Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

of LFD Compensation Study S1 Global Cryomodule
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Lorentz force detuning measurements on the CEA cavity
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
Power Requirements for High beta Elliptical Cavities Rihua Zeng Accelerator Division Lunds Kommun, Lund
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Tom Powers LLRF Systems for Next Generation Light Sources LLRF Workshop October 2011 Authored by Jefferson Science Associates, LLC under U.S. DOE.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
RF Cavity Simulation for SPL
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Challenges of PIP-II Warren Schappert Microphonics Workshop 8 Octobe 2015.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
LFD and Microphonics Suppression for PIP-II Warren Schappert April 15, 2014.
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
Superconducting RF: Resonance Control Presented by Yuriy Pischalnikov for W. Schappert, Y.Pischalnikov, J.Holzbauer PIP-II Machine Advisory Committee 15.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Current Status of PIP-II Resonance Control W. Schappert.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Experience with high loaded Q cavity operation at HZB
Test of the dressed spoke cavity
WP5 Elliptical cavities
Yuriy Pischalnikov Warren Schappert (FNAL)
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
LINAC AG • IAP • Goethe Universität Frankfurt
LCLS II SRF Cavity Tuner (developed by FNAL)
Tuner system Zhenghui MI 2017/01/17
Mechanical setups Lorentz Force Detuning System Setup
Test plan of ESS HB elliptical cavity
High Gradient Cavities: Cost and Operational Considerations
Cavity resonance control
Summary, Working Group 4 Superconducting RF
Resonance Control for Narrow-Bandwidth, SRF Applications
First High Power Test of the ESS Double Spoke Cavity package
Strategic Communications at TRIUMF
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015

SRF Cavity Detuning SRF cavity cells often formed from thin (2-4mm) sheets of pure niobium to allow them to be cooled below superconducting transition temperature –Thin walls make cavities susceptible to detuning from vibration –Detuned cavities require more RF power to maintain accelerating gradient –Providing sufficient RF reserve power to overcome cavity detuning increases both capital and operational cost of machine Controlling cavity detuning critical for current generation of machines, (LCLS-II, PIP-II, ERLs, etc.) that employ very narrow bandwidth cavities –For machines with very narrow bandwidth cavities, e.g. ERLs, detuning can be the major cost driver for the entire machine 3/10/2015Warren Schappert | P2MAC_20152

Cost of Cavity Detuning Detuned cavities require more RF power to maintain constant gradient PEAK detuning drives the RF costs Beam will be lost if RF reserve is insufficient to overcome PEAK detuning –Providing sufficient reserve increases both the capital cost of the RF plant and the operating cost of the machine 3/10/2015 Warren Schappert | P2MAC_2015 3

Controlling Cavity Detuning Cavities may be detuned by either deterministic sources or non- deterministic sources –Deterministic sources include Radiation pressure on cavity walls (Lorentz Force) –Non-deterministic sources include Cavity vibrations driven by external noise sources Helium pressure fluctuations Cavity detuning can be controlled using either passive or active measures –Passive measures include Suppressing external vibration sources Reducing cavity sensitivity to sources of detuning, e.g. df/dP, LFD,… –Active measures include Sensing cavity detuning in real-time and using piezo or other actuators to actively cancel detuning –Deterministic sources may be cancelled using feed-forward –Non-deterministic sources require feed-back 3/10/2015Warren Schappert | P2MAC_20154

NfQ0Q0 r/QEL Effective VoltageCurrentControlLossesP Beam MHz10 9  MV/mmMVmA % kW HWR SSR SSR LB HB Controlling Detuning in the PIP-II Cavities PIP-II design calls for narrow bandwidth (f 1/2  30 Hz) cavities operating in pulsed mode –Narrow bandwidth makes cavities susceptible to vibration induced detuning –Pulsed mode LFD can excite vibrations PEAK detuning of PIP-II cavities must be limited to 20 Hz or less –PIP-II cavities will require active detuning compensation of both LFD and microphonics during routine operation Will require combination of –best LFD compensation achieved to date –AND best active microphonics compensation achieved to date –AND 24/7 operation over hundreds of cavities for several tens of years No examples of large machines that require active detuning control during routine operation currently exist 3/10/2015Warren Schappert | P2MAC_20155

LFD Compensation at FNAL Adaptive feed-forward LFD compensation system developed at FNAL for ILC cavities System tested with four distinctly different cavity designs during S1G tests at KEK in 2010 –Uncompensated detuning ranged between several tens to several hundreds of Hz depending on the design –Compensated detuning limited to <20 Hz in all four cavity types System is in routine use in NML/CM2 and HTS 3/10/2015Warren Schappert | P2MAC_20156

Microphonics Compensation at FNAL 1.3 GHz elliptical cavities Damp individual mechanical resonance lines by 15 dB 1 st SSR1 prototype –Fixed frequency/ fixed amplitude RF with piezo feedback –Frequency stability 0.45 Hz RMS –Magnitude stable to 0.10% RMS 0.63% Peak over 20 minutes 3/10/2015Warren Schappert | P2MAC_20157

