New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.

Slides:



Advertisements
Similar presentations
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Advertisements

STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
ALT Power Systems  Geothermal Heating  Radiant floor Heating  Reflective Foil Insulation.
Plantronics Secret Green buildings for developing, manufacturing and marketing green products A complete Green Life Cycle.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
RETScreen® Energy Efficiency Projects
Energy Conserving Alternatives HVAC 15a CNST 305 Environmental Systems 1 Dr. Berryman.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Student Activities Centralized Training Session 5 Design Competition.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Utility Bill Analysis WEATHERIZATION ENERGY AUDITOR SINGLE.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth H.J. Heinz Distribution Center.
Green Building Demonstration Project Adam Saling City of San Diego.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Nate Mooney | Mechanical Option Advisor: William P. Bahnfleth, PH.D., PE The Pennsylvania State University Architectural Engineering Spring Ames.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Paul Roberts Senior Thesis 2010 Construction Management.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Architectural Design of Large Hotel and Energy Used for Internal Space Thermal Control by Dr Bin Su School of Architecture and Landscape Architecture UNITEC,
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Student Activities Centralized Training
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Thermal Energy Storage
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Feasibility of Ice Storage
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
the Franklin Square Hospital Center
Mammoth Caves National Park, Kentucky
Virtua Replacement Hospital -Voorhees NJ
Architectural Engineering, The Pennsylvania State University
Electricity Cost and Use – FY 2016 and FY 2017
Presentation transcript:

New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth Building Statistics Building Name: DE Hospice – New Castle Center Location and site: New Castle, DE Building Owner: Delaware Hospice Occupancy type: Medical Size: 65,000 SF Number of stories: Two-story Delivery method: GMP, CM at risk 2

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Project Team Owner: Delaware Hospice Architect: Reese, Lower, Patrick & Scoot Construction Manager: Skanska Structural Engineer: Macitosh Engineer Mech./Elec./Plumbing Engineer: Reese Engineering Food Service Consultant: JEM Associates Interior Designer: Reese, Lower, Patrick & Scoot Landscape Architect: Rummler Associates Civil Engineer:Landmark Engineering Building Statistics Dates of Construction Construction Begins: August, 2011 Start Exterior Façade: January, 2012 Construction Complete: September,

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Zones 4

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Zones 5

6

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Existing Conditions Annual Energy Consumption Load Electricity (kWh)Natural Gas (kWh) Percent of Total Energy (%) Heating 21, % Cooling 158, % Supply Fans 448, % Pumps 257, % Lighting 438,502 31% Receptacle 88, % 7

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Systems Evalvation 8

Hybrid Geothermal System 9

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Hybrid Geothermal System 10

Hybrid Geothermal System JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT OCT NOV. DEC. Red = EWT HP Blue =GHXPurple = Supplement 11

Hybrid Geothermal System JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT OCT NOV. DEC. Red = EWT HP Blue =GHXPurple = Supplement 12

Hybrid Geothermal System Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT OCT NOV. DEC. 175 F 144 F 113 F 82 F 54 F 20 F 97 F Red = EWT HP Blue =GHXPurple = Supplement 13

Hybrid Geothermal System 14

Hybrid Geothermal System Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion 15

Electrical Breadth Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion Electrical 3360 sq. ft sq. ft. $191,475 investment, $134,028 after rebates $4,059 annual savings years pay back period 16

Presentation Outline Building Overview Existing conditions System Evaluation Proposed Redesign Mechanical Depth Electrical Breadth Conclusion In conclusion on my research of ground source heat pump or hybrid geothermal for DE Hospice, I find that hybrid geothermal is a great choice for a more green design with a lower first cost. If ground source heat pumps can be afforded it would be better to choice them in the long run. With only saving $53,000 a year, it would only take just over six year of annual savings to make up for the $319,180 in equipment cost. 17

Appendix Scott Hackel. “Hybrid Ground-Source Heat Pump Installations: Experiences, Improvements and Tools.” Energy Center of Wisconsin. June 30, 2011 “2007 ASHRAE Handbook: HVAC Applications.” American Society of Heating, Refrigeration, and Air-Conditioning Engineers Carol Marriott. “3 Simple Approaches to Energy Efficiency: Optimal Air, Energy Recovery, Geothermal” ASHRAE Journal July (2006): pp Al Barfield. “Hybrid Geothermal Heat Pump for Beachfront Hotel” ASHRAE Journal Sept. (2006): pp Stephen P. Kavanaugh and Kevin Rafferty. “Ground-Source Heat Pumps: Design of Geothermal System for Commercial and Institutional Buildings” 1997 American Society of Heating, Refrigeration, and Air-Conditioning Engineers Reference 18

Questions? 19