Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.

Slides:



Advertisements
Similar presentations
U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Advertisements

STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Undergraduate Renewable Energy Courses and Certification Tests John Martini University of Arkansas – Fort Smith ASSET II Annual Meeting Springdale, AR.
Building Energy Rating
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Building Energy Efficiency By Doug Horn. Agenda Introduction Why Focus on Buildings? ecoEnergy Retrofit Homes Program Energy Efficiency Measures Renewable.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Modine 93% Separated Combustion Condensing Unit Modine’s Breakthrough Solution to Commercial Heating.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
ORNL ESPC Overview GovEnergy ESPC Project Summary  $89M project funded by $8.2M in guaranteed annual savings  Energy Conservation Measures: 1.Select.
April 25–27, 2005 Phoenix Civic Plaza/Hyatt Regency Phoenix Phoenix, AZ NCMA World Congress 2005 “Prime Time: Contract Management at the Core of the Enterprise”
Energy Conserving Alternatives HVAC 15a CNST 305 Environmental Systems 1 Dr. Berryman.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Eastern Illinois University Energy Conservation and Sustainability Program December 11, 2007 Lt. Governor Pat Quinn Sustainable Government Symposium IDNR,
October 2007 Energy Efficiency Partnership For Greater Washington.
Madeira’s path through Energy Conservation and a Power Purchase Agreement Making Solar Pay Presented at: OSBA Capital Conference November 8, 2010.
1 Progress Toward Sustainability at Williams College.
1 Progress Toward Sustainability at Williams College.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Cogeneration / Distributed Generation Proposal Oakland University.
Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.
Green Building Demonstration Project Adam Saling City of San Diego.
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
New Mexico State University EFFICIENT RESIDENTIAL ENERYGY Fahzy Cooperative Extension Service ______ County.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
National Trust energy approaches. –
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Green Universities and Colleges Subcommittee March 16, 2011.
West Hartford Clean Energy Task Force September 8, 2009.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Rob Detta Colli, TowerWise Conservation Incentives Advisor Keeping your dollars in your pocket.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
Btec level 2 Construction UNIT 3 Sustainable Construction-energy use.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
E NERGY P ERFORMANCE C ONTRACTING : Financing Energy Performance Improvement Projects Patricia Gómez PE, CEM, LEED AP Office of Sustainability Miami-Dade.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Energy Conservation Building Upgrades Alma School District.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
1 Town of Dedham Energy Saving Performance Contracting.
NM Infrastructure Conference 2012 Creating a Greener Sustainable Community ‡ Planning for Energy Efficiency.
McGuire Sponsel, LLC s p e c i a l t y t a x s e r v i c e s Federal Tax Incentives for Green Building Design and Construction Alternative Energy Tax Credits.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
The Energy Efficiency and Solar Nexus:
Fort Stanwix National Monument Energy Audit Contract
Gary Nower – Wilfrid Laurier University Edward Ng – EY
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
UMCP Learning Objectives
bre Innovation Park Visitor Centre:
Grunenwald Science and Technology Building
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
Energy Saving Concepts and Opportunities in Foundry (A case Study)
Presentation transcript:

Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED AP Ryan Malin, PE, LEED AP

 MEP/FP Engineering  Information Technology  Lighting Design  Commissioning  Code Consulting  Analysis & Testing  Controls  Critical Systems Design  Sustainable Design  Energy Auditing & Modeling  MEP/FP Engineering  Information Technology  Lighting Design  Commissioning  Code Consulting  Analysis & Testing  Controls  Critical Systems Design  Sustainable Design  Energy Auditing & Modeling AKF Introduction Comprehensive Services/Core Values

Various Projects New Building/Major Renovation School Work

On-Call Engineering Work Various School Districts

NYCSCA PS 62R – Net Zero Energy School Staten Island, NY

AKF Scope of Services for Woodbridge Review Previous Reports Prepared Determine Existing Energy Consumption Infrared Scanning of Existing Building Façade Identify Energy Conservation Measures (ECM’s) Evaluate Renewable Energy Options Explore Alternate Financing Options Prepare a Phased Capital Infrastructure Strategic Plan Develop a Scope of Work for a Renovation Project Developed Design for Mechanical Systems Upgrade Consultation Services during ESCO RFQ/RFP Phase

