Current ALICE Grid activities in Mexico Grid of the Americas workshop Luciano Diaz ICN-UNAM February 2011 11/2/2011Grid of the Americas Workshop1.

Slides:



Advertisements
Similar presentations
CBPF J. Magnin LAFEX-CBPF. Outline What is the GRID ? Why GRID at CBPF ? What are our needs ? Status of GRID at CBPF.
Advertisements

Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
DOSAR Workshop VI April 17, 2008 Louisiana Tech Site Report Michael Bryant Louisiana Tech University.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Site Report US CMS T2 Workshop Samir Cury on behalf of T2_BR_UERJ Team.
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
Cambridge Site Report Cambridge Site Report HEP SYSMAN, RAL th June 2010 Santanu Das Cavendish Laboratory, Cambridge Santanu.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Ali Zahir Site Admin / Faculty Member ALICE T1/2 March.
1 ANSL site of LHC and ALICE Computing Grids. Deployment and Operation. Narine Manukyan ALICE team of A.I. Alikhanian National Scientific Laboratory
Computing for ILC experiment Computing Research Center, KEK Hiroyuki Matsunaga.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
March 2003 CERN 1 EDG and AliEn in Prague Dagmar Adamova INP Rez near Prague.
IST E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA Raquel Pezoa Universidad.
Sejong STATUS Chang Yeong CHOI CERN, ALICE LHC Computing Grid Tier-2 Workshop in Asia, 1 th December 2006.
PDSF at NERSC Site Report HEPiX April 2010 Jay Srinivasan (w/contributions from I. Sakrejda, C. Whitney, and B. Draney) (Presented by Sandy.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
São Paulo Regional Analysis Center SPRACE Status Report 22/Aug/2006 SPRACE Status Report 22/Aug/2006.
10/22/2002Bernd Panzer-Steindel, CERN/IT1 Data Challenges and Fabric Architecture.
WLCG GDB, CERN, 10th December 2008 Latchezar Betev (ALICE-Offline) and Patricia Méndez Lorenzo (WLCG-IT/GS) 1.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Dr. Saif-ur-Rehman Muhammad Waqar Asia Tier Center Forum.
CSCS Status Peter Kunszt Manager Swiss Grid Initiative CHIPP, 21 April, 2006.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Overview ROC_LA CERN
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks State of Interoperability Laurence Field.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America EELA Infrastructure (WP2) Roberto Barbera.
October 2006ICFA workshop, Cracow1 HEP grid computing in Portugal Jorge Gomes LIP Computer Centre Lisbon Laboratório de Instrumentação e Física Experimental.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Wrote by Jorge Gomes and presented by Bruno.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Overview of grid activities in France in relation to FKPPL FKPPL Workshop Thursday February 26th, 2009 Dominique Boutigny.
Site Report --- Andrzej Olszewski CYFRONET, Kraków, Poland WLCG GridKa+T2s Workshop.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
FP6−2004−Infrastructures−6-SSA EUChinaGrid status report Giuseppe Andronico INFN Sez. Di Catania CERN – March 3° 2006.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow UK-T0 Meeting 21 st Oct 2015 GridPP.
Tier 3 Status at Panjab V. Bhatnagar, S. Gautam India-CMS Meeting, July 20-21, 2007 BARC, Mumbai Centre of Advanced Study in Physics, Panjab University,
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
Orlon Petterson, University of Canterbury New Zealand site status report Orlon Petterson for the NZCMS collaboration University of Auckland, University.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
INRNE's participation in LCG Elena Puncheva Preslav Konstantinov IT Department.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Instituto de Biocomputación y Física de Sistemas Complejos Cloud resources and BIFI activities in JRA2 Reunión JRU Española.
INFSO-RI Enabling Grids for E-sciencE Turkish Tier-2 Site Report Emrah AKKOYUN High Performance and Grid Computing Center TUBITAK-ULAKBIM.
DIRAC Distributed Computing Services A. Tsaregorodtsev, CPPM-IN2P3-CNRS FCPPL Meeting, 29 March 2013, Nanjing.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
13 January 2004GDB Geneva, Milos Lokajicek Institute of Physics AS CR, Prague LCG regional centre in Prague
Regional Operations Centres Core infrastructure Centres
LCG Service Challenge: Planning and Milestones
ALICE internal and external network
Moroccan Grid Infrastructure MaGrid
Kolkata Status and Plan
Update on Plan for KISTI-GSDC
Testbed Software Test Plan Status
UTFSM computer cluster
Simulation use cases for T2 in ALICE
PK-CIIT Grid Operations in Pakistan
Javier Magnin Brazilian Center for Research in Physics & ROC-LA
Presentation transcript:

