 7, 2016
Marquis Hills Area Information Meeting December 7, 2016
107th & 110th Avenue North Public Utilities Renewal Projects
Springbrook Estates Sewer Improvement Area Informational Meeting
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
Participatory Road Program neighborhood meeting Donahoo 174th Street
Colchester Interceptor System Improvements Project
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Galt Court Water Main Replacement
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Arsenal Terminal Development Follow-Up Meeting
INDEPENDENCE POLICE DEPARTMENT
Presentation transcript:

Marquis Hill Area Construction Update Meeting December 2, 2015

Agenda Welcome Meeting Objectives Project Background Frequently Asked Questions (FAQs) Contact Information Q&A

Review project status Discuss construction impacts Address Frequently Asked Questions (FAQs) Outline Mandatory Connection process Supply contact info for future questions Answer individual questions Meeting Objectives

Partnership with CFPUA to install sewer, permanently remove the need for septic Why? To address failing septic. Highest rate in NHC. Address adverse environmental impact, public health risk, financial burden Soil, drainage conditions also bad for septic NHC received low-interest loan from NCDEQ Similar project under construction for Heritage Park Project Background

Silver Lake Rd. Antoinette Dr. Red Heart Dr. Arnold Dr. Normandy Dr. Ilex Dr. Lorraine Dr.

1. What is the status of construction? 2. Impacts were outlined. Will they continue? 3. What are the guidelines for work? 4. What streets will be affected next? 5. How are driveways, flooding being addressed? 6. What happens after construction is completed? 7. My septic is OK. Why do I have to connect? 8. How much is connecting likely to cost? 9. Is there financing to help me pay to connect? 10. Can I be exempt from this process? 11. Can I defer my connection? Frequently Asked Questions (FAQs)

1. What is the status of construction? Started in January 2015 CFPUA contractor TA Loving Company To date, installed 28,000 of 42,000 linear feet of gravity sewer lines month construction project. On schedule. Barring weather, completion slated for Fall 2016 Frequently Asked Questions (FAQs)

2.Impacts were outlined. Will they continue? Major impacts: Roads, easements on your properties Roads will be disrupted. Repaved after completion. Order of remaining streets to be determined Significant closure to involve Silver Lake Road Access to driveways could be blocked temporarily Crews will accommodate as quickly as possible Coordination with school buses, trash, first responders Frequently Asked Questions (FAQs)

3. What are the guidelines for work? Work hours: 7 am – 7 pm, Monday-Friday Some work may go past 7 pm. Once started, can’t stop. Example: Open trenching. Must finish. Can’t leave open. Work conducted within property easements Construction and/or temporary placement of materials If construction work impacts a driveway, ditch, culvert or yard, contractors will restore areas to their original conditions Work in NCDOT rights-of-way (ditches, culverts, headwalls etc.) must be restored per their standards Frequently Asked Questions (FAQs)

4. What streets will be affected next? December: (Weather permitting) Antoinette Drive: Restoration, open cut services, grade, seed/straw, pave Arnold Road: Pave from park to Musevale Musevale Drive: Pave from Arnold to Lorraine Lorraine Drive: Pave from Musevale to Red Heart Red Heart Drive: Pave from Lorraine to MH 50 Rheims & Richelieu Area: Continue restoration Arrowhead Park: Grade, seed/straw Tanbark Drive: Install sewer main Perth Drive: Start preliminary work, build temp road where ditch is now Paving can only be done above 41 degrees. Frequently Asked Questions (FAQs)

4. What streets will be affected next? January: (Weather permitting) Antoinette Drive: Restoration, open cut services, grade, seed/straw, pave Tanbark Drive: Complete storm drain and services Perth Drive: Lay sewer main Silver Lake Road: Begin preliminary work Paving can only be done above 41 degrees. Frequently Asked Questions (FAQs)

