200 kT Water Cherenkov Detector Vessel Liner 50% Conceptual Design Review.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Municipal Solid Waste Defined in 40 CFR Part 258.2
MAJOR PROJECT: warehouse/office
Haivan Pass Tunnel Construction Project
Company Profile.
Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
Secondary Containment: From A Contractors Point of View.
FIGURE 13-1 Simplified cross section of a hazardou s waste landfill with details A and B.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
RESEARCH PROGRAMS Culvert Liners High Value Research Sue Sillick Montana Department of Transportation July 2011.
 Geosynthetics include a variety of synthetic polymer materials that are specially fabricated to be used in geotechnical, geoenvironmental, hydraulic.
Landfill : A waste containment facility.
Jan Bremert Technical Director Tba International GmbH & Co. KG Fabersweg Norderstedt Germany Phone.: Fax:
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Foundation Systems.
G3 – Environmental Geomechanics (Dr Sam Yuen)
CONTAINMENT CONTROL SYSTEMS
How do you simplify? Simple Complicated.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
LINER AND COVER CONSTRUCTION BASICS Presented by: Curt Ahrendsen, Principal American Environmental Consulting AEC.
UNO Cavity Liner System: Status Report and R&D Proposal D. Warner Colorado State University October 16, 2004.
Deferred Maintenance CFAA Conference Presented by: Paul Belanger P.Eng., Belanger Engineering Bill Zigomanis, Boardwalk REIT Ivan Murgic, Greenrock Property.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
LBNF status. Process to chose 2 SPs Candidates who accepted (vote starts the 27 th ) : Milind Diwan Chang Kee Jung Sanjib Mishra Andre Rubbia Jim Strait.
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Cold Magnetic Shield Update
 Can you list a few potential benefits of growing plants in a greenhouse?  To control environmental factors such as: Light Temperature (Heating and.
High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone:
Eastside Reservoir Site Drainage and Leakage Issues Attachment 4A.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
5 December 2011 Task 2 Cavern Study Ground model and 3D cavern layout Matt Sykes Eden Almog Alison Barmas Yung Loo Agnieszka Mazurkiewicz Franky Waldron.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Use of Geo-composites to Optimise Track Renewals and Maintenance.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Brick Township Landfill Superfund Site REUSED - Solar Panel Field Jon Gorin – EPA Region 2.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Water containment and PMT deployment designs for the LBNE water detector Jim Stewart BNL August 2012 J Stewart BNL August
C.I.Agent ® Polyvinyl Blanket A Spill Containment and Hydrocarbon Filtration Solution.
Building Resource Inc. Sustainable Durable Buildable Cost Effective
Construction Inspection for FO Activities - Geosynthetics
DIAPHRAGM WALLS.
Technodyne International Limited C967 - LAGUNA LBNO LENA LSc Tank Design Update 2 Robin Atkinson LAGUNA LBNO General Meeting 1st –
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Chapter 16 Landfill Liners and Geosynthetics
Water Booster Station Improvement Study
FCC Underground Infrastructure
Design and Construction of Composite Lined Landfills
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Innovative tunnel waterproofing technology
$150K Chicago/ANL seed funding for Braidwood site investigation
INSTALLATION SEQUENCE
Nuclear Power Update for The Society of American Military Engineers
17.7 Single Clay Liner and Single Geomembrane Liner Systems
Fire Hose, Nozzles, Streams, and Foam
Landfilling (Containment and Restoration) in Ireland
NAF ProCap Water Mirror concept
STEEL PLATES.
Bunker Wall Design Wall ESS
Waterproofing Simplified
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

200 kT Water Cherenkov Detector Vessel Liner 50% Conceptual Design Review

Outline Vessel Liner Background CNA Phase 2 Recommendation Key Concerns Conceptual Vessel Liner Design Comparative Leakage Rates Constructability Testing August 2, 2011

Vessel Liner Background Initial Options Free-standing Rock-supported Pressure-balanced Phase 1 Down-select to 2 options: 2A: Rock-supported, cast-in-place concrete vessel 1E: Free-standing steel vessel August 2, 2011

CNA Phase 2 Evaluation Eliminate Option 1E Add Option 2C: Rock-supported with liner directly on shotcrete Both have drainage layer(s) behind waterproofing membrane Experiment water and native groundwater separated August 2, 2011

CNA Phase 2 Options August 2, 2011 Concept 2C Concept 2A

Option 2C Floor Detail August 2, 2011

Key Concerns Drainage Layer Facilitates Leakage Liner Penetrations Complexity of Design CQA August 2, 2011

Conceptual Design Tasks Review previous work Recalculate for 200 kT WCD Research alternatives High head Leakage control Seaming Attachments to vessel Assume polyethylene in contact with water August 2, 2011

Recommended Conceptual Design A August 2, 2011 Exp’t Water Membrane GCL Shotcrete Mag. Coils Excavation Damage Zone GW Control

Geosynthetic Clay Liner August 2, 2011 Geotextile Bentonite HDPE Geotextile

Recommended Conceptual Design B August 2, 2011 Exp’t Water Membrane Concrete Mag. Coils Drainage Layer Excavation Damage Zone GW Control Shotcrete

Concept A Floor Detail Membrane GCL Shotcrete Mag. Coils Concrete Drainage Layer Sump

Conceptual Panel Layout August 2, 2011 Floor Walls

Panel Mounting Options August 2, 2011 “Velcro” Polyethylene Plate

Conceptual Design Features Leakage minimized 3-6 orders of magnitude Simplified construction Minimized penetrations for attachment Smooth walls to minimize strain on membrane August 2, 2011

Testing Material compatibility Liner lifetime Liner creep Leak testing Seams Penetrations Water interactions August 2, 2011