Adaptive Feedforward LFD Compensation Learning phase –Apply a series of short stimulus pulses to the piezo at different delays with respect to the RF Pulse,S(t Piezo,n Pulse ) –Measure the detuning response of the cavity during the flattop, R(t Flattop,n Pulse ) –Calculate the transfer function, T = (S T S )-1 (S T R) Equivalent to CW measurement of piezo impulse response Compensation Phase –Measure the detuning during the flattop, D(t Flattop ) –Determine piezo pulse required to cancel out detuning, P = -(T T T )-1 (T T D) –Iterate to suppress any residual detuning 3/10/2015Warren Schappert | P2MAC_20158

Detuning Control Program for PIP-II Demonstration of feasibility is current focus Focus must shift at some point to engineering a robust integrated electro-mechanical control system Reliable operation can only be ensured by extensive program of testing of both components and integrated system 3/10/2015Warren Schappert | P2MAC_20159 Demonstrate CW Microphonics Compensation Demonstrate Pulsed LFD Compensation System Engineering System Validation and Testing Prototype Integrated Electro-mechanical Controller Development

Feasibility of LFD Compensation for PIP-II LFD compensation measurements using previous SSR1 prototype –Short test –Good results but do not meet PIP-II specs SSR1 Pulsed mode studies with prototype tuner and prototype coupler will commence shortly –Slower fill –Improved understanding 3/10/2015Warren Schappert | P2MAC_ Detuning UncompensatedCompensated GradientFlattopFull PulseFlattop MV/mHz

Feasibility of Microphonics Compensation for PIP-II Very encouraging results from recent test of SSR1 prototype in STC provide reason for CAUTIOUS optimism –  Detuning =11 mHz in open loop RF over 2 hour period Piezo but no slow tuner Narrow bandwidth power coupler Resonance frequency stabilized using a combination of –Feed-forward LFD compensation –Fast feed-back on forward/probe phase –Slow feedback on detuning –Synchronous down-conversion –Almost two orders of magnitude improvement compared with best previously published results (HoBiCaT) –More than an order of magnitude compared to best previous results at FNAL More tests in immediate future using prototype tuner and power coupler 3/10/2015Warren Schappert | P2MAC_201511

Integrated Electro-Mechanical Controller Measure SSR1 mechanical transfer functions –Detuning response to mechanical and LFD excitations as a function of frequency Extract low order approximation to transfer mechanical functions –Minimal State Space Realization (MSSR) algorithm of Kalman and Ho Construct optimal coupled electro-mechanical filters and controllers from low-order transfer functions –Kalman filter –Linear Quadratic Gaussian Regulator Recursive, weighted, least-squares fit at each point in time minimizes quadratic cost function that depends on transfer- functions and noise covariance

Detuning control crosses boundaries between divisions and between disciplines –Robust system required for machine operation Focus must shift need to shift towards engineering high- reliability system –Integration of algorithms with LLRF control system –Will require extensive testing of all hardware, firmware, software System Engineering for PIP-II 3/10/2015Warren Schappert | P2MAC_ Compensation Algorithms RF Signals Piezo Tuner Cryogenic Fluctuations External Vibrations

Component and Integration Testing EXTENSIVE component and integration testing REQUIRED for reliable operation Experience at FNAL with blade tuner for ILC cavities –EVERYTHING THAT CAN GO WRONG WILL GO WRONG Experience at other labs –MSU –JLab –SNS –Cornell –HoBiCaT 3/10/2015Warren Schappert | P2MAC_201514

Cross-disciplinary Challenges Minimizing cavity detuning requires careful optimization across entire machine –Cavity design, cryomodule design, RF plant, cryogenic system design, civil engineering Cross-disciplinary challenges may be more daunting than technical challenges 3/10/2015Warren Schappert | P2MAC_ Large potential costs if any aspect ignored –Small design changes may have large impact on cavity detuning –Cost of fixing microphonics afterwards could be very high Some structure within PIP-II organization will be required to coordinate effort amongst groups and disciplines Education and communication Vibration related reviews

Looking Forward Upcoming tests of SSR1 offer opportunity to –Finalize CW algorithms –Investigate pulsed mode operation –Measure expected RF and performance parameters Focus must then shift to integration of algorithms into an integrated electro-mechanical control system –Will require close collaboration between TD/RC and AD/LLRF groups Robust system will require careful system engineering and extensive testing of all hardware, firmware and software Need to arrive at consensus on mechanism(s) within PIP-II organization to coordinate detuning control efforts 3/10/2015Warren Schappert| P2MAC_201516

Conclusions Controlling cavity detuning will be critical for successful operation of PIP-II because of narrow cavity bandwidths (f 1/2 ~ 30 Hz) –Narrow bandwidths would be challenging even with CW operation alone –Pulsed mode operation brings significant additional complications All possible passive measures must be exploited but active control will still be required –Will require both best LFD and best microphonics compensation achieved to date operating reliably over many cavities and many years Early test results provide reason for CAUTIOUS optimism –There are no existing examples of large machines that require active control of detuning during routine operation Cross-disciplinary challenges may be more difficult to solve than technical challenges (which are still considerable) Minimizing cavity detuning requires optimization of entire machine Will require active coordination across divisions and across disciplines 3/10/2015Warren Schappert | P2MAC_201517