© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.

Slides:



Advertisements
Similar presentations
Planning and Cabling Networks
Advertisements

Chapter 3: Planning a Network Upgrade
Antonio González Torres
Chapter 7: Intranet LAN Design
Chapter 4 – Cisco Semester I
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
CIT 470: Advanced Network and System Administration
Business Data Communications, by Allen Dooley, (c) 2005 Pearson Prentice HallChapter Six 1 Business Data Communications Chapter Six Backbone and Metropolitan.
Cisco 3 - Switches Perrine - Brierley Page 15/10/2015 Module 5 Switches LAN Design LAN Switches.
LAN DESIGN. Functionality - the network must work with reasonable speed and reliability.
Threaded Case Study - RE Miller (Nick Effler, Brian Ford, Cindy Coultas & Teresa Duchardt) April-May, 2000 b Project Goals Implement WAN Access to connect.
IST 201 Chapter 5. LAN Technologies Ethernet – most widely used technology in LANS In 1970, developed and implemented by: Digital Intel Xerox IEEE
1 13-Jun-15 S Ward Abingdon and Witney College LAN design CCNA Exploration Semester 3 Chapter 1.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
Ch.6 - Switches CCNA 3 version 3.0.
ROYAL PALM NETWORK PROJECT John Healy Tom Jamieson
Networking Project Ailis&Louise. General Requirements The Washington School District is in the process of implementing an enterprise wide network which.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
Business Data Communications Chapter Six Backbone and Metropolitan Area Network Fundamentals.
STEP-BY-STEP LAN DESIGN FOR A SMALL BUSINESS
ACACIA Threaded Case Study Seamus Burns Ronan Conaghan Eugene Cullen.
Mitsubishi MotorsCebu Corporation Threaded Case Study-Local Area Network.
Cable.ppt CCNA Exploration Semester 1 Chapter 10
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 LAN Design LAN Switching and Wireless – Chapter 1.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Exploring the Enterprise Network Infrastructure Introducing Routing and Switching.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 IT Essentials PC Hardware and Software 4.1 Instructional Resource Chapter.
Network Design Essentials
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 The Internet and Its Uses Working at a Small-to-Medium Business or ISP – Chapter.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Internet Through an ISP Networking for Home and Small.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 The Internet and Its Uses Working at a Small-to-Medium Business or.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Network Networking for Home and Small Businesses.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 The Internet and Its Uses Working at a Small-to-Medium Business or.
Internet Engineering Course Network Design. Internet Engineering Course; Sharif University of Technology Contents Define and analyse an organization network.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Connecting to the Network Networking for Home and Small Businesses – Chapter.
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Configuring Network Devices Working at a Small-to-Medium Business or.
Cisco – Chapter 3 LAN. LAN Teaching Topology physical topology is the actual layout of the wire (media) logical topology defines how the media is accessed.
The University of Bolton School of Games Computing & Creative Technologies LCT2516 Network Architecture CCNA Exploration LAN Switching and Wireless Chapter.
LAN Switching and Wireless – Chapter 1
1 LAN design- Chapter 1 CCNA Exploration Semester 3 Modified by Profs. Ward and Cappellino.
LAN Switching and Wireless – Chapter 1 Vilina Hutter, Instructor
Intro to Network Design
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Introducing Network Design Concepts Designing and Supporting Computer Networks.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Network Networking for Home and Small Businesses.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 1: Introduction to Scaling Networks Scaling Networks.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Exploring the Enterprise Network Infrastructure Introducing Routing and Switching.
LAN DESIGN – first step 5 ISB – school year 2006/07.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Exploring the Enterprise Network Infrastructure Introducing Routing and Switching.
Chapter2 Networking Fundamentals
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Introducing Network Design Concepts Designing and Supporting Computer Networks.
Cisco 3 - Switches Perrine - Brierley Page 112/1/2015 Module 5 Switches.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Connecting to the Network Introduction to Networking Concepts.
Lecture-2: Idea of Network LAN - Local Area Network WAN - Wide Area Network.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
Advanced Computer Networks Lecturer: E EE Eng. Ahmed Hemaid Office: I 114.
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
01_NF_Ch10 - Planning and Cabling Networks KT Lo.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Internet Through an ISP Networking for Home and Small.
Exploration 3 Chapter 1. Access layer The access layer interfaces with end devices, such as PCs, printers, and IP phones, to provide access to the rest.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Creating the Network Design Designing and Supporting Computer Networks – Chapter.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 ISP Help Desk Working at a Small-to-Medium Business or ISP – Chapter.
Local Area Networks Yiannos Mylonas.
IS3120 Network Communications Infrastructure
Module 5 - Switches CCNA 3 version 3.0.
Planning a Network Upgrade
Lecture6 Network Replacement
Presentation transcript:

© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter 3

ITE PC v4.0 Chapter 1 2 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purpose of a Site Survey  Documents existing network structure –Shows physical layout to determine if new equipment can be installed  Will also help show... –What is already on site –What type of equipment may be needed –Floor plan of structure  Determine obvious issues –Unlabeled cables –Poor physical security –Lack of power –Lack of UPS

ITE PC v4.0 Chapter 1 3 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey  What does the technician look for... – Number of hosts or users how many will be added over the next 12 months how many network servers and/or printers are needed – Internet Service and Equipment if upgrading speed, may need to upgrade equipment – Existing network devices type of network equipment installed configurations loaded on devices – Security are additional firewalls needed – Applications VoIP or video conferencing – Wireless or Wired amount of square feet between access points

ITE PC v4.0 Chapter 1 4 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Determine the Topologies  Physical topology – actual physical layout of devices  Logical topology – documents what paths are taken through the network – includes: IP addresses device names – workstations – routers – servers

ITE PC v4.0 Chapter 1 5 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey  Documentation on current hosts and devices  Includes: – device name – location – brand and/or model – operating system – IP addressing – connectivity method – security

ITE PC v4.0 Chapter 1 6 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Coming up with a Game Plan  A good plan will help identify the following: – Strengths – Weaknesses – Opportunities – Threats  AKA SWOT

ITE PC v4.0 Chapter 1 7 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Phases of the Network Upgrade  Requirements Gathering – analyze data from on-site visit to determine network requirements – done by the design team creates Analysis Report  Selection and Design – selection of devices & cabling – weaknesses of design are identified and addressed here – creation of a prototype  Implementation – overlooked tasks are corrected – constant customer communication is CRITICAL  Operation  Review and Evaluation

ITE PC v4.0 Chapter 1 8 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Examining the Physical Environment  Examine existing facilities and existing cabling  Find MDF (Main Distribution Facility) – houses network devices – all network cable concentrate here – may also contain POP of ISP  Any IDFs? (Intermediate Distribution Facility) – additional wiring closets – connect to MDF

ITE PC v4.0 Chapter 1 9 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cabling Considerations  Check cable types needed – STP – UTP – Coaxial – Fiber  Check cable specifications – Straight Through – Crossover – Rollover – Serial  TIA/EIA 568A/568B standard

ITE PC v4.0 Chapter 1 10 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Check Out the Cabling  Patch Cable – from PC to wall plate  Horizontal cable – from wall plate to IDF  Vertical cable – from IDF to MDF  Backbone cable – handles major traffic  Wiring closet location  Cable management system – protects cables/cable runs  Cable labeling  Electrical

ITE PC v4.0 Chapter 1 11 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purchasing Equipment for the Network  Managed services – equipment obtained from ISP through a lease – all updates, maintenance, etc. of equipment are the responsibility of the ISP  In-house services – all responsibility falls on the customer

ITE PC v4.0 Chapter 1 12 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Selection of Network Devices  Selection of LAN devices – hubs could be used with smaller LANs – switches more efficient managed switch – control over individual ports which is better? (one 24 port switch or 2-12 port switches)  Selection of a WAN device (router) – fixed or modular expansion? fixed – specific number/type of ports modular – includes expansion slots – breaks up collision and broadcast domains

ITE PC v4.0 Chapter 1 13 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cisco Devices  Router – 1841 ISR (Integrated Services Router) – used for medium-sized business – different connectivity options  Switch – 2960 switch – used for Fast Ethernet and Gigabit connectivity

ITE PC v4.0 Chapter 1 14 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Network Reliability and Availability  Reliability – can be achieved by adding redundancy to the network – use of two routers instead of one  Five-9’s of availability – network operational % of time  Use of fault tolerance helps to ensure reliability – a network will continue operating properly in the event of a failure – Use of the following devices will help ensure fault tolerance UPS multiple power supplies hot-swappable devices

ITE PC v4.0 Chapter 1 15 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public IP Addressing Plan  The following devices will need IP addresses – user PCs – servers – printers, IP phones – router LAN interfaces – router WAN (serial interfaces)

ITE PC v4.0 Chapter 1 16 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Summary  A site survey including extensive documentation of both physical and logical network information must be performed before a network upgrade can be planned.  The five phases of a network upgrade include requirements gathering, selection and design, implementation, operation, and review and evaluation.  Structured cabling deals with the placement of cables, location of wiring closets, cable management, and electrical considerations.  Cost and expandability are important considerations when planning equipment upgrades.

ITE PC v4.0 Chapter 1 17 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public