Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Advertisements

RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
RHIC Status Time Meeting 2/10/2015 Then said to us: "You can no farther go Forward upon this crag, because is lying All shattered, at the bottom, the sixth.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Outages During the Run Coping with the Power Company August 9, 2012.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Linac Status May 19, 2015 Time Meeting D. Raparia.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
Thomas Roser 2 nd Electron-Ion Collider Workshop March 15-17, 2004 Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski.
For The RHIC Spin Collaboration Yousef Makdisi (BNL)
Maintenance and Accelerator Support RHIC StartUp10.
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Linac Status June 16, 2015 Time Meeting D. Raparia.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Maintenance and Efficiency
Presentation transcript:

Accelerator Support and Maintenance Startup for Run 13

Status: EBIS, LINAC and Booster in full operation for Polarized setup, NSRL running and BLIP operation. EBIS, LINAC and Booster in full operation for Polarized setup, NSRL running and BLIP operation. AGS Polarized Proton development behind stores. AGS Polarized Proton development behind stores. RHIC running Physics, setup between stores, some changes on MDs. RHIC running Physics, setup between stores, some changes on MDs.

Tomorrow: Maintenance Day. LIPA work ( hrs) affecting AGS Booster MMPS only- other systems remain powered. LIPA work ( hrs) affecting AGS Booster MMPS only- other systems remain powered. RHIC store until 0800hrs then Maintenance. RHIC store until 0800hrs then Maintenance. Injector maintenance to start ~0700hrs, end early afternoon. Injector maintenance to start ~0700hrs, end early afternoon. OPPIS and LINAC by noon. OPPIS and LINAC by noon. Injectors prepared for early start if LIPA ahead of schedule. Injectors prepared for early start if LIPA ahead of schedule.

Major work tomorrow: LIPA Substation work. LIPA Substation work. RHIC polarimeter target installation. RHIC polarimeter target installation. e-lens work and power supply testing. e-lens work and power supply testing. D. Phillips meeting here after TM. D. Phillips meeting here after TM. Siemens inspection and maintenance. Siemens inspection and maintenance. Details discussed here at 1500hrs. Details discussed here at 1500hrs.

Schedule: 0600hrs: 0600hrs: LIPA work begins, no Booster Main Magnet. LIPA work begins, no Booster Main Magnet. LOTO Booster and AGS. LOTO Booster and AGS. 0800hrs: 0800hrs: Dump RHIC store, begin experimental access. Dump RHIC store, begin experimental access. Access RHIC berm at 8 o’clock. Access RHIC berm at 8 o’clock. 0815hrs (RMMPS I<500A): 0815hrs (RMMPS I<500A): Open 10 and 12 o’clock Irs Open 10 and 12 o’clock Irs Access 9z1, 10z2 for dump survey. Access 9z1, 10z2 for dump survey. RA in 10 o’clock region following survey. RA in 10 o’clock region following survey. 1300hrs: 1300hrs: Sweep areas in RHIC were work is completed. Sweep areas in RHIC were work is completed. Secure AGS and Booster. Secure AGS and Booster. Remove LOTO. Remove LOTO.

Schedule Continued: 1600hrs: 1600hrs: Secure RHIC tunnel including 10 o’clock IR. Secure RHIC tunnel including 10 o’clock IR. Experimental areas remain opened. Experimental areas remain opened. Begin e-lens warm solenoid tests. Begin e-lens warm solenoid tests. Begin RHIC test ramps. Begin RHIC test ramps. 1700hrs: 1700hrs: Secure experimental areas. Secure experimental areas. Complete test ramps. Complete test ramps. Access IR12 (MMPS I<500A), complete polarimeter vacuum work. Access IR12 (MMPS I<500A), complete polarimeter vacuum work. Prep AGS and Booster for operation. Prep AGS and Booster for operation. 1800hrs: 1800hrs: Restore Booster and AGS to operation. Restore Booster and AGS to operation. Secure RHIC ring for beam. Secure RHIC ring for beam. Begin Physics setup. Begin Physics setup.

Scheduling Meeting: Details to be discussed here at 1500hrs. Details to be discussed here at 1500hrs. Those planning work must send representation. Those planning work must send representation.