PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 10/25/2007 Don Lynch. 10/25/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 11/1/2007 Don Lynch Daylight Savings Time ends Sunday Nov. 4 at 2:00 AM.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 4/19/2007 Don Lynch. 4/19/2007 Weekly Planning Meeting 2 Schedule MuTr FEE upgrade prototype 5/9/07 End of Run Party 6/29/07 Next.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch

11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under EC)DoneDone (elsewhere in IR)DoneDone CM Move to Run position DoneDone More decapacitor removalsDoneDone Close out all shutdown ’07 open work permitsDoneDone RPC Tent preparationOn Going11/30 (see slides) EC Roll InDoneDone Blue Sheet/Pink sheetsDoneDone DC East & West repairs (permits done)DoneDone Pre-run CommissioningDone Done Assemble shield wallDone Done Move MMS to run positionDoneDone Install MuID collarsDoneDone Shield wall roll inDoneDone Start of Run 8 (Cooldown)DoneDone Start 2 person watch shiftsDoneDone Install FPGA box (mech. Same as 2006)11/811/9

11/8/2007 Weekly Planning Meeting3 ItemStartFinish Blue ring cold, start d- beamDoneDone (Access during day, beam at night) Lab Holiday: Veterans Day11/1211/12 Yellow ring cold, start Au beam11/1211/12 (beam all day, little or no IR access) Start Flammable Gas11/8?11/9 Start d+Au collisions11/2211/22 Lab Holiday: Thanksgiving11/2211/22 Lab Holiday: Black Friday11/2311/23 Start of 5 person shifts11/2711/27 Start of Physics 12/112/1 (start biweekly maint. Access) Start-of-run party 12/712/7 Install new UPS~2/2~2/9 Switch to p+p run~2/2~2/9 Install HBD West for test run~4/1~4/1 End of Run 85/275/27 Run 8 Prep Schedule (cont’d)

11/8/2007 Weekly Planning Meeting4 Safety Systems/ UPS Temporary UPS installed New UPS due date ??? HSSD system status Other Issues Annual Safety Walkthru Completed - No major faults

11/8/2007 Weekly Planning Meeting5 CM Ladder/Stair Shutdown Access These ladders rec’d

11/8/2007 Weekly Planning Meeting6 RPC Factory Electrical –Walkthru Done. Gas System: Nearly approved; Formatted and formalized. Sign off needed.

11/8/2007 Weekly Planning Meeting7 Equipment – Kenny working on Cosmic ray test stand. John working on piping. Shelving next. Young Jin providing specs and location. RPC group will provide specs for the gap transportation cart (vertical high and low lifting requirements, horizontal/ vertical orientation, table top dimensions, max load capabilities, etc.) PHENIX will design and fabricate. RPC group will provide specifications for gap and module storage racks. PHENX will design, fabricate and install. Work plan – existing work plan covers work to be done between now and factory start up (Factory startup is when production testing and assembly of modules and half octants begins) RPC Factory Issues, cont. Security – Lock installed on door. All zipper doors are to be closed when not in use and zip tied down from inside. Locking tool and equipment cabinets inside tent. Additional security required when raw materials arrive. RPC group to review C-A policy (3 tier requirement as required by C-A procedure 1.20) RPC group will prepare a one page description of how they intend to comply with this requirement. This will be reviewed by C-A.

11/8/2007 Weekly Planning Meeting8 Remaining Action Items from C-A safety review: Gas monitoring equipment to be calibrated and tested per BNL requirements – Equipment is manufacturer calibrated. Will be tested with mini blue sheets check out. Gas schematic/ procedure needed – Done awaiting approval Max flow rates incl. chambers in storage for all gases to be forwarded to M. van Essendelft – still needs to be done before factory startup Electronics to be approved installation and use (including NTRL equivalence approval) – Done, walkthru needed. Any chemicals to be purchased through BNL to assure compliance – Will be complied with Adequate ventillation to be designed into tent – Done Approved security apparatus to protect against theft – see above RPC Factory Issues, cont.

11/8/2007 Weekly Planning Meeting9 Spacer pop, Gas leak test? Gas Distribution racks and Bubblers Dark current test DAQ

11/8/2007 Weekly Planning Meeting10 RPC & MuTrigger FEE Project Status Prototype C – RPC3-A module o mechanical detector module parts and signal plane at hand from CIAE o gaps expected from KODEL in early December Prototype D – two full RPC 3 half octants o bakelite to arrive in Korea in late December o detector module parts to arrive at BNL in January o gaps to arrive at BNL in early March o half octants will be installed into PHENIX in the summer 2008 Arrival of GSU Prototypes (this week) Arrival of prototype C gaps from KODEL 1 st week of December (mechanical detector parts + signal planes from CIAE at hand) Arrival of detector parts + signal planes form CIAE in January Arrival of prototype D gaps early 1 st week of March 2008  all assembly and Q&A infrastructure in place Arrival of mass produced gaps - June 2008  all gap and module storage infrastructure in place

11/8/2007 Weekly Planning Meeting11 Other Work Clean Out Container: Material is evaluated. Clean out and dispose by end of Nov. JTA review and update - in conjunction with performance appraisals Procedure review – pick up where we left off VTX/FVTX projects: beampipe upgrade project, prototype test support NCC – Richie supporting Eduoard design modifications New Crane: safety review to support acquisition and installation next summer

11/8/2007 Weekly Planning Meeting12 Safety, Security, Etc. : 1.Main Door to Counting House is a safety hazzard Needs immediate attention 2.Lifting equipment needs annual inspection in November 3.Check your PHENIX awareness and Collider accelerator training 4.Work planning revisions minor changes to work planning SBMS: New green sheets ES&H  ESS&H, * IH reviews required for certain concerns, No OMC block, feedback box required when green sheet used 3 levels of work planning Worker Planned Work Prescribed Work (Procedure, Instructional Document Planned) Permit Planned Work

11/8/2007 Weekly Planning Meeting13 Station 1, 2, 3 access plan Work to begin on these items after prep for run 8 is finished

11/8/2007 Weekly Planning Meeting14 5 Year Plan 2008 Install stations 1& 2 of MuTr FEE upgrades (south), 1 octant Cu absorber (south), 2 half otants RPC2/3 S, infrastructure upgrades & repairs, misc. subsystem work, MMS south scaffolding 2009 Scaffolding in MMN, MuTr FEE N stn. 1,2 & 3, MuTr N&S stn. 1,2 & 3 repairs, RPC2 N, RPC3 N, north Cu absorbers, infrastructure upgrades & repairs, misc. subsystem work 2010Remove HBD & RXNP, remove beampipe, DC West upgrade, VTX barrel, south Cu absorber completed, MuTr FEE stn. 3 S, MuTr stn. 1, 2 & 3 S repairs, infrastructure upgrades & repairs, misc. subsystem work 2011RPC1 N&S, NCC S, FVTX, infrastructure upgrades & repairs, misc. subsystem work, remove south absorber 2012NCC N, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work, remove north absorber * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2008 is to be done in the shutdown that follows run 8, and so on)

11/8/2007 Weekly Planning Meeting15 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info Ring is now posted Things are heating up (cooling down?) We are off and running!