ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.

Slides:



Advertisements
Similar presentations
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
CESSAMag: magnets for SESAME Attilio Milanese CERN.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Anders Sunesson RF Group ESS Accelerator Division
1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
CLIC Spain collaboration CIEMAT: AC structures and Dipoles magnetsCIEMAT: AC structures and Dipoles magnets CELLS - ALBA: Stripline kickers, Impedance.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
LIU-SPS RF Power upgrade | 09 December 2015.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
ALBA RF Systems Francis Perez.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ELENA installation progress F. Butin / ELENA collaboration.
Magnetic Measurements of Storage Ring Bending Magnets at ALBA-CELLS J. Campmany on behalf of ID, FE and magnetic measurements section.
Report Technical Director Storage-Ring-Installation Completed
Status of BESSY II and bERLinPro
Tongming Huang (IHEP) On behalf of the power coupler working group
FEL SCU development at APS/ANL
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
WP5 Elliptical cavities
Status and New Developments of RF Systems of ALBA
ELENA electron cooler and SEM grids status
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
ALBA capabilities towards contributions to the FCC study
ESS RF Development at Uppsala University
BEPCII RF POWER SOURCE AND INPUT COUPLER
LCLS Injector: Introduction D. H
CEPC RF Power Sources System
Electron Source Configuration
A. Freyberg Aug 2016 ECT’16 =>
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
RF introduction Anders Sunesson RF group leader
Overview of RF Gun Specifications and Technical Issues
Status and New Developments of ALBA RF Systems
Presentation transcript:

ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez

Magnetic Measurements Laboratory  Belongs to ALBA accelerators division  Specialized in accurate measurements of big magnetic structures

Magnetic Measurements Laboratory

Measurement benches 1.Hall probe bench – Partially build in-house 2.Rotating coil bench – Purchased from CERN 3.Flipping coil bench – Purchased from ESRF 4.Fixed stretched wire – Designed and built in-house 5.Helmholtz coils – Purchased from Elettra Magnetic Measurements Laboratory

Hall probe bench Rotating coil bench Flipping coil benchHelmholtz coils Fixed stretched wire bench Magnetic Measurements Laboratory

In order to build the accelerators, ALBA did set up a complete magnetic measurements laboratory specialized in characterization of big magnetic structures used in accelerators physics and technology  Magnetic measurement capabilities -Bx, By, Bz bench (Hall) -Iz bench (Rotating coil) -Mx, My, Mz (Helmholtz) -Ix, Iz (Stretched wire / flipping coil) Magnetic Measurements Laboratory

Mission of the laboratory: 1.Measurement of Storage Ring Magnets  Measurement of magnetic field maps → Hall probe bench  Measurement of multipoles → Rotating coil bench 2.Construction and measurement of IDs  Permanent magnet blocks characterisation → Helmholtz coils & Fixed Stretched wire  Measurenent of magnetic field maps → Hall probe bench  Measurement of field integrals → Flipping coil bench Magnetic Measurements Laboratory

SESAME dipoles (2014) CIEMAT magnets for IFMIF Magnets for ESRF upgrade CIEMAT phase shifter for E-XFEL Collaboration with other research centers Magnetic Measurements Laboratory

High Power RF Laboratory  Belongs to ALBA accelerators division  Specialized in low and high RF power measurements and cavity conditioning

In order to build the accelerators, ALBA did set up a complete high power RF laboratory for prototype testing and cavity conditioning. Bunker4.1 x 3.4 m 2 High Voltage Power Supply38 kV – 4 A IOT amplifier80 kW – 500 MHz Waveguide systemWR1800 LLRFDigital IQ ControlsTango High Power RF Laboratory

Cavity inside the Bunker Waveguide System LLRF and Controls racks RF transmitter High Power RF Laboratory IOT cabinet HVPS

High Power RF Laboratory RF lab

Mission of the laboratory: 1.LLRF tests 2.Amplifier IOTs test 3.High power RF conditioning of:  Cavities  Input power couplers High Power RF Laboratory

Collaboration with other research centers CIEMAT IFMIF Buncher cavity (2014) CIEMAT - Cyclotron Cavity (2014) High Power RF Laboratory

Vacuum Laboratory  Belongs to ALBA Engineering division  Specialized in Ultra High Vacuum: design, construction and tests.  Staff: 2 vacuum engineers 2 Vacuum technicians

Vacuum Laboratory

Installation and Material : Clean room class (ISO 8) Bake out oven (length 14m,height 1m,width 2m) 12 roughing station 7 leak detectors Material for bake out (controllers, heaters …) Ion pumps Residual gas analyser Vacuum measurement gauges Traveling crane (1T) Design and Calculation Nx (Siemens) Cad system Ansys for calculation Molflow for vacuum calculation Vacuum Laboratory

ALBA VACUUM SYSTEM Based on lumped Absorber 16 Cells: 8 Unit Cells ~12,5m 8 Matching Cells ~10,3m 4 Long straight sections 8m 12 Medium straight sections 4m 8 Short straight sections 2m Complete Cell baked out in a special oven no bake out in situ except straight sections 3 Aluminium Neg coated chambers (medium straight) 2 In vacuum ondulators (medium straight) Vacuum Laboratory

MAXLAB (Sweden): Design of vacuum chambers for the 3Gev and 1,5Gev MaxIV Storage Rings Thermal, mechanical and vacuum calculation Technical specifications & CFT process Design review meeting with vacuum experts (CERN,BNL,GSI,SOLEIL) Meeting with CERN for coating collaboration Salamanca University (Spain) Design and calculation of a vacuum chamber for a 200TW laser compressor optical devices Technical specifications & CFT process Fabrication follow-up Installation and vacuum tests Vacuum Laboratory Collaboration with other research centers

Conclusion Three labs, developed for the construction of ALBA: Magnetic Lab RF lab Vacuum lab are now ready and used for: ALBA upgrades Collaborations Thank you