CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.

Slides:



Advertisements
Similar presentations
Rosetta Magnetic Field PDS Review B. J. Anderson.
Advertisements

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 Usage of the Cluster Data in ILWS Studies Harri Laakso, Philippe Escoubet, Matt Taylor, and Arnaud Masson European Space Agency (ESA) Science and Robotic.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
PEACE DAA Status Andrew Fazakerley, Iryna Rozum, Andrew Lahiff, Branislav Mihaljčić & the PEACE ops team 5 November 2009, DAA meeting, Paris, France MSSL.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
Cluster Active Archive 1 Drift Velocity/Electric Field Comparison: CIS, EDI, EFW, FGM Jonathan Kissi-Ameyaw Cluster Active Archive ESTEC.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
Prepared by: Jolene S. Pickett, Joanne M. Seeberger, Ondrej Santolíc, Kristine M. Sigsbee, Ivar W. Christopher and Roxane M. Mitten Department of Physics.
Cross-Calibration Meeting, ESTEC, February Comparison of the EDI and FGM Measurements of the Magnetic Field Magnitude Plot shown.
Status of EDI Archiving March, 2015 Leiden, Netherlands.
1 OEAW Contribution to ECLAT R. Nakamura, W. Baumjohann, M. Volwerk Institut fu ̈ r Weltraumforschung der Österreichischen Akademie der Wissenschaften.
1 CAA 2009 Cross Cal 9, Jesus College, Cambridge, UK, March 2009 Caveats, Versions, Quality and Documentation Specification Chris Perry.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
Mullard Space Science Laboratory October 2008 A.N. Fazakerley, I Rozum, C. Anekallu, H. Bacai MSSL-UCL CAA PEACE Team Status.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Status of EDI Archiving and Calibration Activities March 25-26, 2013 Darmstadt.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
Status of CIS Calibration Work Iannis Dandouras and the CIS Team presented by: Harri Laakso 3 rd CAA Cross-Calibration Meeting MSSL, October 2006.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
Investigation of a discrepancy between magnetic field magnitudes determined by the FGM and EDI instruments Jonny Gloag, Edita Georgescu, Elizabeth Lucek,
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
CAA Operational Review 9 Double Star PEACE Team Report
Status Report of EDI on the CAA
CIS Data Archival Status
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
16th CAA Cross-calibration Workshop
CIS Data Archival Status
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
20th CAA/DAA Cross Calibration Meeting
EDI – CAA STATUS REPORT EDI CAA Status
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Annual Report of the DWP Experiment 9th CAA Operations Review
Status Report of EDI on the CAA
Jolene S. Pickett, Joanne M. Seeberger, and Ivar W. Christopher
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
Presentation transcript:

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities 28 October 2008 Kinsale, Ireland

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu Summary of the status of the archive All data products, including additional CRF data, have been produced and delivered for the years and partially for However EGD data for 2006 must be reprocessed and re- delivered. Documentation and production software delivered. ICD has been updated with the CRF info. Additional update is planned with details on how to use AED and to change “calibration” to “correction” when describing AEC files. Cross-calibration of EDI data with other instruments discussed at UNH within the EDI team. Technical calibration report delivered in May. Update planned for the next CAA Review. New delivery plan submitted in May. Data delivery is conforming to the plan. Present Management Structure - PI: Roy Torbert ( ) - Technical Contact/Archive Scientist: Edita Georgescu ( ) - Managerial Contact: Patrick Daly ) - Administrative Contact: Andrea Macke ( ) 1. Introduction (1)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu Action Items from the OR-2 & FR-1 Review Board: R31: The board recommends that two AED datasets are held on the CAA – raw and calibrated. It should be discussed with the CAA whose responsibility it is to produce the calibrated product. T9: The board feels that calibration of AED is still an open issue. The team is encouraged to participate in a PEACE-EDI cross-calibration activity and to finish the remaining calibration tasks. The ICD and the “Calibration report” or the “User guide” will contain a description of the ambient electron raw data correction and calibration procedure with an example and Caveats. We are also currently investigating the production of files containing the inter-detector correction factor. Use of these files, in addition to the existing AEC files, would allow the user to correct the raw AED counts for inter- and intra-detector factors, respectively. There is presently no plan to supply the archive with a calibrated (against PEACE) AED dataset. Calibration activities will continue only on a case-by-case basis, and in cooperation with members of the EDI team." T4: The board recommends that all teams produce a brief user guide to their data sets to help users to select the right products for their needs and to interpret caveat and quality information. OPEN – planned for next OR 1. Introduction (2)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 2. Status of EDI Data Products SPlot AED PP Ambient Electron Data Electron Counts at 0º,90º,180º pitch angles FORMAT = CDF -> CEF Prime Parameter plus – spin resolution Winners plus losers with all qualities ( good/caution/bad ) FORMAT = CDF ! 3-hourly Survey Plots for one spacecraft (usually C3) MPD+AED, FORMAT = PNG MAIN DATA PRODUCTS PPplus MPD Prime Parameter - spin resolution Winners with good/caution quality FORMAT = CDF -> CEF Merged Parameter Data Merged one-, half- and quarter- spin resolution winners with good/caution quality, FORMAT = CDF -> CEF MSF EGD QSTAT AEC Merged Science Files HK+NM+BM Telemetry FORMAT = binary Quality STATistics Files Beam tracking performance FORMAT = ASCII Electron Gyrotime Data Electron Time-Of-Flight FORMAT = CEF AE Correction files Use to correct raw counts on their angular dependence FORMAT = ASCII RAW DATA AUXILIARY DATA Caveat List Time intervals of EDI WW & AE operation modes FORMAT = CEF CRF Code Repetition Frequency EDI HK info: code frequency code length & beam currents FORMAT = CEF CLIST All data products delivered for ! !

