Patrick MacLeamy, FAIA HOK CEO buildingSMART International Chair
Part One Design and Build Diverge
Building (n)
Building (v)
Guilds Built Buildings
Brunelleschi Florence Cathedral Dome 1400s Guild Master = Master Builder
Architect >>> Builder Christopher Wren St. Paul’s Dome 1600s Guild Master = Master Builder
Architect >>> Contractor Architect >>> Builder Thomas U. Walter US Capitol Dome 1800s
Architect >>> Contractor Design separated from Build Thomas U. Walter US Capitol Dome 1800s
Part Two Buildings are Assembled not Built
Auto Assembly – 1900s
Window Assembly - Today
Today Buildings are Assembled - Not Built
AssemblyBuildingPlant
To Summarize: 1 Design separated from Build 2 Buildings are Assembled not Built
Part Three Reinventing the Building Process
organization Information exchange design What is ?
organization What is ?
Architect Owner Contractor Information Exchange Risk Gap Construction Mgr Insurance Lawyers Traditional Organization
organization Architect Owner Contractor Shared Information & Shared Risk / Reward
organization Information exchange What is ?
StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect Traditional Information Exchange StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect BuildingInformationModel(BIM)BuildingInformationModel(BIM) Information exchange
Program Design Through all Phases Documents Construction Operation
organization Information exchange design What is ?
CDDesignDD Construction Prog Effort Time Traditional Design
CDDesignDD Construction Prog Effort Time Traditional Design Ability to cost control of Design Changes Cost
Litigation Phase CDDesignDD Construction Prog Effort Time Traditional Design Ability to cost control of Design Changes Cost
Design Litigation Phase CDDesignDD Construction Prog Effort Time Ability to cost control of Design Changes Cost
Litigation Phase CDDesignDD Construction Prog Effort Time of Design Changes Cost Ability to cost control Design
Litigation Phase CDDesignDD Construction Prog Effort Time of Design Changes Cost Ability to cost control Design
AssembleOperate BIM BAM BOOM! Benefit Time
Australasia Australia New Zealand Asia Singapore China Korea Japan North America United States Canada Europe Italy Portugal Spain Switzerland Germany Finland Sweden NorwayAustria Netherlands Denmark Belgium France Great Britain Ireland Africa S. Africa
Goals - Promote efficiency in the building industry - Support open standards for information exchange - Develop a universal data translator
organization Information exchange design What is ?
Thank you