New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET E-SHOP.
Advertisements

ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
WAREHOUSING MANAGEMENT
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
The online system is an award Winning Online Registration and Management Facility. It is wholly Australian Owned and.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Design Review: November 17,2011 Team Members: Allan Davis Carlos Gonzalez Cooper McBride.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Herschel / HIFI 1.Status mirrors FM/FS 2.Status COA QM 3.Status COA FM 4.Financial situation COA FM 5.Status MSA FM/FS.
1 December 17, 2007 Visit Bakelite manufacture – Li Shen Wood Product Inc. Jiawen Zhang, IHEP Changguo Lu, Princeton University.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
Development and Quality Plans
CMS - PAVIA1 Engineering Design Review RPC - BAKELITE.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Aluminum bellows for experiments
Renewable energies The Italian experience in Photovoltaics Paolo Zavatta ANIE/GIFI – Member of the Board Renewable energies The Italian experience in Photovoltaics.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
Food and Beverage Management
1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Situation with industry Rui de Oliveira RD51 CERN October
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Baby-Mind Magnetic Module Design A. Dudarev, G. Rolando, E. Noah, H. Pais Da Silva and H.H.J. ten Kate Baby-MIND update meeting #1 July 29,
CBM -Russia meeting, ITEP, 5 November 2004 DEVELOPMENT OF LOW RESISTIVE GLASS FOR HIGH RATE RPC F.Guber, INR, Moscow C B M.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
G. Carboni – Muon Meeting – RPC situation: RPC production in GeneralTecnica (GT) has suffered large delays, due to gluing problems (spacers)
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
Lesson objective – to understand what is meant by one-off, batch and mass production Textiles – Production Processes.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
Baby MIND magnet design or “how to best magnetise a steel plate” Alexey, Etam, Gabriella, Helder, Herman Baby Mind Magnet CERN June 10, 2015.
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
ELearning / NA Systems Analysis Laboratory Helsinki University of Technology Case description: Problem of buyer and seller  These slides contain description.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Updated Resistivity measurement on Mm-Batch-4 Bakelite & RPC Bakelite sample measurements Liang Guan TGRPC R&D Biweekly meeting
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 3 OF 10 The Order Process SPONSORED BY:
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
Resistive Plate Chambers for CMS and INO
Phenolic glass based materials for the RPC electrodes RPC2016 Het Pand GENT R. Santonico INFN and University of Tor Vergata, Rome, Italy On behalf of the.
GT expedition to check on PU contamination as reported by KODEL Paolo Vitulo Ian Crotty 23/4 February 2012.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
WJEC Past Paper Questions (with answers)
AND AFTER INSTALLATION Technical Director, NASSCO
University of Wisconsin
Update on Pavia MM mechanical prototype
Production ad Quality control of RPCs for the CMS muon barrel system
PASSIONATE ABOUT YOUR PRODUCT AVAILABILITY
RPC HV&LV status Introduction HV power supply tender
FY 08 Facilities Department Budget Proposal January 25, 2007
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Competitive Industry Report and Calculations
Viseum UK support infrastructure
1st solution. Cut internal to the plate with startup hole
Presentation transcript:

New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November 26 th 2014

Index Bakelite production facilities in Puricelli Quality control in Puricelli and INFN PV New Production constrains Tentative schedule Preliminary cost estimation Conclusions

Bakelite production facilities in Puricelli Puricelli production site in Costamasnaga (Milan- Italy).

Bakelite production facilities in Puricelli Large Craft Paper deposit, meaning possibility to store similar quality batches in safe environment and negotiate the costs

Bakelite production facilities in Puricelli Industrial production line for Craft paper treatment with phenolic resin. Not suitable for our application in RE4 On the back: Industrial production line for Craft paper treatment with melaminic resin Used for RE4 production

Bakelite production facilities in Puricelli Large size pressing unit, dedicated for CMS RE4 production (one of the 5 available in this site) 10 pressing slots for production of 5 panel each: total production in single pressing action = 50 panels

Quality control in Puricelli and INFN PV 7 Automatic Resistivity System located at INFN Pavia  Manual Bakelite panel edge resistivity measurement in Puricelli  Automatic Bakelite panel full size resistivity measurement in Pavia  Study of bakelite resistivity uniformity  Being discussed if moving at CERN or in Puricelli site 7

New Production constrains Kraft paper Minimum quantity to buy : 2-3 pallets of Kraft paper 1 pallet = 2250 kg, about 1600 foils 2 mm panel = 11 foils, 1 pallet = about 145 panels Agreed with firm that THEY buy and store it Panel production For CMS resistivity range (1-6 x Ohm cm) we have to produce 50 panels For new resistivity ranges (0,5-1 x Ohm cm), still under discussion the minimum amount of panels to be produced (rest of press slots used with other phenolic material for different application) Agreed with firm to provide a price list for each panel vs panel quantity and resistivity range

Tentative schedule Kraft paper 2-3 pallets being delivered 2 months after the order reception Bakelite panels Driving element is the shine plates to be installed in the pressing unit. They do not install plates for just one production (even for a full press of 50 panels !). We have to wait for them to receive and group at least 10 pressing actions Once we have this condition we can have the panels in 1-2 days

Preliminary cost estimation Kraft paper 1 pallet = 4.5 keuro 2-3 pallets (being negotiated with krafr paper supplier) = keuro Bakelite panels Standard resistivity Panel thickness Panel thickness 1,5-1,8 mm thickness = 27 euro/m 2 1 panel = about 5 m2, meaning 135 euro Minimum amount = 50 panels, meaning 6,75 keuro New resistivity (0,5-1 x Ohm cm) Panel thickness 1,5-1,8 mm thickness) = euro/m2 (to be confirmed) 1 panel = about 5 m2, meaning euro Minimum amount of panels being defined according to their plan for other material with phenolic paper (10-50, meaning keuro) Costs to be added : Cutting, Brushing in GT, + trasports Deleted To be updated vs new price list

Conclusions Controlled resistivity bakelite industrial partner is a solid team Riva & Puricelli showed their solid cooperation in RE4 mass production To secure some new panels in february 2015 we need to: -Buy immediately craft paper (firm costs) -Order 50 panels in standard resistivity (1-6 x Ohm cm), thickness 1,5- 1,8 mm, 7 keuro -Order (being discussed) Panels in lower resistivity (0,5-1 x Ohm cm), ?? keuro thickness 1,5-1,8 mm ( 3-10 keuro, depending from the # trials and panel amount for each trial) + cutting, brushing, transport Total budget about Depending from firm price list expected in these days Delivery time february 2015 ( to be confirmed )