THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian.

Slides:



Advertisements
Similar presentations
Ganymede Lander Page 1 - Magnetometer Proposal -Moscow, Magnetic Field Measurement Onboard a Ganymede Lander Experiment Proposal Based on Experiences.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Magnetic Field Instrument for the BepiColombo Planetary Orbiter
Main task  Development, calibration and operation of spaceborne magnetometers Main research topics 1.Building and test of space magnetometers  Integration.
Magnetometer Front-end ASIC (MFA) Magnes 1), W., H. Hauer 2), A. Valavanoglou 1), M. Oberst 2), H. Neubauer 2), D. Pierce 3), J. Means 3), I. Jernej 1),
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument Suite PEREFI- 1 UCB, May 2, 2005 THEMIS Solid State Telescope (SST) Instrument Suite PER The THEMIS SST, IDPU and II&T Teams.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Lander Experiment ROMAP
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
Themis Mission CDR FGM- 1 UCB, June FGM Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
FGM peer PDR I/F - 1 Braunschweig, October 8-9, 2003 Digital Interface (I/F) Aris Valavanoglou Institut für Weltraumforschung (IWF) Austrian Academy of.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS peer PDR Summaries 1 October, 2003 MPDR RFA#4 TITLE: Provide Design Information from the Instrument Peer Reviews REQUESTED BY: Joseph Bolek, Mark.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
FGM peer CDR I/F - 1 Berlin, April 6, 2004 Digital Interface (I/F) Aris Valavanoglou Institut für Weltraumforschung (IWF) Austrian Academy of Sciences.
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
IDPU F1 Test Review FGM Fluxgate Magnetometer Michael Ludlam University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
SPF MAG Quarterly Report – Feb 2015
CINEMA System Engineering
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Boom Electronics Board (BEB)
Institut für Geophysik und Meteorologie
Preliminary Design Review
Operational Description
FGM S/C Integration Requirements
Presentation transcript:

THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian Academy of Sciences Hans-Ulrich Auster Institut fuer Geophysik und Meteorologie Technical University Braunschweig (TU-BS)

THEMIS Mission PDR/CAR 2 UCB, November 12-14, 2003 FGM Team TU BraunschweigIWF Graz Karl-Heinz Glassmeier (Head)Wolfgang Baumjohann (Head) Ulrich Auster (FGM TM)Werner Magnes (FGM CoTM) Ingo RichterKonrad Schwingenschuh Karl-Heinz FornaconAris Valavanoglou Bernd StollÖzer Aydogar Ernst Jelting Rumi Nakamura Dragos ConstantinescuTielong Zhang Yasuhito NaritaMartin Volwerk Jan GrosserAndrei Runov Sebastian SchäferZoltan Vörös Gero Kleindienst Yoshihiro Asano Carsten Schmidt Main Subcontractor: Magson GmbH Olaf Hillenmaier Ronald Kroth

THEMIS Mission PDR/CAR 3 UCB, November 12-14, 2003 FGM Work Distribution  TU-BS FGS fabrication FGE / sensor electronics  TU-BS & IWF FGS qualification FGM calibration FGM integration  IWF FGE / interface electronics  UCB Parts procurement PCB fabrication Boom / FGS-MLI FGE qualification

THEMIS Mission PDR/CAR 4 UCB, November 12-14, 2003 Block Diagram Instrumentation

THEMIS Mission PDR/CAR 5 UCB, November 12-14, 2003 FGS - FGE 6U Board with the FGE Layout FGS

THEMIS Mission PDR/CAR 6 UCB, November 12-14, 2003 FGM Requirements (1) IN.FGM-2. The absolute stability of the FGM shall be less than 1nT -Determination of 3 offsets and 9 elements of the calibration matrix (scale values, non-orthogonality, sensor orientation) through in-flight calibration once per orbit -Spinning S/C provides 8 of 12 calibration numbers -Scale values are known accurately enough from pre-flight calibration -The determination of the spin axis offset can be done to 1nT accuracy by known physics during a standard orbit and to +/-0.1nT accuracy when being in solar wind IN.FGM-1. The FGM shall measure DC and low frequency perturbations of the magnetic field

