Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.

Slides:



Advertisements
Similar presentations
IMPLEMENTING EABS MODERNIZATION Patrick J. Sweeney School Administration Consultant Educational Approval Board November 15, 2007.
Advertisements

Construction Contracting
Roles & Responsibilities in Construction Management
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Site-Based Decision Making Campus Planning. Restructuring A process through which a district or school alters the pattern of its structures (vision, rules,
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Bond Program Planning Imperatives Study Session October 12, 2004.
City of Eagle Pass, Texas TxCDBG Contract HOUSING REHABILIATION.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Implementation of the North Carolina Read to Achieve Program May 7, 2013.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Review of 2010 Biennial Audit of Capital Projects Cyndi Fout Project Services Director February 28, 2011.
The HA will reinforce the commitment of stakeholders to delivering quality housing at two levels - (a) At the strategic level, we will draw up a Quality.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
1 Construction Planning and Management: Tanya Vartivarian Director of School Services IFF June 2010.
Design & Layout of Foodservice Facilities
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Lecture 4 Facility Planning Sequence and Program Planning Using Technology Lectured by Prof. Jese UEAB 2008.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
AWPHD Legislative Summary House Bill 1196: Increasing the dollar limit for small works roster projects House Bill 1847: Increases bid limits for public.
Capital Project Process
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting October 27, 2011.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting December 19, 2012.
Preparing for Successful Bond Elections – Twin Rivers Unified Case Study Kim Barnett Executive Director, General Services Twin Rivers Unified School District.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
You passed the Bond or secured some funds What do we do now? 2014.
Facilities Interview Cindy McDaniel DSUSD Assistant Superintendent Business Services Maria E. Haigh Lupe Valdivia Marissa Fulache.
District Improvement Plan
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
CAPITAL FACILITIES PROGRAM UPDATE BOARD OF EDUCATION FEBRUARY 8, 2016 FACILITIES SERVE EDUCATION.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Wahoo Public School District Facility Planning Update April 18, 2016.
Scott Raines, Director of School Planning and Construction “Investing in West Virginia’s Future”
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Opening a Quality Charter School in the Los Angeles Unified School District Charter Schools Division February 27, 2008.
Capital Facilities Program Update San Rafael City Schools August 8, 2016.
2016 Presented by: Raffi Soghomonian
Lease-Leaseback Project Delivery Method
SUPERINTENDENT LEADERSHIP IN FACILITIES MANAGEMENT
Measure N Modernization
FAC21 - PLANNING 101: START YOUR ENGINES!
Capital Facilities Program Update San Rafael City Schools
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
David Salazar, Chief Facilities Executive
Capital Facilities Program Update San Rafael City Schools
Construction Management Services April 16, 2018
Presentation transcript:

Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy

Implementation Process

1.Comprehensive facilities master plan (CFMP) many Projects 2.Project planning 3.Project bidding 4.Project construction 5.Project occupancy

1. Comprehensive Facilities Master Plan Goals: –1. Document utilization and needs of existing school facilities. –2. Based on projections of future enrollment, identify future facility needs. –3. Suggest strategies and options for meeting future facility needs. –4. Evaluate financing strategies which meet facility requirements. –5. Establish a process for annually reviewing and, as appropriate, updating enrollment and facility data.

Master Plan Components

Standard Facility Guidelines (SFG) Building Capacities Existing Facility Needs Enrollment Projections Future Facility Needs Available Resources to Finance Projects Action Timeline (10-Year) 1. Comprehensive Facilities Master Plan

Standard Facility Guidelines (SFG) –Based on California Educational Facility Standards –Develop spatial, functional, and program requirements –Determine an optimally-sized facility at the elementary, middle school, and high school levels. 1. Comprehensive Facilities Master Plan

Building Enrollment Capacities: –Establish optimal Capacities for each facility based on: California standards LUSD’s maximum class-size Other staffing standards. 1. Comprehensive Facilities Master Plan

Existing Facility Needs –Evaluate compliance with SFG to identify parity –Current Building Capacities vs Enrollment –Space Deficiencies –Functional Deficiencies –Program Relationships 1. Comprehensive Facilities Master Plan

Enrollment Projections –10-year enrollment projections by grade- level and school –Monitor and evaluate housing development 1. Comprehensive Facilities Master Plan

