FRCC Voice Communications OBJECTIVES FRCC Regional Voice Communications Procedure – Review the New FRCC Handbook Document Review Voice Comm. Requirements.

Slides:



Advertisements
Similar presentations
SCO 3 Crewing Optimization As-Is Processes January 9, 2006
Advertisements

NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
NAESB Coordinate Interchange Standard, Version 1 / 0
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
POTF Status update.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Presented at the 2006 CLEAR Annual Conference September Alexandria, Virginia Disaster Preparedness II: Planning for the Future By Deidre Gish-Panjada.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
COM Operating Personnel Communications Protocols
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Notice of Compliance Audit
Spring 2015 TELPAS Holistic Rating Training System
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Solution Overview for NIPDEC- CDAP July 15, 2005.
Sources and screens applicant resumes for qualifications Other General Responsibilities: - Virtual Recruiter acts as primary point of contact to candidate,
ERCOT 2013 Winter Storm Drill (WSD) Summary Brian Barcalow Training Specialist, Sr.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Operating Topics Part 1 Mike Oatts May 9, 2008 Transmission Customer Forum Destin, Florida Part 1 Mike Oatts May 9, 2008 Transmission Customer Forum Destin,
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Peak RCCo Performance Metrics Draft –November 2013.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Effective Communications and Declaring EEAs 2016 System Operator Seminar.
® July 30 th, 2014 Utah PSC Technical Conference.
From Policies to Programs to Practices Establishing the Green Infrastructure Eric Friedman Director of State Sustainability Mass. Executive Office of Env.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
ERCOT 2014 Hurricane Drill (HD) Summary Brian Barcalow Training Specialist, Sr.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Emergency Preparedness Susan Albrecht, MS, RD, LDN Centers for Medicare & Medicaid Services May 5, 2011.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
WA GEAR UP. Individual settings are recommended for some supports Separate test sessions are not required for students with a PNP For paper-based testing,
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 Summary of TAC Procedures for COPS & PRS May 17, 2005.
Communications Operator Training Seminar 2016 Brian Legg & John Jarmon System Operations Training (ERCOT)
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
NERC Lessons Learned Summary
Transmission Outage Coordination
Pseudo-tie business procedure
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Coordinate Operations Standard
Pseudo-tie business procedure
SPP West Shadow Operations
Presentation transcript:

FRCC Voice Communications

OBJECTIVES FRCC Regional Voice Communications Procedure – Review the New FRCC Handbook Document Review Voice Comm. Requirements (What) Review Voice Comm. Procedures (How) 10AM RC Reliability Call – Open Discussion New Hotline Provider – Troubleshooting RC Communications – Directives vs Requests (Voluntary) Voice Communications

FRCC Regional Voice Communications Procedure The Procedure Applies to: RC / BAs /TOPs – Control Room Phones – FRCC Hotline – Satellite Phones Voice Communications

Periodic Conference Calls – RC - Coordinates and Performs Roll Call Real-Time Discussions – – ON the Hotline Hotline Users – Identify the Entity you Represent (minimum) Keep Comm. Facilities “in-service” Language (English) Voice Communications REQUIREMENTS

Operating Reserve Calls – – Initiated on Hotline by Deficient Entity (ASAP) – Enter Reserve Request into EMS – Acknowledge Reserve Call Entity Name Amount Reserves Providing Acknowledge means: “Reserves in your EMS” – RC Ensures Participants and Amounts are Corrects. Voice Communications REQUIREMENTS (cont)

PROCEDURES: 3-WAY COMMUNICATION Initiator: – State Directive / Message with Detail Receiver: – Listen and Repeat Directive / Message Initiator: – Confirm Directive / Message Understood – If NOT…Repeat Directive / Message Voice Communications