THEMIS Mission PDR/CAR 7 UCB, November 12-14, 2003 FGM Requirements (2) IN.FGM-3a. The relative stability of the FGM shall be less than 0.2nT/12hrs IN.FGM-3b. The relative stability of the FGM shall be less than 0.1nT/hr -Sensor noise:< 1 Hz IN.FGM-5. The FGM noise 1Hz shall be less than 0.03nT/sqrt(Hz) -Offset / Time:< 0.1nT/h; < 0.2nT/12hrs; < 1nT/year; -Offset / Temperature:< 0.1nT/°C -Scale value / Temp.:< 24ppm 32000nT) -Orthogonality / Temp.:can be neglected

THEMIS Mission PDR/CAR 8 UCB, November 12-14, 2003 FGM Requirements (3) IN.FGM-4. The FGM digital resolution shall be less than 0.1nT IN.FGM-6. The FGM science range shall exceed nT -FGM provides 0.01nT digital resolution independent of the external field due to digital magnetometer principle - The maximum feedback field (range) is about 32000nT - 24 bits per field component will be sent to the IDPU - 16 bits will be selected for transmission 10pT digital resolution if B < 320nT 160pT digital resolution if B > 2500nT 1.2nT digital resolution if B > 20000nT

THEMIS Mission PDR/CAR 9 UCB, November 12-14, 2003 FGM Requirements (4) IN.FGM-7. The FGM frequency range shall exceed DC-1 Hz - FGM primary data rate is 128Hz (7.5ms measurement, 0.3ms feedback setting) -Further averaging will be done in the FGE FPGA and/or by the IDPU

THEMIS Mission PDR/CAR 10 UCB, November 12-14, 2003 Mission Requirements (1) REQUIREMENTFGM DESIGN IN-1. The Instrument Payload shall be designed for at least a two-year lifetime Compliance. Lifetime has been considered in all aspects of FGM design (parts, performance degradation, etc). IN-2. The Instrument Payload shall be designed for a total dose environment of 33 krad/year (66 krad for 2 year mission, 5mm of Al, RDM 2) Compliance. Common Parts Buy for Instrument Payload. All parts screened for total dose. Radiation testing planned if TID is unknown (AD648) or has already been performed by TUBS (AD625, MIC4425). All FGE components under UCB control. IN-3. The Instrument Payload shall be Single Event Effect (SEE) tolerant and immune to destructive latch-up Compliance. Common Parts Buy for Instrument Payload. Most parts screened for SEE. Radiation testing planned if LET is unknown (AD625, MIC4425). All FGE components under UCB control. IN-7. No component of the Instrument Payload shall exceed the allocated mass budget in THM-SYS-008 THEMIS System Mass Budget.xls Compliance. FGM Sensor: 80g Allocated. FGS mass is 76 g. (Harness and FGE Board tracked with IDPU)

THEMIS Mission PDR/CAR 11 UCB, November 12-14, 2003 Mission Requirements (2) -Needed supply voltages and currents based on VEX-MAG and bread board: +5V d & +2.5V d (FPGA & DAC) 10mA +8V a (excitation & amplifiers ) 50mA (30mA+20mA) -8V a (amplifiers) 20mA +/-5V a (ADC) 15mA -760mW if all voltages will be provided (+80/-0mW)  No EEE part with > 100mW power dissipation! REQUIREMENTFGM DESIGN IN-9. No component of the Instrument Payload shall exceed the power allocated in THM-SYS-009 THEMIS System Power Budget.xls Compliance. 900mW Allocated.

THEMIS Mission PDR/CAR 12 UCB, November 12-14, 2003 Mission Requirements (3) REQUIREMENTFGM DESIGN IN-13. The Instrument Payload shall survive the temperature ranges provided in the ICDs Compliance. See further down IN-14. The Instrument Payload shall perform as designed within the temperature ranges provided in the ICDs Compliance. Calibration and verification facilities exist in Graz (IWF) and Braunschweig (TUBS). Detailed calibration procedure planned operating temperature range (sensor/electronics): –100°C / -20°C to +65°C / +45°C cold start (sensor/electronics): -100 °C / -50°C survival temperature range (sensor/electronics): –100°C / -50 °C to +65°C -FGM sensor qualified for +/-100°C (Rosetta, VenusExpress)

