The importance of process in high performance building design.

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

Bond Program Planning Imperatives Study Session October 12, 2004.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
LEED Cost & Benefits Habitat for Humanity of Broward Perry Ecton Executive Director Habitat for Humanity of Broward Mary Lou Bowman Cubbin Director of.
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Sustainable solutions in engineering Introduction of Building Industry in BC Presented by: Philip Fung, M.Sc., P.Eng., LEED AP Tony Tang, P.Eng., LEED.
BAYSIDE UNIVERSITY OF MASSACHUSETTS BOSTON MAIN CAMPUS UNIVERSITY OF MASSACHUSETTS BOSTON 1 Administration & Finance Facilities Department FY13 Budget.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
BECOMING GREEN Santa Margarita High School Academic Building.
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
CURRENT STATE NARRATIVE… Knight Management Center Lecture Hall.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Learning by Design Using LEED to enhance teaching and learning.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
Building Standards for High Performance Buildings High Performance Building Council National Institute of Building Sciences Washington DC.
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
Bill Harrison New Jersey Chapter February 3, 2009.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
Green Engineeering Mr. Kerins. What is Green Engineering  Engineers work to improve and protect the environment and enhance human health.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
LEED Mechanical Economic Analysis, Cost Reduction Strategies and Sustainability Support Services Reducing = Metal + Carbon + Energy + Water + Chemicals.
ARCH-4372/6372 Technology in Architecture Spring, 2015.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
N O R T H A M E R I C A C O M M E R C I A L TDP
BUILDINGS & ESTATES DEPARTMENT RESPONSIBILITIES  MAINTENANCE OF EXISTING BUILDINGS & GROUNDS Mechanical Electrical Builders Work Grounds Specialist 
ENVELOPE. LIGHTING.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Entertainment orporation’s Film Studio Development Presented By: Aahlada Chennupati Elissa Flandro Manish Kumar Vasiliki Micha October 22, 2008 Entertainment.
CEE 215 Mid-Term Team: Kevin Chen, Matt Clugston, Preston Taylor, Jesse Santiago 22 October 2008.
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
2 THE BROKER’S ROLE IN SUSTAINABLE COMMERCIAL PROPERTY.
Chiel Boonstra An Office Building Project Tax Office extension, Enschede Environmental design in practice.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution.
Green Dorm. WATER SYSTEMS TEAMSPACE SYSTEMS TEAM Ryan W. Ryan S. Nick Jack JamesStephanie Eric.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
AASHE CONFERENCE 2008 | BNIM Architects | people. innovation. design. Fayez S. Sarofim Building Institute of Molecular Medicine University of Texas Health.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
U.S. General Services Administration EPA New England Regional Laboratory Best Practices and Lessons Learned John F. Buckley, Project Manager
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
High Performance? “Greening” “Energy Efficient”
Sustainability Assessment of Family House - Case Study
Building Environmental Systems
Community Meeting, July 18, 2016 Update Designs and Phasing
Fun Facts: James M. Bennett High School
LEED Defined Leadership in Energy and Environmental Design
David Anderson Mechanical Option
GREEN DORM Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg
BEEP Integrated Design Process for Energy Efficient Buildings
Biobehavioral Health Building, University Park, PA
Energy Huntsville Opportunity Report March 2017
The Bond Street Wharf Baltimore, Maryland
INTD409 Interior Environmental Technology Spring2016/17
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
LEED Cost & Benefits Habitat for Humanity of Broward Perry Ecton
Presentation transcript:

The importance of process in high performance building design

December 2, 2013 High Performance Science and Engineering Complex in March 2016

The Vision for the Process Visioning a High Performance Building Truly high performing buildings, both in terms of technical metrics and occupant satisfaction, are the result of a process that is as carefully designed as the building. We propose two sessions to begin this process… Areas of focus will likely include: - Durability and maintainability - User friendliness - Resource efficiency (energy, water, land, materials, capital) - Indoor environmental quality - Waste issues - Site impact - Adaptability Marc Rosenbaum – Energysmiths / South Mountain Company

The Team Tufts Client Team Faculty - Provost / Deans / Departments / Project Sponsor Group Administration, Finance Trustees Space Planning Facilities & Operations (PM, Eng., Energy Mgmt., Recycling) Public Safety (EH&S, TUPD) Technical Services (Telecomm) Risk Management (Insurance & contracts) Office of Sustainability Procurement Community Relations Owner Consultants Master Plan Architect Concept Architect Building Performance Specialist Owner’s Project Manager Cost Estimator Construction Manager Geotechnical & Environmental Engineer Commissioning Agent Permitting Attorney Land Surveyor Security Systems A/V Systems Utility Incentive Program Manager Design Team Architect Lab Planner Mechanical (HVAC) Engineer Electrical Engineer Plumbing Engineer Fire Protection Engineer Structural Engineer Site / Civil Engineer Landscape / Hardscape Sustainability / LEED Code Consultant Energy Modeler Traffic & Parking Engineer Building Envelope Consultant Wind & Air Entrainment Acoustic & Vibration Engineer

Forming the Design Team Rigorous RFP process Multiple step Architect selection 21 pre-selectedSep-Oct first-cutNov-Dec semi-finalistsJan - Feb finalists Feb-Mar winner! May 2013 Selected MEP Engineers first Focused on differentiators documented high-performance prior successes

Benchmarks

Load Reduction Passive Systems Active Systems Energy Recovery Renewables Offsets Priorities

Envelope measures: High performance glazing Internal load measures: Lighting Power Density (LPD) reduction by 30% Lighting controls (Occupancy, Vacancy and Daylight sensors) Airside measures: Active chilled beams in Labs, offices and conference rooms Radiant cooling and heating slab in Atrium and Cafe Konvecta exhaust air heat recovery system with adiabatic cooling 50 ton Medium temperature chilled water heat recovery through Konvecta for free winter cooling and AHU preheat Aircuity based Lab ACH reduction Evaporative humidification system for Vivarium Transfer air from non-lab spaces (in SEC and Robinson) to lab spaces in SEC Low velocity/low pressure drop fan system design Energy Efficiency Measures

Mostly, stuck to the process Mostly, stuck to our goals More consultant driven than we had envisioned Trying to anticipate transition to operations Reality

Questions?