5. How are driveways, flooding being addressed? Driveway work Area where our communications could have been better Because of project, nature of soils, work takes longer 60 to 75 days from cut to restoration Some homes longer due to changes in requirements, complexity Flooding issues Difficult in area due to reason we’re there. Bad soils, drainage. Also have to remove stormwater drainage to install sewer TA Loving addressing matters well, but issues will remain Contact crews on scene, Mike McGill when issues arise Frequently Asked Questions (FAQs)

6. What happens after construction is completed? 7. My septic is OK. Why do I have to connect? Mandatory Connection process. Requires connection to systems if a property is within 500’ of sewer lines. Used by cities, counties, authorities Pays for construction, maintenance of infrastructure Why? New mains can cost more than $1 million/mile Allows costs to be spread over larger group, making them more affordable overall Enables extension of essential services to more areas CFPUA will mail letter well in advance, hold public information meeting, mail “packages” to customers with all necessary information, documents 1. \ Frequently Asked Questions (FAQs)

8. How much is connecting likely to cost? Current residential charges are: System Development Charge, Sewer: $2,460 Covers investment into system, amount of capacity needed Sewer Connection Fee is NOT charged. Part of contract. Private connection from home to clean out. Private or personal work (if requirements are met). Frequently Asked Questions (FAQs)

9. Is there financing to help me pay to connect? CFPUA offers financing for the System Development Charge (SDC) SDC: May be financed for eight years at 5% Requires 10% down payment Current account must be in good standing Must reside at the property Additional loan processing fees apply Financing may also be available through the New Hanover County Water and Sewer Revolving Loan Program Frequently Asked Questions (FAQs)

Frequently Asked Questions 10. Could I be exempt from this process? Yes, if a structure is more than 500’ from sewer main If less than 500’ away, Connection Deferral applications are available: Two connection deferral options now being offered Permit approval by New Hanover County Must apply within 60 days of start of mandatory connection process

11. Can I defer my connection? Two connection deferral options now being offered Reviewed deferral policy to address customer input Balances public health protection w/financial impact Your area grandfathered. Can choose between options. To qualify for any deferral, septic system must be proven to be in good operating condition Frequently Asked Questions

11. Can I defer my connection? Two connection deferral options now being offered First option, same as outlined during October 2014 meeting: Three years, with potential for one three-year extension Not a true deferral. Requirements include: Payment of sewer System Development Charge Payment of sewer bi-monthly Availability Charge Septic system inspected by licensed inspector. Report submitted to CFPUA. Frequently Asked Questions

11. Can I defer my connection? Two connection deferral options now being offered Second deferral option (New): One three-year deferral for sewer service. No additional term. Septic system inspected by licensed inspector. Report submitted to CFPUA. How is this new option an improvement? True deferral for sewer. No financial payments required for sewer. No up-front sewer SDC charge Pay SDC at connection. (End of deferral.) No bi-monthly sewer charge Begin to pay bi-monthly at connection. (End of deferral.) Frequently Asked Questions

11. Can I defer my connection? Sewer Deferral Options: Frequently Asked Questions

Important Dates Construction meeting: Tonight Next outreach meeting: April/May 2016 Project completion: Early Fall 2016 Mandatory Connection meeting/Start of process: October/November 2016

NC DEQ sampling 11/17 found algae bloom with toxin DEQ report did not cite CFPUA’s dewatering work as a factor However, UNCW professor told StarNews CFPUA’s work was the cause without providing supporting data Dewatering is a common process for main installation CFPUA, working with DEQ and NHC Health Department, conducted water sampling in variety of locations Results showed no sewage. Nutrient levels – where there are groundwater standards – were well within standards. Results supported typical causes, supporting reasons for the project with NHC Previous reports of algae before CFPUA’s work Significant rainfall over last two months Leaking septic systems, poor drainage, poor soils Silver Lake Algae

Contact Information Mike McGill CFPUA Chief Communications Officer (910) Please sign up on the Marquis Hills list to receive the monthly newsletter, project updates and important alerts. Information, FAQs to be under Quick Links