Current ALICE Grid activities in Mexico Grid of the Americas workshop Luciano Diaz ICN-UNAM February /2/2011Grid of the Americas Workshop1

Outline Introduction History 2006 – 2011 Current status site ICN-UNAM Conclusions 11/2/2011Grid of the Americas Workshop2

Introduction The ALICE experiment has based their data and computing model on a GRID architecture based on several sites distributed around the world. One Tier 0 located at CERN 88 sites, most of them Tier 1 and 2 11/2/2011Grid of the Americas Workshop3

Mexico is part of ALICE Grid since 2007 when it joined the ALICE production infrastructure through the site ICN-UNAM. 11/2/2011Grid of the Americas Workshop4

History On 2006 the adventure began with tochtli, a cluster with 16 nodes: 32 Xeon 2.4GHz cores and 500MB of memory per core. A 30 Mbps CUDI connection used mainly for videoconferences. The opportunity to join the EELA testbed and ALICE production infrastructure. 11/2/2011Grid of the Americas Workshop5

Site ICN-UNAM on 2006 tochtli 11/2/2011Grid of the Americas Workshop6

2006 June 2006 First hardware upgrade of tochtli to run ALICE jobs: Upgrade of memory: 500 MB to 1.5 GB per core. 1TB of disk for a Storage Element required Site manager registered in the EELA - VO 11/2/2011Grid of the Americas Workshop7

2006 July 2006 Decision to install a full gLite/LCG site and not a pure AliEn site. First steps to create a Resource Center with EELA: site EELA-UNAM August 2006 Site manager registered in ALICE - VO 11/2/2011Grid of the Americas Workshop8

2006 September 2006 Problems to setup ALICE VoBOX SE required First test job arrived on 25 September, but RB problems due to network connectivity with CERN and UFRJ, several minutes to receive a job. Also middleware problems to use the same CN with more than one VO, voms extension will arrive later. 11/2/2011Grid of the Americas Workshop9

2006 At the end of 2006: Many network problems: Mixed routing between CUDI and commodity links. Low bandwidth, better from home Not all was bad: EELA was working on the creation of several Certification Authorities in LA, including Mx-UNAM 11/2/2011Grid of the Americas Workshop10

2007 On January 30, 2007 Latchezar wrote: Dear Luciano, Good job - the site is running fine and we are getting first batch of jobs done at UNAM! Cheers, Latchezar 11/2/2011Grid of the Americas Workshop11

2007 The network latency continue to high. March 2007 More Grid resources added to UNAM (IBT,CCG,FESC and Super), is necessary to split the resources on "production" and "certification" status on the EELA testbed: EELA-UNAM (production) EELA-UNAM-CERT (certification) EELA-UNAM-ALL (both) 11/2/2011Grid of the Americas Workshop12

2007 April 2007 Network characterization, improvement of the network configuration: UNAM-CUDI-CLARA TCP tuning on nodes Symmetric routing Avoid traffic to Europe from Sao Pablo May 2007 Air condition problems, improvement of the room Also UPS overload, firsts time the cluster runs 100% load. 11/2/2011Grid of the Americas Workshop13

Band width test from CERN to ICN using 1,4,8 and 16 conecctions and 264 KB of TCP windows size 11/2/2011Grid of the Americas Workshop14

2007 September 2007 Exploring T-2 relationship UNAM-Hou. Start network testing Request of jumbo frames support News: UNAMGRID-CA waiting for green light to start operations 11/2/2011Grid of the Americas Workshop15

2008 January 2008 VOBOX migration to gLite 3.1 February 2008 UNAMGRID-CA: accredited by IGTF, start operations More network tests UNAM CERN March 2008 Maintenance of the multimode optical fiber from ICN to campus network,link at 100Mbps. 11/2/2011Grid of the Americas Workshop16

2008 April 2008 Middleware upgrade from gLite 3.0 to gLite 3.1 Testing UNAM-Hou, Jumbo frames support request, next problem: the end point (ICN) is connected at 100Mbps, problematic with existing routing. May 2008 Call to collect information about projects with high BW requirements. 8 projects signed a document to request BW improvement. 11/2/2011Grid of the Americas Workshop17