Electrical Usage:

Existing Building - Energy Load Profile

Full Building Air Conditioning – Alternate Schemes Full Building Air Conditioning Alternate Schemes ElecOilGas Annual Energy Cost Energy Cost Savings versus Base Building Energy Cost Savings versus Hi-Eff'y System $KWH$Gallons$Therms$%$% Base Building w/Full Air Conditioning $ 438,745 2,217,298 $ 163,336 59,830 $ 602,081 n/a High Efficiency Gas Boiler & Air- Cooled Chiller $ 404,850 2,036,039 $ 93,813 78,178 $ 498,663 $ 103, % n/a Geothermal Heat Pump System $ 479,218 2,440,209 $ 3,756 1,376 $ 482,973 $ 119, % $ 15, % ENERGY CONSUMPTION WITH FULL AIR CONDITIONING

Thermal Infrared Scans Image of Façade in A, B & C Wings The 1960’S original building façade is failing. Single pane windows, with metal frames. Failed caulking.

Thermal Infrared Scans Images of Soffit Vents on S Wing Soffit vents purpose is not understood. It is a significant source of heat loss.

Energy Conservation Measures ECM’s Building Envelope Improvements Replace Oil Boilers w/Hi-Eff’y Natural Gas BMS Controls Lighting Controls Micro-Turbine Solar PV Panels Wind Turbine Power

Capital Projects Capital Project Construction Cost Rebate Incentives Tax Credits Net First Cost Annual Energy Savings Simple Payback Lighting Controls $ 125,000 $ 78,983 $ 38,000 $ 8,017 $ 60, Replacement Gas Boilers $ 184,100 $ 73,640 $ 69,960 $ 40,500 $ 79, BMS Controls Upgrade $ 350,000 $ 140,000 $ 95,000 $ 115,000 $ 27, Micro-Turbine $ 300,000 $ 63, Wind Turbine $ 100,000 $ 48,000 $ 52,000 $ 10, Solar Photovoltaic Power $ 1,250,000 $ 600,000 $ 650,000 $ 68, Geothermal $ 954,100 $ 457,960 $ 496,140 $ 58, Solar Thermal $ 120,000 $ 57,600 $ 62,400 $ 1, Mechanical Systems Upgrade $ 4,838,000 $2,322,240 $2,515,760 Curtain Wall Replacement $ 623,000 $ 13, Roof Replacement $ 629,400 $ 28,

Capital Projects Recommendations Full Building Air Conditioning – Hi-Eff’y Boiler-Chiller Option: Full Replacement of Mechanical Systems Unit Ventilators, AHU’s, RTU’s Boiler Plant Upgrades: Replace boilers with (2) new 2000 MBH input gas-fired condensing boilers Provide New Chiller for Full Building Air Conditioning Maintain existing piping, convert existing hot water piping to dual-temperature hot/chilled water distribution to new units. BMS Upgrade Lighting Controls Roof Replacement in Original Building Curtain Wall Replacement in Original Building Renewable Energy – Solar PV Panels Microturbine Cogeneration

Explored Energy Performance Contracting Benefits: Potential to Realize Tax Incentives Guaranteed Energy Savings Guaranteed Contract Price – (i.e. no change orders) Guaranteed Performance of Systems Issued RFQ for ESCO’s: Received Qualification Packages from 4 Energy Service Companies CCM Energy, Energy Systems Group (ESG), Honeywell, Source One Issued RFP for ESCO’s: Shortlisted ESG & Honeywell Received 2 Competitive Bid Investment Grade Audits

SET SIGHTS HIGH:  Opportunity of Achieving a High Performance Building  Qualifying for Section 179d tax incentive.  Leave a Legacy for Community Executive Summary:

Infrastructure & Energy Upgrade Presentation Thank You! Town of Woodbridge – Beecher Road School