SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.

Slides:



Advertisements
Similar presentations
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Advertisements

Superconducting Spoke Resonator Cavities and Cryomodules
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Vacuum Vessel Production Readiness Review
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
RF Cavity / Coupling Coil Module
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
325 MHz Spoke Cavity Prototype Cryomodule Project X Front-end Meeting Bob Webber November 3, 2010.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
CERN – Zanon discussions
Spoke Resonators at Fermilab
Cavity Test Results for PIP-II
T5.2: Harmonization - Material and Component Reference
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
S1-G cryomodule assembly status
SC spoke cavity for China-ADS 3~10MeV injector
HIE-LINAC status report
CEPC-650MHz Cavity Cryomodule
QCM and C50-12 Status Update
HWR and Test Cryomodule for China ADS
Presentation transcript:

SSR1 Summary Harry Carter & Tom Peterson 19 November 2010

IIFC 325MHz SPMs and POCs SSR1 Cavity T. Nicol R. Patel P. Prakash SSR1 CM T. Nicol T. Nicol TBD RF Power R. PasquinelliR. Pasquinelli V. K. Handu VTS J. Ozelis J. Ozelis S. Joshi HTS A. Hocker A. Hocker P. Kush Instrumentation M. Wendt M. Wendt C. K. Pithawa & Controls Task Fermilab Sub- Fermilab India Inst. Project Manager POC POC

SSR1 Status in India SSR1 at IUAC in final assembly steps; now expected at FNAL May 2011 (per J. Kerby’s Group A Summary two weeks ago) –Vendor summer period to be accounted for in future planning –Better status communication needed IUAC has asked VECC to build the stainless steel helium vessel for their first two SSR1 resonators. P.K. Prakash is the project physist for the IUAC effort. Jayanta Chaudhuri is the lead VECC engineer. –The first two SSR1 assemblies are expected to be completed and delivered to Fermilab by May 2011 –IUAC intends to construct four more SSR1 resonators in the coming two years. There is no spoke resonator effort at RRCAT at this time, and to my knowledge, none is planned in the future.

Single Spoke Resonator - SSR1 (P.K. Prakash) ~  500 mm Single Spoke Resonator SSR1 G2 (niobium portion) -  = 0.22, f = 325 MHz Shell & Coupler Ports Spoke with Beam Port & Collars End Wall with Beam Port, Daisy Ribs & Donut Rib

SSR1 – Shell (P.K. Prakash) Rolled ShellsMachining Fixture EBW FixtureEBW setup EBW (face) EBW (root)

SSR1 – Spoke (P.K. Prakash) Forming After first stage of forming After second stage of forming After trimmingEBW setupSpoke – Post EBW

SSR1 – End Wall (P.K. Prakash) Die setting upForming – 1 st stage End Wall after the 2 nd stage forming Forming after final stageTrimmingEnd Wall - Final

SSR1 – Other Items (P.K. Prakash) Coupler Port PulloutTrial Niobium Coupler Port Pullout Nb Shell with Coupler Port Pullouts Nb Donut Rib Die for Spoke to Shell Collar Nb-SS Brazed Flange Assembly (L), End Wall Beam Port (R) in SS

Developmental Efforts (P.K. Prakash) Niobium material contingency Forming of Half Spokes Forming of End Walls No margin for error! Several trials required with Cu material A forming trial was made on the Half Spoke using IUAC niobium Design change to SSR1 G2 Vertical access for tacking Brazed Flange assembly from outside not possible Tilt and tack from outside? Welding from inside Fixturing becomes more involved for beam welding. It may not be an issue in large EBW chambers

Delivery Schedule (P.K. Prakash)

SSR1 Status at Fermilab SSR1 prototype completed and successfully tested in FY10 Ten spoke resonators have been ordered and are due to be delivered in Summer 2011 –Roark/Niowave is the manufacturer A generation 3 design for SSR1 is under development. It will improve the df/dP performance of the cavity A three cavity SSR1 prototype cryomodule is also under development. It will be very useful to establish CM requirements for the SSR0-SSR2 production CMs.

SSRx Mech. Design Reqmts. (Foley, et. al.) SSR0/SSR1/SSR2 MAWP: 2.0 bar warm, 2.5 bar cold. –Von Mises equivalent stresses in Nb ≤ 50 MPa Max microphonics amplitude: 30 Hz [SSR2: 20 Hz] –Pressure fluctuations expected: ± 0.1 torr –Contribution of P to df: 50% –df/dp ≤ 75 [50] Hz/torr (30 Hz [20]* 0.5 / 0.2 torr) The stated material thickness for all of the following analysis results is the nominal (as ordered) thickness. For all analyses the material thickness was reduced by 0.3 mm to account for forming and post-processing. A Functional Requirements Specification needs to be developed for all SSRx cavities.

First jacketed prototype with two slow/fast tuning mechanisms System of ribs designed originally for LFD compensation in pulsed machine SSR1 experience from HINS R&D Gen 1 & 2

Mechanical design of SSR1 G3 work in progress Max Von Mises at 2.0 bar=68 MPa Collapse at 5.7 bar 0.57 * 10 bar = 5.7 bar > 2.4 * 2.0 bar

Few iterations in concepts of cavity / solenoid designs to minimize period (690  605 mm) In lattice was used: L p =610 mm Mechanical design: minimizing of df/dP RF coupler & tuner design is in progress Preliminary SSR0 Design (B. Weber)

3-Cavity Cryomodule Assembly (B. Weber) Current leads Heat exchanger Check valve Input couplers Control valves and bayonets

3-Cavity Cryomodule Assembly (B. Weber) Vacuum vessel, magnetic and thermal shields removed

Summary Tom and I had several discussions with Prakash regarding the SSR1 while at RRCAT on Oct In general: –Communications between all parties are good. The addition of Ronak Patel as POC has been instrumental. –Functional Requirements Specifications need to be created for SSR1 as well as the other planned SSRx cavities Status of IUAC work: –All niobium parts for the first two spoke resonators have been fabricated and await EBW at IUAC –IUAC plans to deliver the two SSR1 cavity assemblies to Fermilab in May 2011 –IUAC plans to build an additional four SSR1s over the next two years IUAC has an agreement with VECC regarding the production of the helium vessel components. –Issue of who provides stainless materials came up---IUAC does not plan to provide them and expects VECC to do so.

Summary (Cont.) Prakash provided us with a list of questions and drawing requests from the VECC head engineer (J. Chaudhuri) –Since returning from India, I have met with Leonardo and Ronak to discuss the questions and drawings requests and all initially requested information has been provided to VECC. Additional questions have arisen which have also been answered. Fermilab effort: –SSR1 was completed and successfully tested in FY10 –Ten more SSR1 resonators are planned for construction. They have been ordered from Roark/Niowave. Two are scheduled for completion by the end of this calendar year; the remaining 8 by Summer 2011 –An SSR1 generation 3 design is under development. It will improve the df/dP performance from the generation 1 & 2 designs. –Design work is underway on SSR0 –A three-SSR1 cavity cryomodule design is also underway.