PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Advertisements

Managing the Health and Safety of Contractors
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
An Introduction to professional services. The professional services The professional services support businesses of all sizes across the economy, providing.
Note: Lists provided by the Conference Board of Canada
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Lim Sei cK.  There are considerable similarities between the management of projects and of events.  Both are unique, time-limited operations.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Quality Assurance/Quality Control Policy
XII- COST CONTROL, MONITORING & ACCOUNTING
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
UK’s CDM Regulations 2007 and its Applications in Singapore
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Health & Safety Risk Assessments.
Release & Deployment ITIL Version 3
Risk Assessment – An Essential Standard
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Architect By: Chia-Jade Lee & Chloe Horgan By: Chia-Jade Lee & Chloe Horgan.
Occupational Health and Safety
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Constructionsite Roles in Construction Ron Gatepain.
Construction Contracts and Project Delivery Methods
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
TECHNOLGICAL DESIGN Architectura l Design Process.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Specification & Quantities Estimating
Fundamental Skills The skills needed as a base for further development You will be better prepared to progress in the world of work when you can: Manage.
Operations Defining Operations What about Quality Planning your Operations Laws and Regulations Health & Safety Regulations.
An Architect works to make designs for new buildings and the spaces around them. Working closely with users, clients and officials to make sure that projected.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Overall Quality Assurance, Selecting and managing external consultants and outsourcing Baku Training Module.
Monitoring & Evaluation. Objective Learn the why, what and how-to approach to monitoring Review monitoring techniques and define the roles monitoring.
Practice Management Quality Control
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
IT Job Roles & Responsibilities Shannon Ciriaco Unit 2:
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
A European campaign on Risk Assessment Common errors in Risk Assessment.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
Coordinate On-The-Job Instruction Rick Bough Sarah Britton.
Fundamental Skills The skills needed as a base for further development You will be better prepared to progress in the world of work when you can: Manage.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
MARSVILLE What does Mars look like? Could there be life on Mars?
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Greg Baker © Part One The Foundations – A Model for TQM Chapter # 1 Understanding quality.
CDM Construction Design and Management
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
DIPLOMA IN CONSTRUCTION AND THE BUILT ENVIRONMENT.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Roles and responsibilities PM
Chapter 33 Introduction to the Nursing Process
The Design Team Carl James.
BSBWOR301 Organise personal work priorities and development
RIBA Plan of Work 2013.
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
BTEC Health and Social Care L3
Chapter 4 Instructional Media and Technologies for Learning
RIBA Plan of Work 2013.
CEng progression through the IOM3
Presentation transcript:

PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016

PROJECT CONCEPTION AND MONITORING 1.0INTRODUCTION Project monitoring is the process of monitoring the construction work to ensure that the Contractor adhere strictly with the specification and the project is delivered at the appropriate time. Before the commencement of the construction work however, certain activities ought to have taken place. These are enumerated below; Every construction project takes the work of several different parties. Here are the main players, all of whom offer different jobs in construction. The construction process starts when the client decides there is a need for a project. 2

1.1PROJECT PREPARATION The client decides what they want to build, when they need it to be finished and how much they are prepared to pay. They usually employ a number of consultants to produce designs and estimate costs. The client will also have to obtain planning permission for the project and may need to purchase land or make legal agreements with other interested parties. As construction proceeds the client pays the contractor, as well as the other organizations involved, for the work they have done. Queries about the shape, size or colour of the building will be answered and other information will be given to those carrying out the work. The client will also make preparations to take over the finished project (for example, to move occupants and furniture into a completed building). 3

The Consultant: designs the project. Clients often employ consultants quite early in the project to advise them on design and cost matters. Consultants are usually employed for their expert knowledge in a particular field, for example, planning regulations, the design of a project, health, safety and welfare regulations or costing. Consultants commonly involved in construction projects: Architects: Architects are involved in designing the aesthetic appearance of buildings and the way in which internal spaces are arranged to ensure that the building meets the functional requirements of the client. The architect will often lead and co-ordinate the activities of the other consultants and be responsible for ensuring that the building complies with the conditions of planning permission. 4

Structural Engineers: Structural Engineers are responsible for designing the structure and foundations that support the various loads on a building, including people, furniture, fittings, vehicles and machinery. Structural engineers also ensure that the building will withstand all the elements. Electrical/Mechanical Engineers: Electrical/Mechanical Engineers design the systems within the building that control the internal environment. These include heating and ventilation, water supply and drainage, lighting, power supplies and telecommunications. Cost Consultants: Cost Consultants (often referred to as Quantity Surveyors) prepare estimates of how much projects will cost to build and monitor the actual costs during construction. They also review the tenders from contractors and advice the clients on which contractor should be employed for the construction work. 5

The Contractor: The Contractor is responsible for the construction work. Once sufficient design information is available, the client’s consultant team will issue tenders to contractors, who then submit a price or bid for building the project. The contractor’s main task is to complete the project in accordance with the design, to the required quality, in the time allowed and for the agreed price. Responsibilities also include the safety, health and welfare of the workforce and the public, the protection of the environment and minimizing disruption. Main contractors are responsible for the whole of a project and rarely have all of the skills necessary to build every part of a complicated building or structure. 6

Subcontractors are employed by the main contractor for parts of the project such as structural steelwork, foundation piling, roofing, cladding, plumbing and electrical work. Many subcontractors have specialist design knowledge of their area of work that consultants are not familiar with. These subcontractors are often given some design responsibility to make sure that the details of their part of the project successfully integrate with the other parts of the project design. After the completion of documentation work, the actual construction work begins. 7

1.2PROJECT MONITORING Monitoring is the regular observation and recording of activities taking place in a project. It is a process of routinely gathering information on all aspects of the project. Monitoring is a necessary core management instrument, both for projects that might be encountering problems and for projects which are encountering particular success. Monitoring is critical to all projects. Each project should have embedded internal project monitoring arrangements to check progress / achievement of milestones, identify problems, recognize the need for change / amendment / development and ensure quality. Monitoring is therefore to be perceived as a positive and constructive activity supporting the project and helping it to realize its objectives. 8

To monitor is to check on how project activities are progressing. It is observation; - systematic and purposeful observation. Monitoring also involves giving feedback about the progress of the project to the management and beneficiaries of the project. Reporting enables the gathered information to be used in making decisions for improving project performance Purpose of Monitoring: Monitoring is very important in project planning and implementation. Monitoring provides information that will be useful in: 9

Analyzing the situation in the project; Determining whether the inputs in the project are well utilized; Identifying problems facing the project and finding solutions; Ensuring all activities are carried out properly by the right people and in time; Using lessons from one project experience on to another; and Determining whether the way the project was planned is the most appropriate way of solving the problem at hand. 10

THANK YOU ALL FOR YOUR ATTENTION 11