2008 June 2008 Arrives the first 64bits processors: 16 cores in 2 nodes 30 TB of storage for ALICE and AUGER but no shared with Grid due to BW problem. December 2008 Second E3 to CUDI, duplicated the BW to 60Mbps 11/2/2011Grid of the Americas Workshop18

2009 February 2009 ICN resources create the site: ICN-UNAM Creation of grid.unam.mx domain for Grid resources distributed within the UNAM. Problems renewing certificates from GRIDUNAM-CA March 2009 New worry: ROC-CERN will disappear March 3: The idea is born to create the ROC-LA to support HEP sites in the LCG in Latin America. March 20: UNAM is invited to be certified by ROC-CERN to join the EGEE infrastructure. 11/2/2011Grid of the Americas Workshop19

2009 September 2009 First advice: The 32bits arch will be discontinued from ALICE production sites September 17: New monomode optical fiber, 1Gbps at ICN to DGSCA, including a subnet with 50 IPs Direct link from ICN to I2 with jumbo frames support. September 30:ROC-LA start operations December new 64 bits nodes: Creation of tochtli64 with 40 cores 11/2/2011Grid of the Americas Workshop20

2010 January 2010 UNAM site blocked from ALICE production due to obsolete 32 bits VOBOX. March 2010 UNAM back to ALICE production after install tochtli64 with gLite 3.2. Now all 64 bits, including a CREAM- CE and VOBOX Problems renewing certificates automatically in the GRIDUNAM-CA. 11/2/2011Grid of the Americas Workshop21

2010 June 2010 New cluster, financed by CTIC arrives all 64 bits, 104 cores added to tochtli64 for local and grid use. 11/2/2011Grid of the Americas Workshop22

2010 October 2010 The consolidation of efforts of last years: 1 Gbps link from UNAM to academic networks in USA. 11/2/2011Grid of the Americas Workshop23

2011 Current status Site ICN-UNAM on ALICE and AUGER production infrastructure VO’s supported: AUGER, EELA, BIOMED Certified site on EGI infrastructure through ROC-LA Support of the GISELA applications through EELA VO Up to 146 cores with 64 bits Still operating 32 bits nodes: 18 cores Direct connection from ICN to I2 at 1Gbps with Jumbo frames support 11/2/2011Grid of the Americas Workshop24

Site ICN-UNAM on 2011 tochtli64 11/2/2011Grid of the Americas Workshop25

Conclusions Installing and maintaining a grid site in production is definitely not a one-click process. Double click to install a site 11/2/2011Grid of the Americas Workshop26

The site ICN-UNAM has survived thanks to the really big effort from the UNAM to improve and provide all the necessary infrastructure for the ALICE experiment and the invaluable support from the ALICE Grid experts. 11/2/2011Grid of the Americas Workshop27

Thanks for all the support provided: ICN Director: Alejandro Frank HEP visionary group: Guy Paic, Lukas Nellen, Alejandro Ayala Computer department: Antonio Ramirez CERN Federico Carminati, Latchezar Betev, Patricia Mendez CTIC and CONACyT EELA, CUDI and ROC-LA people We would like to thank the DGTIC (before DGSCA) for their interest and support of the GRID activities in the ICN since the very beginning Director: Ignacio Ania Security GRIDUNAM-CA: Ruben Aquino Telecommunications: Oscar Fermandez, Salvador Cardenas, Hans Reyes (CUDI / UNAM) Supercomputing: Jose Luis Gordillo, Eduardo Murrieta 11/2/2011Grid of the Americas Workshop28

Through 2006 to 2010 several things has been improved and deployed, now we have the conditions to grow up and provide resources to the ALICE Grid. Projects / Applications ALICE, AUGER, HAWC, non HEP Knowledge of the Middleware gLite Grid Infrastructure ROC-LA GISELA Better Network 1Gb/s to I2, Jumbo frames Security GRIDUNAM -CA Tier -1 Supercomputing expertice KanBalam, Bakliz, Mixbaal 11/2/2011Grid of the Americas Workshop29 Our next challenge is large-scale data management at PB scale.

The ICN-UNAM was the first ALICE node in Latin America until 2010 and is interested to be the first Tier-1 for ALICE in the region. 11/2/2011Grid of the Americas Workshop30