PROCEDURES: COMMUNICATION OUTAGES Planned – Notify the FRCC RC Prior – Agree on Back-up Communication Method w/ FRCC RC and Neighbors – (Post Notifications on FTMS) Unplanned – Notify the FRCC RC ASAP – Agree on Back-up Communication Method w/ FRCC RC and Neighbors – Proceed with Repair – (Post Notifications on FTMS) Voice Communications

PROCEDURES: LOSS OF HOTLINE Hotline Down – Post a Message on FTMS – RC Determines Those Affected – RC Determines Preferred Alternate Communication Method – Entity Determine Alternate Communication Method for Neighbors – Proceed with Repair Voice Communications

FRCC Hotline – Sprint (New Single Provider) Trouble Ticket Contact Information If there is a problem with the FRCC Hotline any location may call Sprint to open a trouble ticket to have the problem corrected. The Customer Name is Florida Reliability Coordinating Council (FRCC) The Sprint Private Line # is The Sprint support line for the FRCC Hotline: Private Line # and Street address of Location Should be Enough to Open Trouble Ticket…. Voice Communications

PROCEDURES: LOSS OF ALL CONVENTIONAL VOICE COMMUNICATION Phones & Hotline Down If you have the Problem - Post a message on the FTMS…Along With Alternate Numbers, etc. Use the Satellite Phone to Notify RC RC Will be Proceed on Identifying All Affected Entities If Single Entity.. Agree on Alternate Comms. Voice Communications

PROCEDURES: LOSS OF ALL CONVENTIONAL VOICE COMMUNICATION (cont) If Multiple Entity Comms are Down, the Satellite Phones will Become Primary and FTMS should be used to Provide Status of Affected Parties and Alternate Numbers (cell phones, working numbers etc.) The Important Thing is to: Agree on Back-up Communication Method w/ FRCC RC and Neighbors …Ahead of Time …Before you Need to Talk Voice Communications

PROCEDURES: HOTLINE RELIABILITY CONFERENCE CALLS RC Coordinates Calls (roll call) Any Entity Can Request Conference Call Today Calls are the 10:00 AM (ORS Sets a Schedule Under RC Recommendation) – Daily Capacity Assessment – Discuss Potential Reliability Issues – Discuss Mitigation Strategies – Questions Voice Communications

PROCEDURES: HOTLINE RELIABILITY CONFERENCE CALLS (cont) Serve to Test Hotline Identify Issues in a Non-Urgent Manner Create Discussion / Maybe a Solution in Non-Urgent Manner Agree on Mitigation Ahead of Time Voice Communications

Discussion ! - 10AM Conference Calls 10AM RC Reliability Call – ( Open Discussion) – Provide Feedback to RC – Effectiveness of Calls – Any Changes Needed – Questions or Clarifications? Reliability Coordinator Topics

PROCEDURES: SATELITE PHONES Used on Loss of All Conventional Means of Communicating Protocol is Important (“over”) Test Weekly (or as Needed) Basic Procedures on Using – When you need it is NOT the time to test it and become familiar with it … Voice Communications

DIRECTIVE vs REQUEST for VOLUNTARY ACTION Request is suggestion for Voluntary Action – Coordinated among RC and affected entities – Based on RC / TO / BA analysis of mitigating options – TO / BA has decision authority Directive – RC has decision authority – Not Optional Unless the Directive Would: Violate Safety Violate Equipment Ratings, Violate Regulatory Requirements Violate Statutory Requirements Reliability Coordinator Topics

RC DIRECTIVE or REQUEST (Voluntary)? RC: “The Lake Agnes/Osceola line is Approaching 100% and the GSF’s indicate that a reduction in Polk generation would reduce the flows. Can you reduce generation at Polk?” Directive or Voluntary? Voluntary !! Reliability Coordinator Topics

RC DIRECTIVE or REQUEST (Voluntary)? RC: “The Lake Agnes/Osceola line is at 105%. Reduce the Polk Generation by 50MW and the Osprey Generation by 200MW.” (NOT A QUESTION) Directive or Voluntary? Directive !! Reliability Coordinator Topics

Questions ?