Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 1 HV and EHV allocation of harmonic rights.

Slides:



Advertisements
Similar presentations
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Advertisements

NERC Footnote b / 12 – Load Loss
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Sistan & Balouchestan Electric Power Distribution Company
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
EIUG – Wheeling Methodologies
Claims Reserving for Non Life Insurance Craig Thorburn, B.Ec., F.I.A.A. Phone
Ch 9 Learning Goals 3. The importance of risk in capital budgeting.
Short Summary from second Meeting of the Ecodesign CF Subgroup on Large Power Transformers Brussels Distribution Transformers (medium PT) Power.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Break-Even Analysis What is it? By John Birchall.
Tariff Lecture 7. The rate at which electrical energy is supplied to a consumer is known as tariff.
Teaching linear circuit analysis effectively D. Biolek, V. Biolkova & K. Vrba Brno University of Technology Czech Republic.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Eulogio Amang Rodriguez Institute of Science and Technology Nagtahan, Sampaloc, Manila Vacuum Tubes Amplifiers.
EPR ‘Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network’ by Ashok K. Parsotam (1997) available free.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
Copyright © 2006, SAS Institute Inc. All rights reserved. PFE Simulation Methodology Dominic J Pazzula Sr. Consultant – RiskAdvisory.
Inverting Amplifier. Introduction An inverting amplifier is a type of electrical circuit that reverses the flow of current passing through it. This reversal.
1- Depreciation is the systematic allocation of the depreciable amount of an asset over its useful life. The depreciable amount of an asset is the cost.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2001 November 2001 Venture 2002 – introduction to the financial planning model.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
18 Management of Waiting Lines.
Ordering Tool Guideline
Page 1 Hong Kong Institute of Vocational Education (Tsing Yi) T&N 3311 Lec 5 Department of Information and Communications Technology Parallel Circuits.
Dry type transformers Zaragoza Aluminum vs. Copper
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Utility Engineers, PC.  Generation  Transmission  Distribution.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
Unit III Bandwidth Utilization: Multiplexing and Spectrum Spreading In practical life the bandwidth available of links is limited. The proper utilization.
ACACSO Workshop Car Hire Rule 22 November Memphis, Tennessee J. D. Pavek The Greenbrier Companies.
Sample Size Determination
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
What are the Command Words? Calculate Compare Complete Describe Evaluate Explain State, Give, Name, Write down Suggest Use information to…..
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
1 BIS 3106: Business Process Management (BPM) Lecture Nine: Quantitative Process Analysis (2) Makerere University School of Computing and Informatics Technology.
Distribution systems basic techniques and radial networks.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
G5/4 Revision Project Progress Update Andrew Bower
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 18 Management of Waiting Lines.
F2:Management Accounting. 2 Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2.
DRAFT Slides for Discussion - Standards, Reports and Recommendations
Effects of GIC Neutral Blocking Devices (NBDs) on Transmission Lines Protection Performance and Potential for Resonance.
Project Management Systems
Public Hearing on: Large Wind Farm Interconnection
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Allocation of Rights Approach to GCRP/DCRP.
Allocation of rights – LV/MV
Global High Voltage Equipment Market Report 2023.
Distribution Loss Factors for Cost To Serve study
City of Lebanon, Missouri Electric Department
G5/4 Sub-group Update.
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
Mod_06_18 – PMEA Theoretically there should always be at least one Bid Offer Acceptance (BOA) Quantity which is unflagged and is therefore the Marginal.
National Institute of Wind Energy(NIWE)
Load balancing of a wireless network
Presentation transcript:

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 1 HV and EHV allocation of harmonic rights

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 2 Present condition ER G5/4 stage 3 assessment: applies to connection of loads at and above 33kV. final stage that should be followed for connections between low voltage and 33kV when leads to a not acceptable outcome under stage 2 assessment. Current practice under G5/4 Stage 3 assessment is to allow maximum planning levels to be taken up by developers on a “first come and first served” basis.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 3 Comparison of IEC and ER G5/4 IECG5/4 Stage 1 (simple assessment): Simple procedure for connections of small loads. Based on load and short circuit level – Equal rights Doesn’t specify a simple connection assessment similar to stage 1 of IEC. Only stage 3 is defined for HV and EHV. Stage 2 (detail assessment): Identifies a global maximum harmonic level for the substation of interest considering substations in the neighbourhood. The global limit is allocated based on customer load and total capacity of the substation- Equal rights. Stage 3 requires a detail assessment for identifying the limits. However, all the available limits are given to the first customer. Stage 3 (exceptional cases): acceptance of higher levels on a conditional and precarious basis Also has suggestions how to deal with cases where harmonic levels may exceed planning levels.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 4 Pros and Cons IECG5/4 Stage 1 Pro. Simple connection assessment made based on the rating of connect load Con. Doesn’t give the possibility to account for the effects of existing background harmonic conditions Stage 3 of G5/4 Pro. Possibility to account for the effects of existing background harmonic conditions. Con. Requires every customer to go through a detailed harmonic assessment irrespective of size of the load if connected above 33kV Stage 2 Pro. The method always tends to leave an inherent margin in the system. Con. the remaining proportion of the global limit may never be used up and first customer could incur unnecessary investment. Pro. Early bird catches the worm- the first customer gets all the available head room. Con. Customers wanting to connect to the same substation at a later stage will have extremely tight limits or no head room at all

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 5 Global harmonic level

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 6 Best of both? In order to balance between network performance and customer investments on harmonic mitigation, provisions could be made in the G5/4 to take advantage of both approaches. In substations where multiple connections are envisaged (possibly up to 7 years) the limits could be based on equal rights i.e., IEC apportioning method. In substations where multiple connections are not envisaged the present G5/4 approach of first come first served practice could be maintained. These two approaches rely on the number of planning applications made to the utility.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 7 Scenario – if multiple connection requests have been made C1 C2 C3 C1 – applies for connection C2 – applies for connection C3 – applies for connection It may also be that a single customer may have applied for more than one connection. C1, C2 and C2 could be allocated based on IEC equal rights.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 8 C1 Scenario – if only a single connection is made or envisaged C1 could be allocated all available margin.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 9 Issues Will the information available be sufficient to make a fair judgement on number of connections likely to happen in a given substation? Should the substation capacity be calculated for the time of connection? Customer may complain about all available head rooms not being provided.

Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 10 Background harmonic amplification Simulation results done on windfarms have shown background harmonic amplification as high as 6 times. ….generally, the longer the cable the higher the amplification of the background harmonics.