Progress of gas-filled RF hadron monitor study K. Yonehara APC, Fermilab 2/10/16K. Yonehara1.

Slides:



Advertisements
Similar presentations
High pressure RF cavity project Katsuya Yonehara APC, Fermilab 2/28/11 - 3/4/111.
Advertisements

Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Beam stability (direction/flux) 2.Absolute  beam flux.
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Stephen Molloy RF Group ESS Accelerator Division
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Particle-Driven Plasma Wakefield Acceleration James Holloway University College London, London, UK PhD Supervisors: Professor Matthew wing University College.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
1 Comments on gas filled RF cavity tests A.V. Tollestrup Aug 14,2007.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
2 Lasers: Centimeters instead of Kilometers ? If we take a Petawatt laser pulse, I=10 21 W/cm 2 then the electric field is as high as E=10 14 eV/m=100.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
1 Front End – present status David Neuffer March 31, 2015.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Research in Particle Beam Physics and Accelerator Technology of the Collaboration IKP Forschungszentrum Jülich & JINR A.N. Parfenov for the Collaboration.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Tunable, resonant heterodyne interferometer for neutral hydrogen measurements in tokamak plasmas * J.J. Moschella, R.C. Hazelton, M.D. Keitz, and C.C.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
V.L. Kashevarov. Crystal Collaboration Meeting, Mainz, September 2008 Photoproduction of    on protons ► Introduction ► Data analysis.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
A mass-purification method for REX beams
Lecture 25 - E. Wilson - 12/15/ Slide 1 Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
Observations of electrons in the Intense Pulse Neutron Source (IPNS) Rapid Cycling Synchrotron (RCS) J. C. Dooling, F. R. Brumwell, W. S. Czyz, K.C. Harkay,
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Horn focusing effect 2.Beam stability (direction/flux) 3.Beam.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Status of high pressure RF cavity project K. Yonehara Accelerator Physics Center, Fermilab 10/08/20101MAP Friday meeting.
Basic of muon ionization cooling K. Yonehara 8/29/11HPRF cavity physics seminar - I, K. Yonehara1.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
Progress on high pressure gas filled RF cavity test program K. Yonehara & A. Tollestrup APC, Fermilab 3/4/121MAP collaboration meeting 2012.
Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of the Muon Accelerator Program 5/22/121International Particle Accelerator Conference,
Measurement of 400 MeV Proton Beam Intensity and Transmission Through Collimator of HPRF Cavity at Fermilab MuCool Test Area M. R. Jana 1, M. Chung 1,
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Progress of High Pressure Hydrogen Gas Filled RF Cavity Test Katsuya Yonehara Accelerator Physics Center, Fermilab Muon Accelerator Program Review Fermilab,
1 Front End – present status David Neuffer December 4, 2014.
ESS | Non-Invasive Beam Profile Measurements| | C. Böhme Non-Invasive Beam Profile Measurement Overview of evaluated methods.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Large Booster and Collider Ring
K2K and JHF-nu muon monitor
of secondary light ion beams
Design of the MANX experiment
Few Slides from RF Deflector Developments and Applications at SLAC
Polarized Positrons at Jefferson Lab
Injector: What is needed to improve the beam quality?
Explanation of the Basic Principles and Goals
Breakout Session SC3 – Undulator
Status and plans for crab crossing studies at JLEIC
Presentation transcript:

Progress of gas-filled RF hadron monitor study K. Yonehara APC, Fermilab 2/10/16K. Yonehara1

Background Radiation robust hadron profile monitor is required for multi-MW beams Propose a gas-filled RF hadron monitor – Radiation robust – Accurate No space charge effect Awarded STTR phase I with Muons Inc., 2015 ($100k/yr) – Evaluated a concept of the new hadron monitor – Prepare for phase II grant ($1M/2yrs) 2/10/16K. Yonehara2

Concept of gas-filled RF hadron monitor 2/10/16K. Yonehara3 High energy charged particle N 2 gas RF field Beam-induced gas plasma Fast-proton-impact ionizes N 2 and induces electron cascade Beam-induced gas plasma changes the permittivity of gas Measure the permittivity shift by observing the RF modulation

Plasma permittivity 2/10/16K. Yonehara4 : Electron collision frequency with gas n e : Number of ion pairs m : Electron mass  rf : Angular frequency of driving RF Resonant frequency shift RF power loading Ionization electrons must be thermalized by gas via the momentum transfer interaction within one RF cycle! This condition is guaranteed with the present RF monitor design. Variables tuned by RF parameters E, P K. Yonehara et al.,

Schematic of RF monitor 2/10/16K. Yonehara5

RF pixel and diagnostics 2/10/16K. Yonehara6 RF phase lock signal Mixer to measure frequency shift ADC records raw RF signals

Set goal spatial resolution of beam center for LBNF application 2/10/16K. Yonehara7 I picked up the goal spatial resolution to be 1-2 mm at the hadron monitor even though the spatial resolution 5 mm is needed for 25  rad Expected muon profile at muon monitor (P. Lebrun et al)

Assumptions in this analysis No horn in event generator – High energy protons are dominant – Horn won’t change the profile of fast protons significantly No neutral particle involved – Assume it is an isotropic distribution – It may contribute as noise but it should not be significant No plasma recombination – Plasma lifetime will be > 10  s, which is longer than beam spill time 2/10/16K. Yonehara8 N. Mokhov

