Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.

Slides:



Advertisements
Similar presentations
Library System Funding & Capital Projects Budget Issues Workshop February 21, 2012.
Advertisements

Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
22 nd Conference Roads and Works Asphalt Trial – Outcomes so far Rod Ellis Board Member IPWEA SA.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
District Information Session For the American Recovery and Reinvestment Act.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
May 21 Osler Community Hall Community Information Night1 5/21/2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
1 Town of Tillsonburg Lifecycle/Capital/Debt Strategy.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
1111 Operating Budget – March 5, Council Budget Direction – April 2012  City will move to three year budget cycle  City will hold tax increases.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
King County Budget Status Presentation to King County Unions Dwight Dively September 14, 2010.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
Road & Street Maintenance Ballot Measure September 9, 2015 Corey Farkas, Streets Division Manager Travis Easton, Director of Public Works.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Key Service Priorities Next steps.
Roadway Median Tree Program Public Works Department July 13, 2015.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Proposed 2013 Budget Highlights 1. Executive Summary Proposed City tax increase of 4% with an overall impact of 1.9% – Delivers on City’s Long Term Financial.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
Limited Service Agreements
City of Charlottesville
2016 Mill and Overlay Project
Agenda Updates to Driveway and Sidewalk specifications and permits
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Town of Clayton 2016 Pavement Condition Survey
Emphasis on Quality Rochester’s City Owner Contract Process
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
ACEC Designer Training
Presentation transcript:

Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012

Presentation Outline –Shave and Pave - What is it? When to use it? –Funding levels –5 year program development –2012 expanded shave and pave program –External/internal communication plan –2012 status –Impact on Pavement Quality Index (PQI) –Going forward

What is it? Shave and Pave/ Asphalt Resurfacing Milling road surface –curb to curb Minimum milling depth 40 mm Drainage improvements – curb/catch basin rebuilds Placement of top coat of asphalt – re-establish road crown and drainage pattern No changes to the road cross section – width or longitude high points Beginning to end – typically 4 weeks on a road Minimum design input Generally warranted once or twice over roadway life cycle

Shave and Pave- When to use it? Signs of pavement distress Alligatoring (crossing of cracks) High density of longitudinal/transverse cracking Pavement oxidization (brittle) Loss of road crown Poor road drainage

Shave and Pave Program

Funding Levels Prior to 2012: Typical budget $860,000 – Local Roads - Renewal –$500,000 being dedicated to Shave and Pave –$260,000 Rural Surface Treatment –$100,000 Crack Sealing Competing needs within the group, with the Shave and Pave being underfunded

5 Year Program Development 5 year program was developed for shave and pave with funding at $500,000 per year, prior to the 2012 budget process Provided flexibility to increase amount of lane/km for shave and pave based on tender unit prices Proactive approach to program planning Provided information to council and residents Enabled early tendering for completion in current year Improved long term planning with the Region

2012 Expanded Shave and Pave Program 2012 Expanded Program approved by council – March 2012 Funding increase in Local Road Renewal Capital project for Shave and Pave from $500,000 to $1,700,000 Majority of candidate roads in 5 year plan were accelerated into the 2012 work plan Increase from 6 lane/km to approx. 19 lane/km

anded Shave and Pave Program, cont.

2012 Expanded Shave and Pave Program, cont. Internal Business Process Mapping undertaken –Collaborative Program between RPM and Engineering Departments –On-site Inspections/Material Testing –Contract Administration –Customer Service enquiries During working hours After hours

Internal/External Communication Plan Public Communication Notices provided to all affect property owners Contact Information Alternative parking arrangements, as needed Approximate duration of work Program posted on City’s Web site Internal Communication Weekly progress meetings with all involved Ensure timely coordination of various tasks Tasks for a complete surface restoration: –Concrete repairs –Milling road surface –Adjust/rebuild catch basin –Replace road surface –Complete landscaping

2012 Status –Work started July with majority of work completed by September –26 roads (19 lane/kms) completed –Final restoration underway –Remaining funds, up to budget limit, to be used to address backlog of roads

Shave and Pave – Headon Road

Shave and Pave – Shoreacres Road

Shave and Pave – Maplehurst Ave.

Impact on Pavement Quality Index Pavement Quality Index (PQI) Status –Current rate of decline (based on today’s condition) – 2.2 –Total length of repaving in 2012 – 60 lane/km – PQI – 67.4 (Jan 1, 2012) from 67.3 (Jan 1, 2013) – Report – E identified - $3.0 million needed in Shave and Pave to fully stabilize the decline –Future needs will be greater as roads age –Software currently being implemented will allow more detailed prediction of needs

Impact on Pavement Quality Index, cont.

Going Forward 2013 Capital Program Separate capital budget item created – Local Road Asphalt Overlay with $1,700,000 budget (proposed for EBC review) 5 Year program being developed to address backlog Systematic approach based on road condition, coordination with external agencies Staff well positioned to manage additional roads as funds become available

Expanded Shave and Pave Program Questions ?