Future Facility Needs –Based on projected growth and placement of residential development –Utilize Standard Facility Guidelines when designing additional sites and building additions 1. Comprehensive Facilities Master Plan

Available Resources to Finance Projects –Deferred Maintenance –Local Bond Issues –State Bond Issues –State Facility Programs –Energy Grants, E-Rate, etc. –Ending Fund Balance 1. Comprehensive Facilities Master Plan

Action Timeline (10-Year) –When enrollment changes will occur –When resources are available –When new facility needs are met –When existing facility needs are met –Many Projects are identified 1. Comprehensive Facilities Master Plan

2. Project Planning Specific Project –Identify Design agency –Scheduling the overall project from design to occupancy, including funding availability –Schematic Design Conceptual planning –Design Development Preliminary Plans –Construction Documents Plans and specifications for bidding –Division of State Architect (DSA) Approval

3. Project Bidding Specific Project –Develop Bid Documents including plans and specifications Addendums or modifications Base Bid with possible Alternates –Advertise the Bid –Bid Opening –Evaluation of Bids –Bid Award with required documentation

4. Project Construction Specific Project –Pre-construction Conference and mobilization –Site Observation –Shop Drawings –Project Reviews

4. Project Construction Specific Project (cont’d) –Construction Change Directives and Change Orders –Certificates of Payment –Substantial and Final Completion Dates –Start-up & Punch List

5. Project Occupancy Specific Project –Post-occupancy review and inspection –As-builts –One year design review –Warranty item assistance –Electronic documentation –Complete all documentation for funding

Project Goal Deliver the completed project: –WITH THE EXPECTED OUTCOME –WITHIN BUDGET, AND –ON TIME!

Participants LUSD Community Board of Education Bond Oversight Committee (Prop 39) Administration and staff Architect (KBZ) Contractor Division of State Architect (DSA) Office of Public School Construction (OPSC)

Role of Participants LUSD Community –Measurement of customer satisfaction –Communication is critical –Represented by the Citizens’ Bond Oversight Committee and the Board of Education –The Community’s dollars at work!

Role of Participants Board of Education –Ultimate Decision-maker –Decisions include: Consultant Selection approval Project Scope approval Plan & Specification approval Bid approval Approval of all contracts and payments

Role of Participants Citizens’ Bond Oversight Committee –Required by Proposition 39 –Appointed by Board of Education –Reassures the Community that the intent of Measure N is implemented –Reviews the implementation of the projects –Conducts Public Meetings –No decision-making authority

Role of Participants Administration and staff TaskLeader –PlanningAsst Supt for Business –BiddingPurchasing Manager –ConstructionOperations & Maintenance Manager A Project Manager is not being used at this time.

Role of Participants Administration and staff Measure N Implementation Team:  Asst Supt-Business (Team Leader)  Operations & Maintenance Manager  Purchasing Manager  Director of Information Technology  Architect Many staff are involved during the Planning phase, including other administration, maintenance and technology trades, custodians, teachers, secretaries, and other staff.

Role of Participants Architect –Kruger Bensen Ziemer Architects, Inc. (KBZ) from Santa Barbara –Other sub-consultants include mechanical engineers, electrical engineers, civil engineers, technology consultants, etc. –Prepares plans and specifications for Division of State Architect review and bidding –Construction Supervision

Role of Participants Contractor –A General Contractor will be selected as the lowest responsible bidder on each Project –Constructs the Project according to the plans and specifications –May suggest Change Orders to modify and improve the Project –Prepare as-builts

Role of Participants Division of State Architect (DSA) –Approves the plans and specifications before construction can begin –DSA approval signals the eligibility for State funding –A DSA Inspector is hired and paid by LUSD –The DSA Inspector monitors the construction and is responsible to the DSA

Role of Participants Office of Public School Construction (OPSC) –State funding agency for California’s Facility Programs, including K-12 Modernization –State funding for Modernization is the result of a State bond issue (Prop 47 & 55)

Project Result? SUCCESSFUL PROJECT: –Meets Expected Outcome Communication between Owner, Architect, and Contractor Input by those affected –Within Budget Communication between Owner, Architect, and Contractor Realistic projections –On Time Communication between Owner, Architect, and Contractor On-site visits monitoring progress

Upcoming Presentations April 27 –Comprehensive Facilities Master Plan (CFMP) –Change Order Process –Project Schedules May 11 –Project Plans, Specifications, and Budgets