RMS size = 1.0 mm cycle time = 1.2 s (or shorter) Pulse duration = 10  s (84-2) x 6 bunches (20 ns bunch to bunch) ppp ( MW Generate secondary beam in G4Beamline xy profile of all charged particles at hadron monitor -500 mm 500 mm -500 mm 500 mm Arrival time of protons at hadron monitor 120 GeV proton Carbon z = 0 m 15 x 6.4 x 1000 mm Hadron z = 200 m Secondary particles Most primary protons are arrived within 100 ps (= RF period) K. Yonehara92/10/16

RF energy dissipation by plasma 2/10/16K. Yonehara10 ~ 100 ion pairs in 1 atm N 2 ~ 20 ion pairs in 1 atm He RF energy dissipation per RF pixel where i represents i -th test particle Number of ion pairs Record 6D of charged particles generated in G4 base simulator Estimate number of ion pairs in RF pixel Estimate dw for each ion pair Sum dw to estimate W B. Freemire

Evaluation for 120 GeV 2.4 MW beam 2/10/16K. Yonehara11 RF energy dissipation in RF monitor 12 x 12 pixels, 30 x 30 mm 2 ▸ Resonator size is determined from spatial resolution ▸ Number of data points are more than 5 which is needed for good fitting Observed beam profile after single bunched beam passed the monitor Orange curve is a normal fitting ▸ Beam center is found from the fitting in this analysis E = 0.1 MV/m N2 gas pressure = 1 atm

Empty target mode 2/10/16K. Yonehara12 RF pixel Primary proton beam at target Beam emittance = 30   rad (3  ) Square root of beta function = 4.5 m 1/2 Beam size = 3.2 mm (3  ) Divergence x’ = 75  rad (3  ) Only four RF pixels are hit the beam Beam is on one vertex of each RF pixel Beam position can be tuned by equalizing RF energy consumption in each RF pixel xy profile at RF monitor (z = 200 m) RF pixel RF monitor signal

Misalignment 2/10/16K. Yonehara13 Target 15 x 6.4 mm 2 0 mm dx 2 mm y profile x profile dx 4 mm y profile dy 4 mm dy 2 mm y x beam position on target For y direction: Beam center can be measured with 0.15 mm errors For x direction: Not enough spatial resolution to determine the beam center from the normal fitting

60 GeV proton beam operation 2/10/16K. Yonehara14 8 x 8 pixels, 30 x 30 mm2 RF resonator It still detects the beam center within 1 mm spatial resolution E = 0.1 MV/m N2 gas pressure = 1 atm

Long graphite target 2/10/16K. Yonehara15 12 x 12 pixels, 30 x 30 mm2 RF resonator It still detects the beam center within 1 mm spatial resolution Note: No Horn in this analysis! Hadron flux should be greater than the present result E = 0.1 MV/m N2 gas pressure = 1 atm

Tune resonator sensitivity 2/10/16K. Yonehara16 RF resonator is equivalent to a LCR circuit Concentrate E field A high capacitive resonator has higher sensitivity than a box resonator It is useful for a low intensity beam measurement Expected detectable beam intensity 10 9 to protons/bunch

Electronegative dopant 2/10/16K. Yonehara17 Oxygen is a good electronegative element to capture a free electron via the three body process dw of O 2 - is 50 times lower than electrons RF stored energy can remain even several bunched beams are traverse in the resonator N2 + O2 N2 We can measure the time domain hadron beam profile E = 0.1 MV/m Gas pressure = 1 atm

RF frequency modulation 2/10/16K. Yonehara18 E = 1 kV/m f = 10 GHz N2 gas pressure = 1 atm Integrated all beam spill Frequency shift can be measured very accurately by using a lock-in amp Challenging part is how the frequency of a RF source is stable

RF power source RF power source is the most cost driver Since required RF power is so small that the commercial power supply is available for RF monitor Magnetron is even cheaper (it is a source of microwave) 2/10/16K. Yonehara19

Estimated RF power 2/10/16K. Yonehara20 G. Kazakevic Plot shows that the RF power source should provide ~2kW power to a 800 MHz RF pixel to excite 1 MV/m RF field 1 MW power magnetron is available for this frequency which can cover 50 RF pixels Example f = 800 MHz E = 1 MV/m

Demonstration test (I) Test 1: 800 MHz resonator at MTA to verify concept – All RF apparatus is ready – Need permission from Fermilab AD director 2/10/16K. Yonehara21 Experimental apparatus Measure wider E/P than past test Low gas pressure atm Low electric field 1 kV/m - 10 MV/m N2, He, O2 as dopant M. Chung et al., PRL 111, (2013)

Demonstration test (II) Test 2: 2.45 GHz resonator at MTA for R&D – Make a new RF resonator – Test existing 2.45 GHz Magnetron Phase stability Amplitude stability 2/10/16K. Yonehara22

Demonstration test (III) Test 3: 10 GHz resonator at MTA/NuMI for prototype test – Make a prototype RF monitor Pixel structure – Buy/Make a new RF power source 2/10/16K. Yonehara23

Time line Propose STTR phase II grant (Spring, 2016) Get permission for demonstration test at MTA from Fermilab AD director Carry out test 1 (Summer, 2016) Analysis phase Make a new RF resonator Carry out test 2 (Winter, 2016) Analysis phase Make a prototype RF monitor Carry out test 3 (Spring, 2017) Make a practical RF monitor for NuMI/LBNF 2/10/16K. Yonehara24