CSE Senior Design I Project and Team Assignments Summer 2014 – Fall 2014.

Slides:



Advertisements
Similar presentations
Todays Agenda 1. Review Project Management Principles 2. Project Management Institute (PMI) Framework 3. PMI Processes 4. Break into Project Teams and.
Advertisements

INITIAL ON BOARDING COACHING
What is TinyOS? An open-source OS Designed for low-power wireless devices, such as sensor networks, ubiquitous computing, personal area networks, smart.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
CSE Senior Design I Project and Team Assignments Fall 2012 – Spring 2012.
Evidence for informal science learning.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
CSE 115 Week 13 April , Announcements April 7 – Exam 9 April 7 – Exam 9 April 10 – Last day to turn in Lab 7 for any credit, last day to turn.
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
CSE Senior Design I Final Project and Team Assignments Fall 2014 – Spring 2015.
ADVENTURE QUEST TEAM BUILDING & LEADERSHIP TRAINING Dale Morris, Justin Morris, Rachel Murray.
May15-30: Fast, Compact, High Strength Magnetic Pulse Generator.
Barriers to Effective Communication. Can you identify any potential barriers to communication? Picture 1Picture 2Picture 3 Write your answers in the text.
Senior Design Tom Rethard. Courses CSE 4316/4317 Taken by CSE, SE and CS majors CSE 4316 Primarily “Professional Practices” – otherwise known as 3310+
Marc Conrad University of Bedfordshire 1 Project Management – PMBOK® Project Initiation Dr Marc Conrad Office: D104 – Park Square
Leadership Cases Group Presentation Instructions.
Department of Engineering Management, Information & Systems Systems Engineering Program Executive MS SE Degree Program A fast-track two-year program offering.
CMM Level 3 KPA’s CS4320 Fall Organizational Process Focus (Goals) Software process development and improvement activities are coordinated across.
Computer System Analysis
PRESENTATION BY SEAN EMERSON Washington Nationals Past & Present.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
DISSOLVED OXYGEN MONITOR TEAM MEMBERS: ANDREW BEOUGHER ANTHONY SWOPE HAO WANG I-CHUN CHAO BING BAI COLIN HICKS Senior Design Dec1211 Dec1211.
CSE Senior Design I Superior Designs, Inc. Summer 2014 Approved Projects (for prototype delivery December 2014) Instructor: Mike O’Dell.
CSE Senior Design I Superior Designs, Inc. Spring 2014 Approved Projects (for prototype delivery August 2014) Instructor: Mike O’Dell.
CSE Senior Design I Superior Designs, Inc. Summer 2013 Approved Projects (for prototype delivery December 2013) Instructor: Mike O’Dell.
HIVQUAL Group Learning Guide – New York State DOH AIDS Institute 1 Facilitation of Quality Program Learning Objectives  To understand the primary responsibilities.
CSE Senior Design I Project and Team Assignments Spring 2012 – Summer 2012.
The Role of Teams in Engineering By: Ethan O’Brien(presenting), Chloe Ward, Robert English, John McDermott and Graham Britchfield.
SENIOR DESIGN 1 FALL 2015 HOME SECURITY SYSTEM [1]
CSE Senior Design I Superior Designs, Inc. Fall 2015 Approved Projects (for final delivery May 2016) Instructor: Mike O’Dell.
Final Year Projects Dr. Jeyakesavan Veerasamy Director of CS Senior Design Program University of Texas at Dallas, USA
Managing Talent MANA 4328 Dr. Jeanne Michalski
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Boss but not Bossy ©2002 Dr. B. C. Paul. Work Place Momentum  The top takes off and hits home runs  The middle brings new strength and spirit to the.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
CSE Senior Design I Superior Designs, Inc. Fall 2011 Preliminary Project List (for delivery August 2011) Instructor: Mike O’Dell.
Welcome to Gifted and Talented. Schedule 3 rd Grade Day B 12:05-12:45.
CSE Senior Design I Project and Team Assignments Spring 2013 – Summer 2013.
CSE Senior Design I Project and Team Assignments Summer 2013 – Fall 2013.
Low Power Communications 4 month secondment at ARM Limited – Cambridge, UK. George Smart Dr Paul Whatmough Dr Yiannis Andreopoulos.
Resuscitation Team Concept. Role of the Team Leader The role of the team leader is multifaceted. The team leader Oranizes the group Moniters individual.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
Team Everest; From:
Earthquake Engineering Project Steve Miller. Today’s Menu Do Now: Mentimeter BREAKING NEWS: 8.3 MAGNITUDE EARTHQUAKE IN CHILE-9/16/2015 Trade Offs and.
1 Senior Design Projects Angela Rasmussen ECE 4900/
Understand Team Members' Styles and Strengths Yung-Hsiang Lu 1.
Peers for Progress STFM AAFP Conference December 2010 Michelle Henry, MSN, RN, VP, Clinical Program Administration Margie Gomez, BSN, RN Clinical Program.
Today’s Agenda 3:30 – 3:40: Welcome back and introduction – S. Harvey
Sport Field John.
Project and Team Assignments
District Key 3.
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
Project and Team Assignments
Project and Team Assignments
Predicting Human Performance Dr. George V. Kondraske
Best Home Automation Company
It’s Time for a Break!!!.
Waccamaw Regional Economic Outlook
All Star Baseball Academy Conroe, Texas
Project and Team Assignments
Employees and project leaders UML Class Diagram and EDG
Project and Team Assignments
Presentation transcript:

CSE Senior Design I Project and Team Assignments Summer 2014 – Fall 2014

SD CSE Team Team  Team Members  Christian Burkhart,  Alishan Chadwani,  Jose Flores,  George Oroni (Leader),  John Podolanko  Project: Sensor- and/or RFID-based Home Management System (Potential Sponsor: UTA Heracleia Lab, Dr. Becker)

SD CSE Team Team  Team Members  Oreoluwa Adebambo (Leader),  Victor Diaz,  Gaurab Gautam,  Braden Walters  Project: Parking Lot Space Locator (Potential Sponsor: Facilities management at local large company/UTA)

SD CSE Team Breaking Bat  Team Members  Brandon Auwaerter,  Sean Gibeault (Leader),  Geoff Graham,  Roshan Lamichhane,  Ehidiamen Ojielu  Project: Baseball-themed Physical Rehab System (Potential Sponsor: Texas Rangers organization, UTA Baseball hitting coach)

SD CSE Team Team  Team Members  Jacob Fisher,  Sumeet Kaur,  Aisha Kulindwa,  Sean Nesburg (Leader),  Tanmay Patel  Project: Smart Mirror (Potential Sponsor: local home automation company, Paul Sassaman)

SD CSE Assignment – Due Friday, 6/20/2014 (lab)  First Team Status Report Presentation (20 minutes per team max - practice it!). Include: name, rationale  Team name, and rationale for choice  Organization and start-up progress preliminary responsibilities how you plan to work, communicate, meet, etc. steps you are taking to become a “team” strengths  Critical/key team strengths weaknesses  Critical/key team weaknesses challenges/obstacles  Important near-term challenges/obstacles (risks?) work outlook  Near-term work outlook (what’s next?)