Sensors and Bump Bonding Outlook 2008. Fadmar Osmić – NA62 GTK Meeting, January 29, 2008 -2- Sensors Layout of the sensor wafer needed for the demonstrator.

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 02 March 2007.
Advertisements

Progress with the 3T Demonstrator Proposal A.Marchioro CERN April 2010.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
LOW COST AND LOW MASS BUMP BONDING SAMI VAEHAENEN – CERN PH-ESE 1.
1 Generic Silicon Detector R&D Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
Irradiation at IUCF We irradiated 5 chips from Sintef wafer 9 (7,39,42,44,46) at Indiana University Cyclotron Facility on 30th November. Pixel 7,44 and.
Bias Ring Current Carl Goodrich 2/26/08. Carl Goodrich- VELO Meeting2 Sensor: Measurement: IV Data from December V bias Ground.
Measurement at -5 and -10 C Leakage current and depletion voltage of the irradiated chips were measured at -5 C and -10 C.
20th RD50 Workshop (Bari)1 G. PellegriniInstituto de Microelectrónica de Barcelona G. Pellegrini, C. Fleta, M. Lozano, D. Quirion, Ivan Vila, F. Muñoz.
Status and outlook of the Medipix3 TSV project
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
J. Salonen, “Flip Chip Bumping Process at VTT" [presentation for GPG], 16-March-2007 Flip Chip/Bumping Process at VTT Last modified March 16, 2007 By Jaakko.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
3D Integration activities AIDA WP3 Frascati 2013 Abdenour LOUNIS, AIDA Frascati 2013 Abdenour LOUNIS, G. Martin Chassard, Damien Thienpont, Jeanne Tong-Bong.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
Tracker Upgrade Week –Sensors Meeting Sensor Production 24. July 2014 Marko Dragicevic.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
January, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm =
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Pixel 2000 Workshop Christian Grah University of Wuppertal June 2000, Genova O. Bäsken K.H.Becks.
Tom McMullen Period 3 Week 9 8/4/2013 – 12/4/2013.
Estimated schedule, costs and number of ABC130 needed Tony Affolder.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Background Overview of the work Secondments, conferences.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
24 March 2014 The ups and downs of the MaPSA project March
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
1 CiS Forschungsinstitut für Mikrosensorik GmbH Ongoing R&D Activities at CiS Forschungsinstitut für Mikrosensorik: Bump Bonding Sabine Nieland,
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Roadmap to the next 2015 run F. Marchetto GigaTracKer Working Group meeting Dec. 9 th 2014 a)Introductory meeting on Nov. 27, 2014 b)At that meeting several.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Bump-bonding: offers F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra and Massimiliano.
UPDATE ON CLICPIX2 DESIGN Pierpaolo Valerio Edinei Santin
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
CERN MIC Support for HEP Microelectronics Designers A. Marchioro / CERN-PH EUDET Meeting - December 14 th 2005.
2/5/06G. Stefanini/P326 SPC Ref/GTK WG1 Progress on Gigatracker Pixels Sensors Bump bonding Pixel ASIC and readout electronics Detector configuration Cooling.
Performance of Silicon Pixels at -5 & -10 C after Radiation Daniela Bortoletto Gino Bolla Amitava Roy Carsten Rott.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Latest news on 3D detectors IRST CNM IceMos. CNM 2 wafers fabricated Double side processing with holes not all the way through, (aka Irst) n-type bulk.
R. Bradford 3 February,  BNL offered to share 4” wafer. We purchased ¼ of the wafer with the remainder being used for silicon drift detectors for.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
1 May, 2009 Ladislav Andricek, MPI für Physik, HLL Interconnection Sensor - ASICs SuperBelle (and ILC) Ladder: -: MCM – ASICs in different technologies.
Page 1 Liverpool January 11th, 2012 LHCb Upgrade Meeting Planar Silicon Detectors I. Tsurin Generic sensor R&D ATLAS-oriented commitments LHCb-oriented.
HV2FEI4 and 3D A.Rozanov CPPM 9 December 2011 A.Rozanov.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
New Mask and vendor for 3D detectors
Available detectors in Liverpool
3D/Active edge sensors with FBK
Summary of discussion in 3D Design Group during ITk Week
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Hybrid Pixel R&D and Interconnect Technologies
Highlights of Atlas Upgrade Week, March 2011
detector development readout electronics interconnects bump bonding
Sensor Wafer: Final Layout
Peripheral IP blocks per chip “Superstrip”
Track Trigger Meeting 1/17/2013
P326 Gigatracker Pixel Detector
WP4 Dave Bailey 5th May 2006.
Presentation transcript:

Sensors and Bump Bonding Outlook 2008

Fadmar Osmić – NA62 GTK Meeting, January 29, Sensors Layout of the sensor wafer needed for the demonstrator chip –Foreseen one mask-set which contains 1 large sensor (60 x 27) surrounded by demonstrator-like sensors Discussion with ITC-irst planned for spring –First ideas on the layout –Guard ring designs –Pre-bumping testability (bias-grid, all-al, …)? Estimated Costs –Total costs (mask+1batch) ~40kCHF

Fadmar Osmić – NA62 GTK Meeting, January 29, Bump-Bonding Meeting with VTT for first discussion –Hopefully possible mid February (week 8) at CERN - tbc Discussion topics: Development of the FC Bonding technique of the GTK demonstrator –Reminder: No thinning needed Problem: no full size wafers (MPW), standard FC-technique not available!!! –Timescale: this year  technique necessary for the demonstrator beginning 2009 –Two options suggested by VTT Gold-wire stud bonding with epoxy (VTT Oulu) single ball placement (German company) –Topology (where should the contact pad be located in each pixel) and acceptable pad-size should be clarified before the discussion –Costs ???