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3. Status of EDI (Cross-)Calibration EDI contributions to the cross calibration : Compare the magnetic field magnitude resulting from the electron time-of-flight measurements with FGM and WHISPER data EDI-FGM planned for dates in Compare the electron gyrofrequency with WHISPER data waiting for new WHI data Compare electric field to EFW Compare ambient electron counts to PEACE fluxes (see next slides) Deliver EDI housekeeping information to the other instruments, in order to facilitate the correction of the disturbances due to the instruments operation (CRF and CLIST data) Done (conforming to the Data Delivery schedule)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3.1 EDI–PEACE Cross-Calibration EDI AED: 16/128 Hz timeline, counts of ambient electrons in 16/8 ms time interval with 0°,180° and/or 90° pitch angle, 0.5/1.keV energy, status and detector look direction. AEC files are used to correct only for the intra-detector look direction dependence, even if they contain placeholders for inter-detector calibration. A complete procedure as discussed in the EDI team meeting at UNH (22/09/08) contains following steps: Intra-detector correction for the detector look direction by using the AEC files Inter-detector correction - determine correction factor to D1, check for stability and optimum averaging interval Calibration relative to PEACE - determine calibration factor, check stability and optimum averaging interval The procedure will be documented and assistance of EDI team is offered for interested users EDI was not designed to measure the ambient electron fluxes No geometric factor determination or calibration done

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3.1 EDI–PEACE Cross-Calibration (1) Intra-detector correction for the look direction by using AEC corrected_count1 = raw_count*f1(phi)*f2(theta)/(2. – tm f1(phi), f2(theta) from AEC files, tm = 0,1 for 16/128 Hz (tm = status/2)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu Inter-detector correction CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3.1 EDI–PEACE Cross-Calibration (2) corrected_count2 = corrected_count1*f_id f_id = D1/D2, where D1 and D2 are averages of look direction corrected raw data counts

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3.1 EDI–PEACE Cross-Calibration (3) Calibration relative to PEACE

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 3.1 EDI–PEACE Cross-Calibration (4) PEACE data product: spin resolution differential energy flux C2_CP_PEA_PITCH_SPIN_DEFlux__ _0850_1140_V01.cef For the comparison the differential energy fluxes were selected for pitch angles [°]: 7.5 (0), (180) and 82.5, 97.5 (90) energies [keV]: (0.5) and (1.0) EDI corrected counts were averaged to the PEACE time-intervals DIFFICULTIES / CAVEATS: Energies and pitch angles not exactly the same The different factors are not constant in time The determination of the factors is a time-consuming process The factors/errors depend on the selected averaging intervals and are not well defined QUESTION: what do we gain?

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 4. Status of EDI software development The source codes for the EDI data production have been archived for documentation New source codes were developed for: (1)EDI CRF data production and (2)CDF2CEF conversion of AED (3)EDI/WHISPER/FGM comparisons (4)EDI AED correction and calibration to PEACE CAAtools were installed to help syntax check of CEF-files !

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 5. Status of documentation delivery (1) EDI documentation delivered. Documentation contains: ICD (latest version: ICD_EDI_ _0103) - has been updated with the description of the additional auxiliary product CRF Update planned Update planned planned EDI_CAA products user manual planned planned EDI Cross Calibration technical report - Update planned Software source codes archive Instrument papers and instrument user manual - ” The Electron Drift Instrument on Cluster: overview of first results ”, G. Paschmann et al, Ann. Geophys. 19: 1273–1288, ” Cluster EDI convection measurements across the high-latitude plasma sheet boundary at midnight ”, J. M. Quinn et al, Ann.Geophys. 19: 1669–1681, ”Archiving of the Cluster EDI Data”, E. Georgescu et al, ESA, SP-598, 2006

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 5. Status of documentation delivery (3) SOFTWARE Source Code Archive for Documentation The archive contains 8 gzipped-directories (tgz-file) with C and IDL software modules, named mainly after their output. The table shows the correspondence between the directory names, the module names in the flowchart, date/version of the current software, the programming language and the output. CLIST is the CaveatList data containing the time intervals when EDI was in active (WW) mode and CRF contains EDI housekeeping (code repetition frequency, code flag and beam current index) relevant for the functioning for other instruments on board. Table 1. EDI SOFTWARE

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 6. Archiving plan for the extension (1) Edita Georgescu CAA OR-2, Noordwijk, 15 May Edita Georgescu CAA 1st phase, FR, Noordwijk, 20 May * The ICD doesn’t contain any reference to “product level”; there is instead a classification as “raw”, “auxiliary” and “main” or final data products. I’m using here the following equivalence to levels: “raw” = 1, “auxiliary” = 2 and “main” = 3. ** AED and AECalfiles are going to be delivered by the US CoIs and depend on NASA financing.

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu MSF, QSTAT PP, PPPlus, MPD, 3-h SPlots AED, AECalf EGD, CLIST CRF Measurements (year) /1/2008 1/1/2009 1/1/2010 1/1/2011 Delivery date Final Review Annual Annual Final 1st phase Review 1 Review 2 Review Data product: 6. Archiving plan for the extension (2)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu 6. Archiving plan for the extension (3) Tasks : UPDATE DOCUMENTATION CROSS-CALIBRATION of: - magnetic field, respectively electron gyrofrequency with FGM and WHISPER - electric field with EFW (EFW team & Pamela Puhl-Quinn) - ambient electron counts with PEACE (EDI team)

CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu Status of the EDI archiving activities is good. Data products and documentation provision on time. Cross-calibration to be continued when time available No problems to be expected for the extension. 7. Summary