Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Managing Construction Risks
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Virginia Housing Coalition 2013 Housing Credit Conference Deal Structuring, Fundamentals, and Financing and Legal Issues.
Measure C Board of Trustees Update January 18, 2005.
Chapter 20 Plumbing Plans.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Primary Residential Design Considerations
GREEN BUILDING.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Construction Engineering 221 Cost Estimating and Bidding.
Design & Layout of Foodservice Facilities
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
TECHNOLGICAL DESIGN Architectura l Design Process.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
Chapter 2 Introduction to Construction Procedures
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Primary Design Considerations
Lynne Welsh Massachusetts Department of Environmental Protection.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Principles, Importance and Role of Energy Management
CREATE AND RAISE CATFISH FARM Why do we take pains to pay for expensive fish when we can create and raise them in our own backyard? If you like aquarium,
Real Estate Investment Chapter 2 Land Use Controls © 2011 Cengage Learning.
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Learning the Basics of Recreation Facilities 3 chapter.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CDM Construction Design and Management
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
The importance of process in high performance building design.
Learning the Basics of Recreation Facilities
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Comprehensive Thinking and Planning
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Task Manager Construction Coordinator Training -- EMS-- Fermilab 95% of Asbestos found is either Amosite or Chryosotile95% of Asbestos found is either.
BLAKELY  Welcome.
Fort Stanwix National Monument Energy Audit Contract
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Technical Specifications & Employer's Requirements
Heating Ventilation and Air Conditioning
Section 4: Resources and Conservation
Construction Documents
Financing Land Development Projects
Project Development and Managing your Build Agenda
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
Heating Ventilation and Air Conditioning
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Scientific or Engineered Landfilling of Waste
Heating Ventilation and Air Conditioning
CONSTRUCTION REGULATIONS AND CODES
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Presentation transcript:

Chapter 3 Facility Design and Construction

Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in the interrelated steps involved in planning, programming, site selection, and designing 3.Discuss the estimating and bidding processes and the construction of the facility

Estimating Costs & Budgeting Project budget preparation: – Determine feasibility by weighing the potential expenses against the projected revenue – Develop the Pro forma – Estimate fixed and variable costs – Identify potential revenue streams

Estimating Construction Costs Construction and other costs – Identifying hard costs – Establishing soft costs Identifying the cost of: – Land – Design – Utilities – Materials – Labor

Site Selection The site will contribute to the attraction of future patrons to the sport facility. A dedicated site search for land and location that has potential to produce anticipated revenues is key to future success. A sound design plan and schematics are vital to properly determine the size of your site. Site factors such as multiple entry and exit points, traffic lights, and dedicated turn lanes are extremely important.

Site Reports There are a two important reports that should be reviewed prior to acquiring the land: 1. Topographical report: displays key elements that make up the site such as electrical, sewer, water, and gas 2. Geographical report: indicates soil conditions that dictate which materials are necessary to support the foundation for the proposed building as well as provisions for drainage of surface and runoff water

Design Process By defining the components for the site schematics, a framework is established for the design elements to commence. The contract with the design firm must address that the facility will be designed based on the established budget. The designers’ contract should include the following: – Design costs for schematic, design development, and contract drawings – Costs for the civil engineer, topographical and geotechnical surveys – Landscape design costs – Mechanical, plumbing, electrical, and fire protection drawings – Proper permit issuance – Construction administration – Close out of the project and final punch list

Design Process (cont.) The first set of drawings, the schematics: – Determine the function of the building – Illustrate the proposed components of the layout – Designate required spaces per code The architect and engineer then finalize the drawings based on the site information to ensure compliance with local codes. Material selections are confirmed and implemented into drawings.

Design Process (cont.) Drawing production and attainment of permits can take 8–12 months. Construction cannot commence without permits, which can lead to work stoppage and delays. Permit attainment varies by local code officials, but usually requires a site layout plan.

Construction Process Three to four potential contractors should be solicited for bids. – Interview a number of contractors to ensure the best price for the job. – Use references! – Thoroughly review bids to determine a good fit. Consider cost savings over time versus the immediate savings. Choose durable materials over cheap materials.

Construction Process (cont.) Timeline for completion not only depends on size, but also the delivery of supplies and materials. Construction typically takes 8–12 months to complete, but unique materials can severely delay the project. Weekly design meetings are typically common. Design decisions (e.g., light fixture choices, carpet colors) can also delay the project.

Insurance Owners, contractors, and designers should all carry insurance to protect themselves throughout the process. Liability insurance protects against failure of the architecture and/or engineering of the building. Accident/injury insurance protects contractors if employees get injured while on site. Builders risk insurance protect the owner from theft of materials, fire, destruction by Acts of God, and injuries.

Building Green The design, construction, building, and maintenance of facilities involve a great deal of energy, water, and other resources that create considerable waste and impact the environment and ecosystem (EPA, 2012). Green building is a requirement of the design-build process (although requirements vary by area). There are a host of specified materials and techniques that are renewable and reusable. Builders often take care to install mechanical and electrical systems that reduce our carbon footprint and are energy efficient.

Building Green (cont.) Pervious materials: allow water to escape from the building or site, which allows the water to soak naturally into the ground. Impervious surfaces, like cement pavement, prevent precipitation from naturally soaking into the ground causing water to run rapidly into storm drains, sewer systems, and drainage ditches. Leads to problems such as: – Flooding, erosion, and turbidity – Habitat destruction – Changes in stream flow – Sewer overflows and infrastructure damage – Contaminated streams, rivers, and coastal water