THEMIS Mission PDR/CAR 13 UCB, November 12-14, 2003 Mission Requirements (4) REQUIREMENTFGM DESIGN IN-16 The Instrument Payload shall comply with the Magnetics Cleanliness standard described in the THEMIS Magnetics Control Plan Compliance. THM-SYS-002 Magnetics Control Plan. IN-17 The Instrument Payload shall comply with the THEMIS Electrostatic Cleanliness Plan Compliance. THM-SYS-003 Electrostatic Cleanliness Plan IN-18 The Instrument Payload shall comply with the THEMIS Contamination Control Plan Compliance. THM-SYS-004 Contamination Control Plan IN-19. All Instruments shall comply with all electrical specifications Compliance. THM-IDPU-001 Backplane Specification IN-20. The Instrument Payload shall be compatible per IDPU-Instrument ICDs Compliance. THM-SYS-106 FGM Interface Requirements Document (Internal # THM-FGM-DS V1.3). Verification Matrices to be completed. IN-21. The Instrument Payload shall be compatible per the IDPU-Probe Bus ICD Compliance. THM-SYS-112 Probe-to-FGM Mag Boom ICD. Verification Matrices to be completed. IN-23 The Instrument Payload shall verify performance requirements are met per the THEMIS Verification Plan and Environmental Test Spec. Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed. IN-24 The Instrument Payload shall survive and function prior, during and after exposure to the environments described in the THEMIS Verification Plan and Environmental Test Specification Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed.

THEMIS Mission PDR/CAR 14 UCB, November 12-14, 2003 Electrical Instrumentation Interfaces defined and documented: –Four-wire serial digital I/F with CLK, CMD, TMH and TML –Supply voltages as presented before –THEMIS/FGM I/F Requirements I1R3 (TH-FGM-DS-0001) –THEMIS/IDPU Backplane Specification 001H Proposed design will meet functional requirements Sufficient maturity in design to proceed to detailed design –Digital magnetometer design based on existing space H/W (MIR-MAG, Rosetta Lander, Venus Express) –Separate BBM for testing design changes is currently under test Risks have been identified –Sophisticated fabrication, calibration and integration process (Europe, Berkeley and Swales)

THEMIS Mission PDR/CAR 15 UCB, November 12-14, 2003 GSE Concept MGSE for FGS Mu-metal can EGSE for FGE commanding and testing Digital interface simulator (bread board EGSE) with limited features for bread board testing (supplied by IWF) Full functional EGSE for ETU and FM (supplied by UCB) Themis Calibration Unit (TCU) Three layer mu-metal can including calibration coils and mechanics for sensor rotation Three systems located in Braunschweig, Graz and Berkeley

THEMIS Mission PDR/CAR 16 UCB, November 12-14, 2003 Mechanical & Thermal Mechanical Same sensor design used for Rosetta Lander and Venus Express For Venus Express it was just qualified to –Sinusoidal vibration: Hz; 25 g –Random vibration: Hz; 18 Grms –Quasistatic acceleration: 25 g Thermal One internal / collectively controlled unit: FGE –Part of the common electronics box One external / individually controlled unit: FGS –Extended operating and non-operating temperature range –Standard Kapton-VDA MLI is sufficient –Thermal model will be supplied

THEMIS Mission PDR/CAR 17 UCB, November 12-14, 2003 Development Plans (1) Sub-units FGS: FluxGate Sensor FGE: FluxGate Electronics Models BBM: Bread Board Model (FGE-BBM) STM: Structural and Thermal Model (FGS-STM) ETU: Engineering and Testing Unit (FGE-ETU1/2) FM: Flight Model (FGS-F1/F6 and FGE-F1/F5) Locations US-Berkeley (UCB) US-Swales E-Braunschweig (TU-BS) E-Graz (IWF)

THEMIS Mission PDR/CAR 18 UCB, November 12-14, 2003 Development Plans (2) FGE BBM / FGE ETU

THEMIS Mission PDR/CAR 19 UCB, November 12-14, 2003 Development Plans (3) FGS FM / FGE FM

THEMIS Mission PDR/CAR 20 UCB, November 12-14, 2003 Development Plans (4) FGS F6 / FGE ETU-1

THEMIS Mission PDR/CAR 21 UCB, November 12-14, 2003 Peer Review Results 21 Findings: From No.1 - Jitter spec. of CLK8MHz should meet the FGM requirements (i.e. 10%) To No.21 – Magnetic control plan and S/C test in GSFC coil facility (under UCB control)  FGM team fully understands the findings and will take it into account during the upcoming instrument development process! 2 RFAs: RFA FGM-1: Magnetic CleanlinessStatus: UCB is working on it RFA FGM-2: Anti-Aliasing FilterStatus: FGM working on it –It was always planned to implement such a filter –Final filter spec is dependant on a trade-off between anti-aliasing, data decimation and impact on the quality of the de-spinning process.